Canadian Copper, Inc. · CSE:CCI
Canadian Copper — Investor Presentation (November 2023)
16 slides from Canadian Copper's investor presentation, Nov 2, 2023
Slide 1: New Asset, Continued Critical Mineral Growth
2 NOVEMBER 2023 New Asset, Continued Critical Mineral Growth COPPER EXPLORATION Excellent Mining Jurisdiction & DEVELOPMENT IN PROLIFIC Net Zero Exploration & Development BATHURST CAMP Strong Asset Base New Brunswick, Canada Growing Copper Resources 1
Slide 2: Disclaimer
2 NOVEMBER 2023 DISCLAIMER Forward-Looking Information and Statements consideration applied to them. There is no certainty that the PEA will be realized. This presentation contains “forward-looking information” for purposes of applicable Canadian Mr. Eugene Puritch, P.Eng., FEC, CET, President of P&
Slide 3: A Compelling Investment Case for Both Copper & Zinc
2 NOVEMBER 2023 A COMPELLING INVESTMENT CASE FOR BOTH COPPER & ZINC These metals will be driven by similar factors MARKET DEFICIT GREEN ENERGY TRANSITION RENEWABLE POWER • Global copper demand to • Renewable power consumes • Requires significant new double by 2050: 29Mt to +4x more copper infrastruc
Slide 4: Ownership, Financing & Capitalization
2 NOVEMBER 2023 OWNERSHIP, 12% FINANCING & CAPITALIZATION C A P I TA L S T R U C T U R E 48% Share Price (C$) $0.10 40% Current S/O 83.3M Average Volume 50K Market Cap $8.0M Cash $.500M Warrants 7.2M Options 1.6M Fully Diluted 92.1M Retail Investors Founders and Management Puma Exploration Inc. 4
Slide 5: Expanded Project Portfolio
2 NOVEMBER 2023 EXPANDED PROJECT PORTFOLIO Bathurst Mining Camp BELLEDUNE DEEP WATER PORT TURGEON PROJECT Estimated 75M lb Cu+ MURRAY BROOK DEPOSIT Chaleurs Bay M+I 21Mt @ 2.73% Zn, 0.47% Cu, 1.0% Pb, 41 g/t Ag, 0.65 g/t Au Caribou Mine Fully available operating BATHURST milling facility, <10km LEGA
Slide 6: Murray Brook Situated Between Two Former Producing Mines and a Mill
2 NOVEMBER 2023 MURRAY BROOK SITUATED BETWEEN TWO FORMER PRODUCING MINES AND A MILL m 10k 6
Slide 7: Status of Caribou CCAA Process: Three Interested Parties in Restart
2 NOVEMBER 2023 STATUS OF CARIBOU CCAA PROCESS: THREE INTERESTED PARTIES IN RESTART Caribou Mineral Murray Brook Mineral Combining Assets is Resource Estimate Resource Estimate Necessary 7.2Mt M+I, & I 21 Mt M+I New LOM? Maybe 7 Years LOM +13 Years Feed "e. prior to the offer deadline, the Receiver
Slide 8: Canadian Copper's Transformation Underway
2 NOVEMBER 2023 CANADIAN COPPER’S TRANSFORMATION UNDERWAY Majority ownership of large, Drives synergies with open pit was 18Mt deposit Company deposits in the Now +21Mt @ 1.49% CuEq region, near two former mines 98% of Murray Brook Mineral Increased leverage to critical Resources are Measured and me
Slide 9: Canadian Copper: Pure Play Base Metals, Growing Resources, Safe Jurisdiction
2 NOVEMBER 2023 CANADIAN COPPER: PURE PLAY BASE METALS, GROWING RESOURCES, SAFE JURISDICTION +32% 775M lbs CuEq CuEq (Mlbs) Recovered 775 1.49% Open Pit +475% 586 Zinc Copper 43% Metal 40% Contribution 102 9% 9% Silver Lead 2022 Q2 2023 Q3 2023 * US metal prices $4.00/lb Cu, $1.25/lb Zn, $0.95/lb Pb
Slide 10: New Murray Brook MRE Improved Every Metric
2 NOVEMBER 2023 NEW MURRAY BROOK MRE IMPROVED EVERY METRIC! C$115/tonne 21.1 Mt 1.49% CuEq +78% +18% +4% Grade Size Value * US metal prices $4.00/lb Cu, $1.25/lb Zn, $0.95/lb Pb, and $23/oz Ag at $0.76 USD/CAD. 10 * Process recoveries used were 80% Cu, 87% Zn, 75% Pb, and 90% Ag.
Slide 11: Murray Brook Value Enhancement: Leverage Existing Information
2 NOVEMBER 2023 MURRAY BROOK VALUE ENHANCEMENT: LEVERAGE EXISTING INFORMATION Since 2013 +$15M Invested into Asset 98% M&I Improved Hydrology, Resource Metallurgical Geotech, Model & PEA: Understanding: Mine design, 30,000 Increasing Enviro. meters Drilled Recoveries Studies *See press release title
Slide 12: Near-Surface Targets
2 NOVEMBER 2023 NEAR-SURFACE TARGETS 2 MB2019-02 MB2018-03 MB2012-65 0.82%Cu over 34.0m 0.79%Cu, 2.95% Pb-Zn, 29 0.81%Cu, 2.20% Pb-Zn, 33 g/t Incl. 1.42%Cu, 0.15g/t g/t Ag over 99.6m Ag, 0.55 g/t Au over 81.8m Au over 16.3m Incl. 3.04% over 19.0m Incl. 4.07% over 11.0m Cu (%) OPEN Zn (%) 02 58 9- 1
Slide 13: Near Surface Exploration Potential
2 NOVEMBER 2023 NEAR SURFACE EXPLORATION 1 POTENTIAL Copper Stringer Zone 13 See press release titled: “Puma Exploration And Trevali Mining Corporation Drill 1.17 G/T Au, 0.50% Cu And 4.16% Zn + Pb Over 153.2 Meters At The Copper-gold Rich Zone Of The Murray Brook Deposit” disseminated on Globalnews
Slide 14: Within 12 Months
2 NOVEMBER 2023 WITHIN 12 MONTHS 1. New Mineral Resource Estimate at Murray Brook ü 2. Launch Murray Brook West prospecting program ü 3. Launch Murray Brook deposit 12-hole program 4. Issue new PEA for Murray Brook 5. Review regional exploration targets across 18km trend 14
Slide 15: Project Advancement Schedule
2 NOVEMBER 2023 PROJECT ADVANCEMENT SCHEDULE WORK Q3/23 Q4/23 Q1/24 Q2/24 Q3/24 Q4/24 2025 New Mineral Resource Estimate <3MON ü New PEA <6–9MON <3MON Exploration <3MON Met. Optimization <6 MON Permitting Review <6 MON Present Development Plan to Provincial Government 15
Slide 16: Appendix A: 2023 Mineral Resource
2 NOVEMBER 2023 APPENDIX A: 2023 MINERAL RESOURCE Grades Contained Metals Copper Equivalent Zinc Equivalent Tonnes Cu Pb Zn Au Ag Cu Pb Zn Au Ag CuEq CuEq ZnEq ZnEq Zone Category (kt) (%) (%) (%) (g / t) (g / t) (M lbs) (M lbs) (M lbs) (M oz) (M oz) (M lbs) (%) (M lbs) (%) Measured 1,641 1.05% 0.73%
Canadian Copper — Investor Presentation (November 2023) on 6ix