Grange Resources Limited · ASX:GRR
Grange Resources — Investor Presentation (February 2005)
51 slides from Grange Resources's investor presentation, Feb 10, 2005
Slide 1: Grange Resources Limited
GRANGE RESOURCES LIMITED
Slide 2: Corporate Profile
Slide 3: Share Capital at 3rd February 2005
Slide 4: Financial Information
Slide 5: Major Shareholders at 31 December 2004
Slide 6: beperance
beperance a
Slide 7: Southdown Magnetite Deposit
mn ‘i ce iil i EE / al, ty { ae cmon Railway SOUTHDOWN MAGNETITE DEPOSIT
Slide 8: Southdown Magnetite Deposit
cil SOUTHOOWN MAGNETITE DEPOSIT [CD Grange Resources Mining Leases ee Rio Tinto Exploration Licence — :
Slide 9: ocal
ocal Freehold fand subject to. . aption to purchase agreement: ~ Cantreline of. magnetic anomaly 4 6864
Slide 10: Southdown Magnetite Project Summary
Slide 11: ee ‘i
ee ‘i ‘hh, ih ET ae 7 Se La oe oe : ee
Slide 12: (UB Guarz-magnatia ~modersta qredo-width - 84.” Grange Resources drole: pref S00 (200406)
(UB Guarz-magnatia ~modersta qredo-width - 84.” Grange Resources drole: pref S00 (200406) ~ ‘Quartz-magnetite - lower grade-width T .--Platined 2008 dail reverse cy Lea Fault See
Slide 13: Magnetite recovered from composite sample
% Magnetite recovered from composite sample 49.8
Slide 14: Southdown
ay SOUTHD
Slide 15: Open Pit Optimisation and Projection
Slide 16: Projection of additional mineralisation
ic ]. Mineralized zone PROJECTION 10 [HE ADD TIONAL 44 OF MINERA_ISAIION ON GRANGE S MINING LEASES (NDICAIES (HA) 400 7 OF MAGNEJIIE RESOURCE ISA SUITABLE [ARGET FOR [He NEX) SIAGE OF DRILLING PROGRAMME
Slide 17: Development Plan - Drilling
Slide 18: Development Plan
Slide 19: Proposed Concentrate Pipeline Route
SOUTHDOWN & DEPOSIT PROPOSED CONCENTRATE PIPELINE ROUTE
Slide 20: ‘i
‘i
Slide 21: Plant Layout
— - i: ls ae is . oe : i as i, fi d Oe Re oes Z ee : Coe : Lo ee eas IEE IOS UE EEA a ue ae PLANT LAYOU
Slide 22: ile Ho oe intone mi o a
ile Ho oe intone mi o a ae J A ‘crue ll Ae AE ve ee i i ~~ ae oe i as ek Cal Ie = i Re ;
Slide 23: Cost Estimates
Slide 24: Cost Estimates
Slide 25: Project Summary
Slide 26: Project Summary
Slide 27: Project Timetable
Slide 28: 20°00 Gainozoic « basalts and alluviels
20°00 Gainozoic « basalts and alluviels Devonian - Ordovician - granitoids Cambrian - Ordevioian Seventy Mile Range Gp « rhyolites,andesites sediments, ° [EE] Precambrian «metamorphies CHARTERS a, os TOWERS @ "Massive sulphide deposit a @& -Malor Mine © Prospect. matt wanssior GED. BRISBANE REWARD D
Slide 29: a oa
a oa
Slide 30: P80 of Completa
P80 of Completa om ale pyke . . 1900 AL ‘Oxide Gale PATA OORT OMA ao , “REWARD. REWARD. 6 UPERGENE F TAS DOES. Tu
Slide 31: Highway Seuth
Oe a Highway Seuth _ a Chimney ince Reward Deeps Lower Reward Deeps HW1 Lower Reward Deeps HWw2
Slide 32: Mt Windsor Joint Venture Summary
Slide 33: “CARNARVON
Source: Department Of Minerals And Eneray “CARNARVON BASIN \ © ee ATERSON {, OROGEN (5 ne . BANGeMALL so BABE ; Musgrave 4 Complex. “FRASER OROGEN.
Slide 34: Plutonic
ie _ Plutonic geo) SPCRPION Bore § Love T eect id mie ‘Bi Wag wag S To Marymia Mine A 6km AREA SUBJECT TO SLIDING SCALE e ROVALTY. - PLUTONIC EAST
Slide 35: Freshwater Gold Project Summary
Slide 36: 3,623,443 1.95 2,605,891 240,068 10.385
3,623,443 1.95 2,605,891 240,068 10.385
Slide 37: 179,231 6.30 583,931 36,311 16.08
179,231 6.30 583,931 36,311 16.08
Slide 38: i Grade | Contained |
i Grade | Contained | Location Category Tonnes Au git | Ounces |
Slide 39: . Grade | Contained
. Grade | Contained Location Category Tonnes Au git 53 621,000 TOTAL OPEN PIT | 455,000 4,101,000 655,400
Slide 40: Red Hill
RED HILL. M27/57 4 : Ba MT CHARLOTTE SUPER PIT.
Slide 41: Red Hill Project Summary
Slide 42: TAA
TAA A ect to royalty ect to royalty bj ro 3.5 a0 33 iad aw NN omms) 7) B=) a6 9 ° + 3 Hi 305
Slide 43: Wembley Gold Project Summary
Slide 44: Historical Dri Collar
Historical Dri Collar Gieneagle Dril Collar ee oS a a ee Mireralised Envelope y — [Projected to Surtace} | Downhole width and grace igtAu) QURCTO 25me3.ragtAU: URC Jam@SOigithy Tee
Slide 45: Abercromby Well Project Summary
Slide 46: Abercromby Well Project Assays
‘MMI - 235 00OmE 240-000mE ASSAYS RECEIVED FROM HOLES AT CAPITAL O1CJVD003 80-104m 24,.0m@11 26g/t Au HICIVOOOS 107-134.5m 275m@ 2.76gh Au BECJVPOT] S6-104m 18.0m@ 2.4tg/t Au OSWIVPO74 79-O1m 120m@ 3.2agtAu QGWJVPOT4 95-107m 12.0m@ 3.94g/t Au ABERCROMBY WELL PROJECT ASSAYS RECEIVED FROM HOLES AT BUN
Slide 47: a Lie Y cane — a
a Lie Y cane — a 119°30" agsag? HORSESHOE LIGHTS MINE [-/. oes Marymi: Gold Mine
Slide 48: | Contained
| Contained Copper (t) Location TOTAL RESOURCES 6,584,000 0.84
Slide 49: Mount Samuel Project Summary
Slide 50: TCS i ARGO MINE
TCS i ARGO MINE 80,700t @ 18g/t Au 224,700t @ 13.5g9/t Au (46,70002 Gold) | (100,0000z2 Gold) PEKO MINE 3,700,000t @ 3.5g/ Au (460,0000z Gold) ELDORADO MINE : : 146,000 @ 23.2g/ Au JUNO MINE (100,0000z Gold | 465,000t @ S7g/t Au >} . (810,0000z Gold) NOBLES NOB MINE ,992,000t © 17.29/t Au (1,100,000
Slide 51: 2.67 g/t Au
oe 4m @ 2.67 g/t Au 12m @ 7.65q/t Au @ S.129/f Au 17m @_ 108.24g/t Au | @ | 2.68g/t Au
Grange Resources — Investor Presentation (February 2005) on 6ix