Lendlease Group · ASX:LLC

Lendlease — Investor Day (May 2011)

90 slides from Lendlease's investor day presentation, May 25, 2011

  1. Slide 1: Lend Lease Investor Day presentations

    ASX Announcement Lend Lease Investor Day presentations For personal use only 25 May 2011 Attached are the presentations to be given today by Lend Lease senior executives at its Investor Day. For further information, please contact: Investor Relations: Corporate Affairs: Sally Cameron Iwona Polski Gr

  2. Slide 2: Lend Lease Investor Day

    Lend Lease Investor Day 25 May 2011 For personal use only

  3. Slide 3: Important notice

    Important notice For personal use only This presentation has been prepared in good faith, but no representation or warranty, express or implied, is made as to the accuracy, adequacy or reliability of any statements, estimates, opinions or other information contained in the presentation (any of which

  4. Slide 4: Agenda

    Agenda For personal use only 9.00 Strategy and business overview 9.45 Financial overview 10.15 Morning tea 10.45 Infrastructure update 12.00 Americas update 12.30 Australia update 1.15 Lunch 2.15 Major projects update 3.00 Closing comments

  5. Slide 5: Strategy and Business Overview

    For personal use only Steve McCann Group Chief Executive Officer & Managing Director Strategy and Business Overview

  6. Slide 6: Agenda

    Agenda For personal use only 1. Update on safety 2. External business environment 3. Key priorities for the Group 4. Pipeline of opportunities 5. Strategy update 6. Continued focus on key trends 7. Progress on strategy to date 8. Key strategic deliverables 2011 9. Operational update Asia 10. Operati

  7. Slide 7: Good progress on safety

    Good progress on safety For personal use only Total Lost Time Injuries per Region 1 800 600 400 200 0 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 As at AUSTRALIA ASIA AMERICAS EMEA May Total Fatalities per Region 1 10 9 8 7 6 5 4 3 2 1 0 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 As at AUSTRALIA

  8. Slide 8: External environment favourable

    External environment favourable For personal use only Region Outlook Opportunity/ Impact for Lend Lease  Favourable economic conditions present attractive opportunities across most sectors, particularly infrastructure  Short term impact from weak consumer sentiment Australia  Concerns of two spee

  9. Slide 9: Key priorities for the Group

    Key priorities for the Group For personal use only  Integrate Valemus infrastructure business and deliver on earnings accretion  Integration of business on track  Strong infrastructure backlog driven by Abigroup  Progress major projects • Focus on portfolio management • Position offshore busines

  10. Slide 10: Significant pipeline of opportunities

    Significant pipeline of opportunities For personal use only Dec 2010 Funds under management (A$b) 10.7 End development value of urban regeneration projects (A$b) 25.0 Construction backlog revenue (A$b) (including Valemus) 11.9 Retail assets under management (A$b) 9.4 Backlog of residential units 89,

  11. Slide 11: Strategy update

    For personal use only Strategy update

  12. Slide 12: Our strategic direction

    Our strategic direction Our Strategic To be the Leading International Property and For personal use only Direction: Infrastructure Group Leading International Sectors Segments Property and  Development Be in the top 3 Infrastructure are our  Construction Focus on 4 core industry leaders within cor

  13. Slide 13: Our segment position

    Our segment position For personal use only Investment Development Construction Services Ownership Management  Strong capabilities in project  A leading  Focused  A leading investment predominately on management,  Property, asset development management co-investments design and and facilities ma

  14. Slide 14: Continued focus on key trends

    For personal use only Continued focus on key trends  Leading urban renewal projects in Australia, UK and Singapore Urban Regeneration  Focus on delivery and execution  No. 1 senior living platform in Australia Ageing Population  70 retirement villages and 32 aged care facilities  Australia - si

  15. Slide 15: Our strategic pathway

    Our strategic pathway LEAD Outperformance For personal use only  BUILD Disciplined Expansion  World class property and RESTORE  Right Structure  Reshape portfolio infrastructure solutions RESTORE A Focused Core Business company  Growth platforms  Right structure  Strong integrated offering 

  16. Slide 16: Key strategic deliverables

    Key strategic deliverables – 12 to 24 months For personal use only BUILD Major Development  Successful delivery and execution of secured Projects projects  Successful integration of the business Infrastructure  Establish appropriate risk framework  Reshape portfolio  Extract synergies  Growth

  17. Slide 17: Operational update

    For personal use only Operational update

  18. Slide 18: Earnings split

    Earnings split Sector Earnings Split 1 For personal use only June 2010 Proforma2 June 2010 Actual Investment Project Management Management Investment 22% & Construction Management Project 20% 28% Management & Construction 37% Infrastructure Development 11% Infrastructure Development Development 14%

  19. Slide 19: Asia business update

    Asia business update For personal use only Dec Dec Key Metrics 2010 2009  Additional mixed use development Operating Profit after tax (A$m) 15.8 21.5 sites coming to market in Singapore Construction new work 412.0 156.8  Global client strategy in pharma and secured (A$m) Opportunities life science

  20. Slide 20: Europe business overview

    Europe business overview Dec Dec Key Metrics 2010 2009 For personal use only Profit after tax (million) 94.6 64.0  Focus on large projects (Greenwich Construction new work secured (m) 764.5 540.0 Peninsula, Elephant & Castle, Stratford Dec June International Quarter) 2010 2010 Construction backlog

  21. Slide 21: Financial Overview

    For personal use only Brad Soller Group Chief Financial Officer Financial Overview

  22. Slide 22: Agenda

    Agenda For personal use only 1. Capital allocation 2. Future capital allocation 3. Sources of capital 4. Key debt metrics 5. Debt maturity profile 6. Pipeline 7. Key financial targets

  23. Slide 23: Capital allocation

    Capital allocation TARGET Risk Adjusted Capital 1 For personal use only Europe Australia 19% Region >~60% All other regions Amercias No more than ~20% each 14% Asia Australia 5% 62% Services Development 5% ~35 – 45% Construction Development 38% ~30 – 40% Ownership Segment Investment Management 23% ~

  24. Slide 24: Future capital allocation

    Future capital allocation Investment pipeline of between A$1-1.5b over next 3 years1 For personal use only Region Sector Australia  Major development projects  Lend Lease communities  Co-investment in funds  PPP equity positions Americas  Lend Lease DASCO healthcare pipeline Asia  Retail devel

  25. Slide 25: Sources of capital

    Sources of capital For personal use only Source of Capital Expected position Retained earnings  Current dividend payout ratio of between 40% to 60% of net operating profit after tax  DRP to remain active Portfolio Management  Have sold circa A$2.3b of assets since 2006  Number of mature assets t

  26. Slide 26: Key debt metrics

    Key debt metrics For personal use only Dec 2010 June 2010 Credit Rating - S&P/Moody’s BBB- / Baa3 BBB- / Baa3 (Stable) (Stable) Net (cash) / debt1 (A$m) 29.5 (19.7) Gearing excluding Valemus 2 0.4% Net cash position Pro forma gearing including Valemus 6.7% Undrawn facilities (A$m) 571.5 688.6 Weight

  27. Slide 27: Debt maturity profile

    Debt maturity profile For personal use only Debt Facilities Maturity Profile A$m - Post Proposed A$ Club Refinance 800 700 600 Bluewater 500 400 300 USPP A$ Club UK RCF New A$ UK Bond 200 New A$ 100 A$ Term USPP 0 USPP FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY22 26

  28. Slide 28: Pipeline delivers certainty of future earnings

    Pipeline delivers certainty of future earnings For personal use only FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Barangaroo South RNA Elephant & Castle Stratford International Quarter Australian residential Lend Lease DASCO Jurong 27

  29. Slide 29: Key financial targets – tracking well

    Key financial targets – tracking well For personal use only Metric Target 31 Dec 2010 Return on Equity  Greater than 15% per annum 13.4%1  Committed to investment grade BBB- / Baa3 Credit Rating credit rating (Stable) Gearing2  <20% 6.7%3 Interest Coverage Ratio  >5x 6.5x Annuity Income  20% of

  30. Slide 30: Infrastructure Update

    For personal use only Scott Charlton - Group Director of Operations Peter Brecht - Managing Director, Infrastructure Infrastructure Update

  31. Slide 31: Agenda

    Agenda For personal use only 1. Strategic rationale 2. Market dynamics 3. Integration review 4. Synergies 5. Capabilities and markets 6. Safety 7. Trading update 8. Major projects 9. Risk approach 10. Backlog/revenue split

  32. Slide 32: Acquisition in line with strategy

    Acquisition in line with strategy For personal use only Strategic  In line with strategy to capitalise on key growth trend of infrastructure rationale  Ability to self perform internal Lend Lease infrastructure work  Large platform in the growing engineering and construction sector with significa

  33. Slide 33: Market dynamics

    Market dynamics Market Outlook Key Insights For personal use only  Market outlook for engineering / civil construction more robust than identified in the due diligence process  Strong growth predictions over medium to long term:  Asia’s resource demand likely to influence resource sector growth i

  34. Slide 34: Integration review

    Integration review For personal use only  Infrastructure business reporting into the Group Infrastructure  Limits of Authority arrangements and matrix implemented reporting  Probity arrangement and procedures established  No new material project issues identified  Underway to identify best oper

  35. Slide 35: Synergies

    Synergies  Quick win cost synergies have been identified to date in corporate spend For personal use only areas  Potential revenue synergies identified  Marine and utilities infrastructure on Barangaroo South  Infrastructure delivery on communities/residential projects  Infrastructure services

  36. Slide 36: Capabilities and markets

    Capabilities and markets For personal use only Capabilities  Civil infrastructure  Building  Specialist engineering and asset management services Market sectors  Roads, bridges, tunnels, water, rail, marine  Oil & gas, power, telecommunications, mining  Social and correctional facilities, comm

  37. Slide 37: Safety

    Safety For personal use only  Leveraging best practice between Lend Lease and infrastructure businesses  Continued year on year reduction in Lost Time Injury Frequencies  Safety goal of zero harm – this aligns with Lend Lease goal of Incident & Injury Free  All companies are focusing on lead ind

  38. Slide 38: Trading update

    Trading update For personal use only  Good start to the calendar year with A$756m of new work  Non residential building slow but opportunities in health and defence  Shortlisted on A$1b Victorian Comprehensive Cancer Centre  Shortlisted on a number of defence contracts  Engineering/infrastructu

  39. Slide 39: New secured and pending projects – 2011

    New secured and pending projects – 2011 Project Total *Project Type of Contract Location For personal use only Value A$m Adelaide Convention Centre 350 Managing contractor SA Holbrook Bypass 168 Schedule of rates NSW City Central Tower 8 164 Design and construct SA Reid Alexander Interchange 48 Desi

  40. Slide 40: Risk approach

    Risk approach For personal use only  Solid risk management discipline  Comprehensive limits of authority and probity arrangements have been put in place  Largest fixed price contract size circa A$1b  No new material project issues identified  Alignment and best practice sharing of risk manageme

  41. Slide 41: Backlog/ revenue split – December 2010

    Backlog/ revenue split – 31 December 2010 Backlog by market Revenue by market For personal use only Services Services 12% 17% Engineering Building construction 23% 48% Engineering construction Building 65% 35% Backlog by contract type Revenue by contract type Services 12% Services 17% Fixed price Fi

  42. Slide 42: Core Competencies and Growth Markets

    For personal use only David Jurd – Managing Director, Abigroup Ian Luck – Managing Director, Baulderstone David Marchant – Managing Director, Conneq Core Competencies and Growth Markets

  43. Slide 43: Agenda

    Agenda For personal use only 1. Abigroup core competency 2. Peninsula Link update 3. Abigroup growth markets 4. Baulderstone core competency – Building/ defence 5. Baulderstone growth markets 6. Conneq core competencies

  44. Slide 44: Abigroup core competency - roads

    Abigroup core competency - roads For personal use only Market position  One of the leading players in road sector  Large earthmoving fleet and self performing culture key competitive advantages in tendering for road projects Current Major Projects  A$1.95b Ipswich Motorway Upgrade Alliance (Qld)

  45. Slide 45: Peninsula Link update

    Peninsula Link update  Project on time and budget For personal use only  Awarded February 2010, completion December 2012  Design 95% complete  Peak monthly expenditure of A$25m achieved Peninsula Link - Independent Certified Progress $700 $650 $600 $550 $500 $450 $400 $350 $300 $250 $200 $150 $1

  46. Slide 46: Abigroup growth market - rail

    Abigroup growth market - rail Competitive advantages For personal use only  Ownership of plant and equipment  Self performing culture  Specialist skills Current projects  Lawson alliance (NSW)  Pacific National (QLD) Significant opportunities  Regional rail link (VIC)  Package B – A$500m (40%

  47. Slide 47: Baulderstone core competencies – building/ defence

    Baulderstone core competencies – building/ defence Building For personal use only  Significant opportunities remain in areas of strength - health, education (universities) and corrections, hospitality and commercial  Actively working to foster long-term relationships with blue-chip clients – both

  48. Slide 48: Baulderstone growth market - marine

    Baulderstone growth market - marine For personal use only Marine  Fastest growing infrastructure sector in Australia  Key to boosting Australia’s mining exports  Opportunity to leverage off innovative design solution at Port Botany  Excellent relationship with dredging company Jan De Nul  Prove

  49. Slide 49: Conneq core competencies

    Conneq core competencies For personal use only Power  Design and construction of generation and transmission assets  Asset management of generation, transmission and distribution assets Infrastructure  Design and construction of gas transmission and broadband  Asset management of water, gas, tel

  50. Slide 50: Conneq core competencies

    Conneq core competencies For personal use only Resource  Materials handling and coal seam gas collection and processing  Asset management of mining and mineral processing and oil and gas assets Industrial  Design and construction of chemical plants, fuel terminals and piping  Asset management of

  51. Slide 51: Business Update - Americas

    For personal use only Bob McNamara Chief Executive Officer, Americas Business Update - Americas

  52. Slide 52: Agenda

    Agenda For personal use only 1. Overview of business environment 2. Lend Lease in the Americas 3. Project Management & Construction 4. Infrastructure development 5. Development – Lend Lease DASCO 6. Key priorities

  53. Slide 53: Overview of business environment

    Overview of business environment For personal use only Sector Outlook Opportunity/ Impact for Lend Lease General economic conditions  GDP growth of 2.9% in FY2012 Construction sector  New work secured greater than backlog burn  Military program coming to an end but long tail of work Infrastructur

  54. Slide 54: Lend Lease in the Americas

    Lend Lease in the Americas Key Areas of Focus  Project Management & Construction For personal use only  Ranked 1st in multifamily, 5th in healthcare  260 projects  Profit coming off low base / resized cost base Canada  Infrastructure Development  22 military bases – market share of 18.2% Unite

  55. Slide 55: Project Management & Construction

    Project Management & Construction For personal use only Dec Dec  Settlement reached with NY City DOI – restores Key Metrics 2010 2009 standing to win NYC agency work Operating profit after (3.2) (19.9) tax (A$m)  WTC – liabilities, if any, are now limited to Operational available insurance Constru

  56. Slide 56: Project Management & Construction project experience

    Project Management & Construction project experience For personal use only Chase Bank Rebranding, Various Locations, US One Museum Park East, Chicago, Illinois El Aleph, Buenos Aires, Argentina 55

  57. Slide 57: Infrastructure development

    Infrastructure development For personal use only Dec Dec Key Metrics 2010 2009  Secured US$350m second phase (Group B) of Operating profit after tax 20.2 27.2 Operational Privatization of Army Lodgings program (A$m) Update  Reached financial close on US$377m Number of projects 22 20 Wainwright Gre

  58. Slide 58: Infrastructure development project experience

    Infrastructure development project experience For personal use only Camp Lejeune, Camp Lejeune, North Carolina Army Hawaii Family Housing, Oahu, Hawaii Fort Drum Mountain Community Homes, Fort Drum, New York 57

  59. Slide 59: Development – acquisition of Lend Lease DASCO

    Development – acquisition of Lend Lease DASCO For personal use only  National leader in the development, financing, leasing and management of medical facilities  Acquisition price of US$10m and an earn out What they do over a 4 year period  Existing development pipeline consisting of 10 projects

  60. Slide 60: Healthcare project experience

    Healthcare project experience For personal use only HCA Sky Ridge Medical Center, Lone Tree, Colorado New York-Presbyterian Hospital - Vivian and Seymour Milstein Family St. Joseph's Hospital, North Lutz, Florida Heart Center, New York, NY 59

  61. Slide 61: Key priorities for the Americas

    Key priorities for the Americas  Develop US healthcare strategy – For personal use only strong pipeline of opportunities  Leverage project management & construction into market recovery  Continue growth focus in Latin America with concentration of activity in Argentina and Mexico, and some client

  62. Slide 62: Business Update - Australia

    For personal use only Mark Menhinnitt Chief Executive Officer, Australia Business Update - Australia

  63. Slide 63: Agenda

    Agenda For personal use only 1. Overview of business environment 2. Lend Lease in Australia 3. Project Management & Construction 4. Infrastructure Development 5. Development – Mixed Use 6. Development – Communities 7. Overview of communities market 8. Communities portfolio strategy update 9. Senior

  64. Slide 64: Overview of business environment

    Overview of business environment Sector Outlook1 Opportunity/ Impact for Lend Lease For personal use only General economic  Some short term weakness from natural disasters and interest rate environment conditions  Expected to grow at 4% per annum for next 5 years, main contributor being Constructi

  65. Slide 65: Lend Lease in Australia

    Lend Lease in Australia  Project Management & Construction For personal use only Operating profit after tax as at  Leading player in commercial and healthcare 31 December 2010*  Strong internal pipeline and healthcare opportunities Investment  Infrastructure Development Management 12%  Signific

  66. Slide 66: Project Management & Construction

    Project Management & Construction For personal use only Dec Dec  Profit weighted to second half of financial year Key Metrics 2010 2009 Operating profit after tax  Government activity including stimulus spend has 43.5 61.2 Operational supported recent business growth (A$m) Update  BER schools pro

  67. Slide 67: Infrastructure Development

    Infrastructure Development For personal use only  Small loss in the first half of the financial year due to costs of bidding on projects Dec Dec Operational  1 of 3 shortlisted on Victoria Comprehensive Key Metrics 2010 2009 Update Cancer Centre in Melbourne Operating profit after tax (A$m) (3.8)

  68. Slide 68: Development - Mixed Use

    Development - Mixed Use For personal use only Dec June  Concept Plan amendment approved Key Metrics 2010 2010  Site clearing completed Number of zoned 8,625 6,635 built-form units Barangaroo  Planning approval received for first office tower South  Basement due to commence in July Number of unzo

  69. Slide 69: Development - Communities

    Development - Communities For personal use only  NSW/ ACT remain strong, Victoria is solid while South Australia and South East Queensland are Dec June Key Metrics 2010 2010 Operational subdued Number of zoned Update  Flood impacting sentiment in Queensland residential land lots 38,170 31,960  Ta

  70. Slide 70: Overview of communities market

    Overview of communities market Consumer Sentiment Index Monthly observations ending April 2011  Quality of enquiry at Lend Lease projects For personal use only 130 improving, however conversion time has 120 increased on back of decline in sentiment 110 Index (100=netural) 100 90  Affordability pre

  71. Slide 71: Communities portfolio strategy update

    Communities portfolio strategy update For personal use only  Capital model to match size and nature of project – land management, joint ventures or direct ownership  New project acquisitions focused on replenishing existing portfolio in affordable growth corridors  Recent entry into WA market Maw

  72. Slide 72: Senior Living

    Senior Living For personal use only Dec June  FY2011 reflects first full year of 100% Key Metrics 2010 2010 Operational ownership of Primelife Number of retirement villages 70 70 Update  Aged Care – has increased EBITDA per bed by Number of retirement units 12,416 12,357 >35% since acquisition Num

  73. Slide 73: Investment Management

    Investment Management For personal use only Dec Dec  FUM growth of over 15% per annum over last 5 Key Metrics 2010 2009 Operational years – strong growth expected to continue Operating profit after Tax (A$m) 17.2 11.9 Update  Continued strong performance across key funds Dec June  Integration of

  74. Slide 74: Key priorities

    Key priorities For personal use only  Grow construction backlog  Focus on health pipeline and convert internal opportunities  Leverage multi-sites/ capital services platform  Deliver key development projects  Achieve key planning outcomes, secure tenants and capital partners  Replenish communi

  75. Slide 75: Major projects update

    For personal use only David Hutton Group Head of Development Major projects update

  76. Slide 76: Agenda

    Agenda For personal use only 1. Barangaroo South, Sydney 2. RNA Showgrounds, Brisbane 3. Victoria Harbour, Melbourne 4. Jurong Gateway, Singapore 5. Elephant & Castle, London 6. Stratford International Quarter, London

  77. Slide 77: Barangaroo South, Sydney

    Barangaroo South, Sydney For personal use only  Estimated A$6b end value  7.5 hectare site area  Extension of Sydney’s CBD  Development period 10 to 15 years  Up to 490,000 sqm total GFA  Up to 288,000 sqm NLA office  30,000 sqm retail / food and beverage  Approx 775 apartments  250 (approx

  78. Slide 78: Proposed development stages

    Proposed development stages For personal use only 2014/15 R10 R11 C1 C8 C2 C6 2016 R5 C3 C4 C5 R3 C7 R6 2017/18 R4 R7 2020 R2 R8 R9 R1 77

  79. Slide 79: Premier commercial towers

    Premier commercial towers For personal use only  Floor plates of 2,200 – 2,400sqm  Flexible and adaptable workspaces, with inter floor connectivity  Fresh air and higher ceilings, abundant natural light, aspect and views  State of the art technology with a precinct wide ICT infrastructure  Clim

  80. Slide 80: Current Status

    Current Status For personal use only Planning Approvals  Concept plan approved (490,000sqm including hotel) December 2010  Basement approved November 2010  C4 (first commercial tower) approved March 2010  Planning of next tower (C5) underway for lodgement - June 2011  3rd Commercial Tower (C3)

  81. Slide 81: The RNA Showgrounds, Brisbane

    The RNA Showgrounds, Brisbane For personal use only  Estimated A$2.5b end value  22 hectare site with 5.5 hectares of land for Private Development  Development period 15 years  Commercial, Residential and Retail  340,000 sqm total GFA  Renewal of RNA Facilities  Industrial Pavilion commenced

  82. Slide 82: Victoria Harbour, Melbourne

    Victoria Harbour, Melbourne For personal use only  Estimated A$4.5b end value  30 hectare site  Developed in partnership with VicUrban  Project commencement 2001  Project completion 2021  350,000sm total office GFA, 2,800 apartments, 22,000sqm retail and 20,000sqm of community space  45% comp

  83. Slide 83: Jurong Gateway, Singapore

    Jurong Gateway, Singapore  Estimated SG$1.6b end value For personal use only  25% owned by Lend Lease, 75% by Asian Retail Investment Fund  Heads of Terms for 100% office tower with Singaporean Government Ministry National Development  Retail tenancy discussions progressing with 30% leased to da

  84. Slide 84: Jurong Gateway, Singapore

    Jurong Gateway, Singapore  Planning approval Feb 2011, For personal use only commenced construction April 2011, completion 2014  108,000sqm large scale mixed use suburban development - 3rd largest suburban centre in Singapore  Integrated approach 83

  85. Slide 85: Elephant & Castle, London

    Elephant & Castle, London For personal use only Buckingham  Estimated £1.5b end value Palace  Residential led, mixed use urban Bakerloo & Northern regeneration scheme over 15 years Tube  c2,500 new homes with 25% affordable housing  15,000sqm of retail, restaurant and leisure space  Conditional

  86. Slide 86: Stratford International Quarter, London

    Stratford International Quarter, London For personal use only  Signed £1.3b Conditional Framework Agreement with London & Continental Railways  Creation of a major new commercial district with nearly 400,000sqm of office accommodation across 22 acres  Work is expected to start in 2013  Stratford

  87. Slide 87: Closing Comments

    For personal use only Steve McCann Group Chief Executive Officer & Managing Director Closing Comments

  88. Slide 88: Key priorities for the Group

    Key priorities for the Group For personal use only  Integrate Valemus infrastructure business and deliver on earnings accretion  Focus on execution and delivery of major projects  Ongoing portfolio management • Position offshore businesses for market recovery Darling Quarter, Sydney, NSW 87

  89. Slide 89: Positive outlook

    Positive outlook Significant backlog, development pipeline and access to capital For personal use only  Continued deal momentum  Capital invested is supported by third party equity  Focus on capital recycling  Emphasis on quality and consistency of execution Strong long term outlook with positiv

  90. Slide 90: Lend Lease Investor Day May 2011

    Lend Lease Investor Day 25 May 2011 For personal use only