Energy Metals Ltd · ASX:EME

Energy Metals — Conference Presentation (July 2011)

34 slides from Energy Metals's conference presentation, Jul 20, 2011

  1. Slide 1: Paul Dunbar, Exploration Manager

    For personal use only Paul Dunbar Exploration Manager

  2. Slide 2: Disclaimer

    DISCLAIMER For personal use only This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this presentation has been derived from third parti

  3. Slide 3: Current Share Price and Uranium Spot Price

    For personal use only Current Share Price $0.40 Current Uranium Spot Price $53.50

  4. Slide 4: Mainland China Nuclear

    Mainland China Nuclear (As at 31 Dec 2010) aes |3 Operational power t eactors (10.8GWe) 28 Under construction... Golmud’ CV sper gy Metal Scimited

  5. Slide 5: CGNPC

    For personal use only CGNPC (China Guangdong Nuclear Power Holding Co. Ltd) • Clean energy group (established 1994) • Total assets US$34.7B, US$34 7B Net Assets US$9 US$9.7B 7B (May (M 2011) • 5 operating nuclear power plants close to HK • 16 power plants under construction • One of only 2 Chinese c

  6. Slide 6: Capital Structure

    C it l Structure Capital St t For personal use only (current) Shares on Issue 153.8m Sh h ld Shareholders ≈1,020 1 020 Cash (31 M March h 2011) $ 29.4m 29 4m CGNPC 93.1m shares 60.6% KangDe 19.5m shares 12.7% Jindalee 14.0m shares 9.1%

  7. Slide 7: Highly Experienced Board

    Highly Experienced Board For personal use only Mr Zuyuan He (Chairman) CGNPC Dr Weidong Xiang (Managing Director) CGNPC Mr Bin Cui (Finance Director) CGNPC Ms Zheng Xiaowei (Non Exec) CGNPC Mr Zhong Yu (Non (N Exec) E ) KangDe Mr Lindsay Dudfield (Non Exec) Mr Geoff Jones (Non Exec) Xuekun Li (Compa

  8. Slide 8: EME Management Track Record

    Limited EME Management Track Record Oi wee Experienced, motivated team that escalated EME’s JORC compliant uranium resources to 45.4 million Ibs in 6 years 45Mibs 38.4Mlbs _ (Mibs U3Oa) 17,3MIbs 14.3MIbs 11.6MIbs EME Listing Sep 05

  9. Slide 9: Uranium Trading

    For personal use only U i Uranium T di Trading

  10. Slide 10: Uranium Trading

    U Uranium i Trading T di For personal use only • Unique Uranium Export Permit Granted • Permit to Possess Granted • Purchase and Sales Contracts being Negotiated

  11. Slide 11: Uranium project locations in Australia

    Uranium Jabiluka b Darwin, : logan ger Kk “PS worTHERN nei ° Testmorcand eValhalla r kittie | ¥ eangela yf of WESTERN AUSTRALIA a QUEENSLAND y | Lake Mason Yeelirrie SOUTH AUSTRALIA hy q ny | . . Mopoke Well) FourMile forane . <a Sp po tel Bee fait Sad om? Mulga Rock Olymple Dame %+Beverley Honeymoo

  12. Slide 12: Bigrlyi, Ngalia & Macallan Projects

    Bigrlyi, Ngalia & Macallan Projects | Macallan Project Sl £27333 0 100Km | Ngalia Project / SqYuendumu Fi BN : £27169 £24462 Devonian Carboniferous Lake Levit’ Undifferentiated Proterozoic [__] Granted tenement [_] Tenement application @ EME uranium prospect © Uranium prospect (excised) == Prospecti

  13. Slide 13: Bigrlyi Project Mineralised Horizon and Anomalies

    Bigrlyi Project Mineralised Horizon and Anomalies | | | 705 000mE 710 000mE 715 000mE Airstrip Nicker Beds ae Ti a ee N Quartzite — = Southwark Granite 10 meen, (i > ; ~ ~— Bigrlyi JV (EME 53.3%) Ka a wat grlyi J = : ~~ mA LL — — 3 —_ | = ; —— ee — \ A2 Al5 oe *~ Mineralised Horizon @ Uranium Prospe

  14. Slide 14: For personal use only

    For personal use only Photo from Google

  15. Slide 15: Bigrlyi Project Resources

    —— Bigrlyi Project Resources — ———

  16. Slide 16: Bigrlyi June 2011 Resource

    Bigrlyi June 2011 Resource* (250ppm cut off) For personal use only JORC Mt U3O8 U3O8 U3O8 V2O5 V2O5 V2O5 status ppm t Mlb ppm t Mlb Ind. 8.8 890 7,800 17.3 1,026 9,000 19.9 Inf. f 6 6.2 715 4,400 9.7 805 5,000 10.9 TOTAL 15 818 12,200 , 27 935 14,000 , 30.8 •Multiple Indicator Kriging; tonnes are me

  17. Slide 17: Bigrlyi PFS Summary

    Bigrlyi PFS Summary Summary* For personal use only • Excellent metallurgy (>95% recovery) • Excellent geotechnical ground conditions • Capex p Plant and infrastructure f $$181M • Capex Mining $89M • Total Opex $160/t • Positive Cash Flow > $120M • 8 year mine life • Resource increase essential to im

  18. Slide 18: Bigrlyi Drilling

    Bigrlyi Drilling For personal use only Bigrlyi Camp Oct06 019.jpg

  19. Slide 19: Bigrlyi, Ngalia & Macallan Projects

    Bigrlyi, Ngalia & Macallan Projects s N 3 . Cs Sl £27333 0 100Km £24807 a, = ESS NX a £24463 _ ee £27169 ~ E262 N Sy Devonian Carboniferous Undifferentiated Proterozoic [__] Granted tenement [_] Tenement application ; 3 @ EME uranium prospect eS wo © Uranium prospect (excised) S == Prospective strat

  20. Slide 20: For personal use only

    For personal use only Photo from Google

  21. Slide 21: For personal use only

    For personal use only Photo from Google

  22. Slide 22: Anomaly 15E Bigrlyi Project

    Anomaly I 5E Bigrlyi Project 715000mE 717000mE 719000mE Bigrlyi JV EME 53.7% EL24453 EME 100% y ; yeu B11012 6m @ 1,940ppm eU308 From 60.5m B11016 5m @ 309ppm eU308 From 30.0m XN Pe EL24453 EME 100% (| Thin Cover | : (1 Mt Eclipse Sandst | f . — ‘one Recent Drilling Max. Intercept N A © 100-1000ppm

  23. Slide 23: Anomaly East Drilling

    For personal use only Anomaly 15 East Drilling

  24. Slide 24: Anomaly East Section

    Anomaly 15 East Section For personal use only

  25. Slide 25: Camel Flat Prospect

    For personal use only Camel Flat Prospect p Discovery Hole CFD1001

  26. Slide 26: Camel Flat - CFD1001 (July 2010)

    Camel Flat - CFD1001 (July 2010) For personal use only 27m @ 0.27% U3O8 from 93.0m 94m (incl 3.5m (incl. 3 5m @ 1.82% 1 82% U3O8 from 93 93.5m) 5m) Note – True thickness estimated at 3 – 5m

  27. Slide 27: Camel Flat Drilling

    Camel Flat Drilling Drilling Sand Cover Mount Eclipse Sandstone Vaughan Springs Quartzite Granite Prospective Unit Interpreted Fault Historical Drill Collar (mostly ineffective) Hole Abandoned/Failed ° / iL Max eU30s intercept in drill hole (ppm Gi eperay 2010 Drilling > 1000 @ 500 - 1000 100-500 e@

  28. Slide 28: Bigrlyi, Ngalia & Macallan Projects

    Bigrlyi, Ngalia & Macallan Projects £27333 \ N a e (S . a | Macallan Project 0 100Km | Ngalia Project Yuendumu mes = / £27169 £24462 Devonian Carboniferous £24463 m Undifferentiated Proterozoic [__] Granted tenement [_] Tenement application @ EME uranium prospect @ Uranium prospect (excised) == Pros

  29. Slide 29: Macallan Radiometrics

    Macallan nr Radiometrics G) «nergy Metal Siimited 10k 600000mE - 630000mE

  30. Slide 30: For personal use only

    "A “7 a Ss lool To) 20 , ; LN Nt me Ne Nee Ne el Nee Ne es SA ; A g “@ Ranger q BF NortHERN TERRITORN , Manyingee Be. a ¥ } QUEENSLAND y Lake Mason YY _ } Lakeside } Mopoke Well | VR, ny fossa r anketell 4 Olympic Dam ‘Beverley — q retha 1 d | NEW SOUTH WALES | ; cofpmrcetsice am) NW? P| victoria UP

  31. Slide 31: Rawlinson – WA Radiometrics

    Rawlinson – WA Radiometrics For personal use only

  32. Slide 32: Watch out for

    W t h outt ffor: Watch For personal use only Commencement off Uranium Trading g Drilling Results inc Anomanly A l 15 E East, t CCamell Fl Flatt Bigrlyi Extensional Drilling Access to Greenfields Projects 2011 ? Increasing Chinese investor interest

  33. Slide 33: For personal use only

    For personal use only

  34. Slide 34: Compliance Statement

    For personal use only Compliance Statement The information in this presentation is based on information compiled by Mr Paul Dunbar and Mr Lindsay Dudfield, who are both Members of The Australasian Institute of Mining and Metallurgy and The Australian Institute of Geoscientists. Mr Dunbar is a full t

Energy Metals — Conference Presentation (July 2011) on 6ix