Gek Terna — Investor Presentation (October 2021)

62 slides from Gek Terna's investor presentation, October 2021

  1. Slide 1: Corporate Presentation October 2021

    Slide 1: Corporate Presentation October 2021

    Corporate Presentation October 2021

  2. Slide 2: Group Structure

    Slide 2: Group Structure

    GEK TERNA GROUP OF COMPANIES ee a | wll Dia

  3. Slide 3: Table of Contents

    Slide 3: Table of Contents

    Table of Contents Section 1. Group Overview Page 4 Section 2. 1H2021 Results Review Page 16 Section 3. Divisions Overview Page 21 Section 4. Key Takeaways Page 46 Section 5. Corporate & Social Responsibility Page 48 Section 6. Macro Backdrop Page 51 Appendix I. Financial Data Page 56 Appendix II. Sh

  4. Slide 4: Group Overview

    Slide 4: Group Overview

    Group Overview

  5. Slide 5: GEK TERNA Group at a Glance

    Slide 5: GEK TERNA Group at a Glance

    GEK TERNA Group at a Glance Business Overview H1 2021 Results1  GEK TERNA Group (“GEK TERNA” or the “Group”) is one of the leading industrial groups in Greece with operations also in Central and Southeastern €439m €136m 31.0% Europe Revenue Adj. EBITDA(2) Adj. EBITDA(2) Margin  Grou Structure The

  6. Slide 6: GEK TERNA History – Corporate Milestones

    Slide 6: GEK TERNA History – Corporate Milestones

    GEK TERNA History – Corporate Milestones 1999 1994 1969 1997  Terna and GEK join 1972  Listing of Terna and GEK  GEK is  Incorporation of Terna forces, forming one of  Terna is established on the Athens Stock established Energy the largest Group in Exchange Greece 2007 2000  Terna Energy IPO 

  7. Slide 7: Group Structure - Activities

    Slide 7: Group Structure - Activities

    Group Structure - Activities GEK TERNA Other Construction RES Concessions Segments & PFIs 100% 37% 100% Motorways Thermal Operation & Concessions Energy Maintenance 100% 100% 100% Real Estate I Assets2 100% 100% 75% GEK TERNA Concessions & PFIs rationale: • Improve operating performance II • Increas

  8. Slide 8: Key Investment Highlights

    Slide 8: Key Investment Highlights

    Key Investment Highlights A leader in its core markets with great positioning in upcoming infrastructure and energy transition developments, generating recurrent cash flows with very long-term visibility Leading industrial company with top positions in construction, concession, energy production and

  9. Slide 9: FCF Contribution per Segment & Key Projects

    Slide 9: FCF Contribution per Segment & Key Projects

    FCF Contribution per Segment & Key Projects Highly visible FCF streams from concessions and energy Annual FCF Available to GEK TERNA Shareholders by Division, post servicing of Project Finance / Non-Recourse loans Operational Pipeline €4m - €6m > €300m €25m - €35m €35m - €45m €115m - €145m Expected

  10. Slide 10: Capital Allocation

    Slide 10: Capital Allocation

    Capital Allocation Target Capital Allocation of FCF to GEK TERNA > €300m 35%-45% . . 8%-12% Gross Corporate Debt New Investments Coverage at c.2.0-2.5x Corporate Residual . Leverage Shareholder  Growth with capital Remuneration deployment directed towards expansionary capex for high return  Curren

  11. Slide 11: Optimal Balance Sheet Structure

    Slide 11: Optimal Balance Sheet Structure

    Optimal Balance Sheet Structure GEK TERNA Group funding strategy is based on autonomous funding by business unit Debt Breakdown by Segment H1 2021 5%  Most of the debt sits at Energy from Renewables and Concessions, the Energy business units with the highest debt capacity 27% 36% Concessions Total

  12. Slide 12: Investment plan

    Slide 12: Investment plan

    Investment plan Upcoming equity commitment1 well supported by existing liquidity Upcoming Equity Commitments Available Liquidity Upcoming Equity Commitments for the projects of :  Available cash at hand (ex-RES division) • Heron I & II acquisition of €751m as of 1H21 • Kasteli Airport • Hellinikon

  13. Slide 13: Group Vision & Strategy

    Slide 13: Group Vision & Strategy

    Group Vision & Strategy Key strategy pillars are focused on sustainable growth, cash generation, synergies across segments, business resilience and high reputational standards Grow concessions portfolio through participation in tenders and leveraging More than double renewable Solidify leading posit

  14. Slide 14: Strategic Initiatives & Implementation by Business

    Slide 14: Strategic Initiatives & Implementation by Business

    Strategic Initiatives & Implementation by Business  Focus on new landmark contract wins such as signing of new public projects (c.€450m motorway North extension), Construction the Hellinikon casino (c.€800m contract) and Kastelli airport (c.€500m contract)  Aim to seize the upside in construction

  15. Slide 15: Sustainability as Key Focus of the Group’s Operations

    Slide 15: Sustainability as Key Focus of the Group’s Operations

    Sustainability as Key Focus of the Group’s Operations Sustainable Promoting Human Strengthening the Shaping a Responsible Environmental Protection Development Values Group’s Social Footprint Market • Stakeholders engagement • Integral part of strategy • Ensuring health and • Ongoing engagement with

  16. Slide 16: 1H2021 Results Review

    Slide 16: 1H2021 Results Review

    — — 1 \\E Si " \, \ \Y \ ‘ \ \ ‘ai 3 rel | N WOH i . WAVES ‘} ¥ aa) out Vana Yona ans) SEE

  17. Slide 17: 1H2021 Highlights

    Slide 17: 1H2021 Highlights

    1H2021 Highlights  Increase of turnover and operating profitability (adjusted EBITDA) from continuing operations  The Group also recorded a significant expansion of its construction backlog, which along with the projects to be signed amounts to €4.5bn (signed and pending to be signed)  Τotal inve

  18. Slide 18: Developments during the period by activity

    Slide 18: Developments during the period by activity

    Developments during the period by activity Activity Revenue €m(1) Comments  Turnover amounted to €69.9m compared to €67.2m in the corresponding period of 2020  Operating profitability (adjusted EBITDA) amounted to €46.2m compared to €49.9m in H1 67 the corresponding period of 2020 2020  The GEK T

  19. Slide 19: Consolidated Adj. EBITDA evolution

    Slide 19: Consolidated Adj. EBITDA evolution

    Consolidated Adj. EBITDA1 evolution Adj EBITDA1 grew by 18.7% vs H1 2021 with main contribution coming rebounding construction 21 1 136 4 (4) (1) 115  Improved sales mix and margin enhancement initiatives H1 2020 EBITDA Construction Concession Energy RES Thermal Energy Other H1 2021 EBITDA 1. Adjus

  20. Slide 20: Optimal Balance Sheet Structure - Group

    Slide 20: Optimal Balance Sheet Structure - Group

    Optimal Balance Sheet Structure - Group Group Net Debt Bridge (€m) 1.317 1.226 94 41 (136) (86) Net Debt FY2020 Cash from Operations Changes in WC Capex Other Adjustments Net Debt H1-21 (before WC) Group Net Leverage Evolution Group Cost of Debt Evolution 5,0x 5,4% (1) 3,94%(1) 3,7x 4,4% 2.97% (excl

  21. Slide 21: Divisions Overview

    Slide 21: Divisions Overview

    Divisions Overview 21

  22. Slide 22: Concessions Segment

    Slide 22: Concessions Segment

    Concessions Segment 22

  23. Slide 23: Concessions overview

    Slide 23: Concessions overview

    Concessions overview Kentriki Odos Concessions(2) 2019 2020 1H20 1H21 Parking  Total length: 231km Revenue 187.1 151.3 67.2 69.8  Parking stations all over Greece  Equity invested €67m (100%) Growth % (5.0%) (19.2%) (18.8%) 3.9%  2,235 total spaces  Senior bank debt (non recourse): Adj. EBITDA(

  24. Slide 24: GEK Terna Group Concession Portfolio

    Slide 24: GEK Terna Group Concession Portfolio

    GEK Terna Group Concession Portfolio The Group is ready to invest on the awarded projects c.596m of equity with an average remaining life of c.35 years Equity to be deployed Project % Stake Commercial Operation Concession Expiration (€m) (2) Peloponnese waste management1 100% 16 2023 2047 Kastelli a

  25. Slide 25: Ionia Odos & Kentriki Odos at a Glance

    Slide 25: Ionia Odos & Kentriki Odos at a Glance

    Ionia Odos & Kentriki Odos at a Glance Overview Main Concession Highlights Key metrics (2020A)  “Ionia Odos” Concession Project  Concession Grant: 2007  Concession End: 2037 Nea Odos  Total Length: 380kmm AADT: 35,493  17 Toll Stations: 9 on Ionia Odos and 8 on PATHE E-65  Project Budget: over

  26. Slide 26: Egnatia Odos at a Glance

    Slide 26: Egnatia Odos at a Glance

    Egnatia Odos at a Glance Overview Main Concession Highlights  Concession Period: 35 years Key metrics (2027E)  Toll Stations: 18 frontal stations and 43 lateral toll stations Transactions: 217.6m `  Project Budget: over €2.7bn (acquisition cost € 1.5bn, € 0.7bn construction cost, financials etc.)

  27. Slide 27: Kastelli Airport at a Glance

    Slide 27: Kastelli Airport at a Glance

    Kastelli Airport at a Glance Overview Main Concession Highlights  More than 90% correlation between Heraklion Key metrics airport traffic and major (G7) advanced economies.  It is one the most significant investments that have Pax (2019A): 8m taken place in the island of Crete and one of the count

  28. Slide 28: Hellinikon IRC at a Glance

    Slide 28: Hellinikon IRC at a Glance

    Hellinikon IRC at a Glance Overview Main Concession Highlights  Asset: Integrated Casino Resort (“IRC”) operating license for a  Site: The site is unique, located in the south coast line of the concession period of 30 years. greater Athens area within the overall Hellinikon Project (largest waterf

  29. Slide 29: Construction Segment

    Slide 29: Construction Segment

    Ld LL Mi ~~ (Constructi Segment Bt ieBEES = (agi: ge “Se idk 2#

  30. Slide 30: Construction

    Slide 30: Construction

    Construction Significant increase in construction backlog to €4.5bn through new contract wins Construction Outlook Projects completed & under construction Casino resort Limassol Nikola Tesla Airport  Backlog increased to an all-time high of 4.5bn following signing of new contracts: Hellinikon Casin

  31. Slide 31: Construction Highlights

    Slide 31: Construction Highlights

    Construction Highlights Infrastructure Buildings Industrial Energy Ionia Odos Agia Nappa Marina Shell Tank Farm HERON II Power Plant  Construction and delivery of Klokova  Construction of two towers (115m high);  Construction of ten product tanks with a  Combined Cycle Power Plant with a tunnel

  32. Slide 32: Greek Construction Sector – Recently Completed Projects

    Slide 32: Greek Construction Sector – Recently Completed Projects

    Greek Construction Sector – Recently Completed Projects The infrastructure budget for the pipeline stands at c.€43.4bn, c.4x higher than the budget for completed projects during the 2014-2019 period Infrastructure Budget of Completed and Pipeline Projects (€bn) 43,4 Tourist Product Upgrading Energy

  33. Slide 33: Greek Construction Sector – Pipeline

    Slide 33: Greek Construction Sector – Pipeline

    Greek Construction Sector – Pipeline Upcoming pipeline with a total budget of c.€50bn, in a sector where the Group has a leading position Projects per Phase Total Budget Number of Projects € 13,2bn (26%) 37 31% Phase A: Projects that are in the process of 52 planning, designing and maturing 44% Phas

  34. Slide 34: Constructions – Historical Performance

    Slide 34: Constructions – Historical Performance

    Constructions – Historical Performance Consistently positive operational profitability even during financial crisis, at a sector with strong correlation with GDP Revenue Evolution1 (€bn) 1,8 13% 1,6 11% 6% 9% Average EBIT 2% 1,4 2% 0% margin 4.1% 1,2 4% 1% 0% 1,0 1,0 1% nm 1 1,0 0,8 0,8 0,8 0,7 0,7

  35. Slide 35: Backlog overview

    Slide 35: Backlog overview

    Backlog1,2,3 overview Backlog Breakdown by Geography  Largest project: Design and Construction of new international airport in 7% Heraklion, Crete (€475m) Greece  Other projects include the construction of motorways, office buildings and power projects for clients such as the Ministry of Public Wo

  36. Slide 36: Renewable Energy

    Slide 36: Renewable Energy

    Renewable Energy 36

  37. Slide 37: Energy Production – Renewable Energy (Terna Energy)

    Slide 37: Energy Production – Renewable Energy (Terna Energy)

    Energy Production – Renewable Energy (Terna Energy) Largest renewable energy platform in Greece with substantial operations abroad Overview Installed capacity split by country2  Terna Energy is the largest renewables energy group in Greece (763 MW) with significant activities in Poland (102 MW) and

  38. Slide 38: Installed Capacity Evolution

    Slide 38: Installed Capacity Evolution

    Installed Capacity Evolution Total installed capacity is projected to reach 3GW by 2026 Installed capacity evolution (GW) To begin construction 3.0 1,1 Under construction / Ready to build 0.6 1,4 1,4 0,1 1,3 0,3 1,0 1,0 (1) 0,9 0,7 0,6 0,7 1. Decrease due to deconsolidation of US assets 38

  39. Slide 39: Overview of current portfolio and future pipeline

    Slide 39: Overview of current portfolio and future pipeline

    Overview of current portfolio and future pipeline Organic growth and value creation with a focused strategy and attractive pipeline Terna Energy EBITDA (€m) Terna Energy Capital Expenditure (€m) Installed cap. (MW) 640 664 738 986 1,032 1,390 1,373 860 895 229 205 195 182 168 146 148 116 109 99 86 8

  40. Slide 40: Leverage – Terna Energy

    Slide 40: Leverage – Terna Energy

    Leverage – Terna Energy Significant headroom for additional investments Gross Financial Debt (€m) Cash (€m) 954 374 810 341 2020 H1 2021 2020 H1 2021 Net Leverage Net Cashflow from Operations (€m) 93 89 4,6x 3,2x 2020 H1 2021* H1 2020 H1 2021 * Annualised EBITDA. Cash includes restricted deposits 40

  41. Slide 41: Thermal Energy Segment

    Slide 41: Thermal Energy Segment

    Thermal Energy Segment 41

  42. Slide 42: Thermal Energy Segment – Overview

    Slide 42: Thermal Energy Segment – Overview

    Thermal Energy Segment – Overview GEK TERNA Group is engaged in thermal energy production and electricity distribution through Heron I, Heron II and Heron Supply, as well as the Komotini CCGT, which is currently under construction Overview of Assets Overview of Income Statement1 Project Status MW Ty

  43. Slide 43: Thermal Energy Segment – Komotini CCGT at a Glance

    Slide 43: Thermal Energy Segment – Komotini CCGT at a Glance

    Thermal Energy Segment – Komotini CCGT at a Glance Overview Investment Highlights  Description: Construction and operation of a new highly efficient  Market Dynamics: Favorable for a new investment in the energy space as: Combined Cycle Power Plant with a total capacity of 880MW and  PPC has deci

  44. Slide 44: Real Estate & Mining

    Slide 44: Real Estate & Mining

    Real Estate & Mining 44

  45. Slide 45: Real Estate & Mining

    Slide 45: Real Estate & Mining

    Real Estate & Mining Real Estate Overview Real Estate P&L1  GEK TERNA is engaged in Real Estate P&L 2019 2020 H1 - 20 H1 - 21 development - the company holds a differentiated Revenue 5.2 4.2 2.0 2.6 portfolio in Greece and abroad  Offices Growth % (47.0%) (19.6%) 7.9% 30.6%  Commercial properties

  46. Slide 46: Key Takeaways

    Slide 46: Key Takeaways

    a. Vi Oey y Ya) aun, Sunn Sane oi

  47. Slide 47: Key Takeaways

    Slide 47: Key Takeaways

    Key Takeaways  Uniquely positioned to benefit from positive macro backdrop along with sustainability and energy transition mega trends  Highly visible and sustainable cash flow available to shareholders from operating assets  Significant growth expected over the coming years as more assets reach

  48. Slide 48: Corporate & Social Responsibility

    Slide 48: Corporate & Social Responsibility

    Corporate & Social Responsibility 48

  49. Slide 49: Corporate and Social Responsibility

    Slide 49: Corporate and Social Responsibility

    Corporate and Social Responsibility The Group’s vision is to continue to be one of the most prominent Greek companies, while contributing to sustainable development and value creation for its employees and stakeholders Environmental protection is an integral part of the Group's strategy and is expre

  50. Slide 50: Remuneration Policy – Framework of Principles

    Slide 50: Remuneration Policy – Framework of Principles

    Remuneration Policy – Framework of Principles Compliance Serves for the appropriate and efficient risk management and prevents conflict of interest situations Transparency Presents with clarity the structure of every kind of remuneration that is regulated by the present policy Interests of the Compa

  51. Slide 51: Macro Backdrop

    Slide 51: Macro Backdrop

    Macro Backdrop 51

  52. Slide 52: Favorable Macro Conditions

    Slide 52: Favorable Macro Conditions

    Favorable Macro Conditions  After years of contraction in GDP Evolution the Greek economy, a strong recovery is expected to take Q2 2021 10,0% +16.2% place Y-O-Y (1) 6,1% (1)  Q2 2021 GDP increased by 5,0% 4,5% 16.2% on a y-oy basis and 2,4% 1,3% 1,6% 1,9% 1,5% 1,5% 1,4% 3.4% on a q-o-q basis 0,7%

  53. Slide 53: Evident Need for Significant Investments

    Slide 53: Evident Need for Significant Investments

    Evident Need for Significant Investments  Domestic Gross Fixed Capital Gross Fixed Capital Formation (Other Buildings and Structures) (€bn) Formation, currently standing ay €4.9bn, has decreased 59% decrease substantially over the years 11,5 11,0 10,0  Greece is lagging its 7,0 7,1 7,4 7,7 7,4 6,8

  54. Slide 54: Favorable RES Market with Growth Potential

    Slide 54: Favorable RES Market with Growth Potential

    Favorable RES Market with Growth Potential  RES’ contribution in gross RES’ % Contribution in total Gross Electricity Production electricity production is expected to reach 66% by 2030 in Greece  The targets set out in the Hellenic 57% 66% Republic’s National Energy and 51% 42% Climate Plan sugges

  55. Slide 55: Recovery and Resilience Fund

    Slide 55: Recovery and Resilience Fund

    Recovery and Resilience Fund Greece has received the highest allocation of grants in the EU in respect of % of its GDP and is expected to experience catalyst growth and economic transformation RRF Grants & Loans available to Greece (€bn) Payments Horizon 5,5 5,5 5,5 5,5 4,4 3,1 3,1 3,1 3,1 2,9 1,5 1

  56. Slide 56: Appendix I – Financial Data

    Slide 56: Appendix I – Financial Data

    Appendix I – Financial Data 56

  57. Slide 57: Group Balance Sheet

    Slide 57: Group Balance Sheet

    Group Balance Sheet Figures in € (000') Group 1H2021 1H2020 FY2020 FY2019 Assets Total non‐current assets 2,272,043 3,091,089 2,836,302 3,013,538 Total current assets 1,731,622 1,245,105 1,799,420 1,295,731 Total Assets 4,003,665 4,336,194 4,635,722 4,309,269 Equity & Liabilities Shareholders’ equit

  58. Slide 58: Group P&L

    Slide 58: Group P&L

    Group P&L Figures in € (000') Group 1H2021 1H2020 FY2020 FY2019 Continuing operations Turnover 439,376 419,907 971,305 1,155,739 Cost of sales (343,630) (334,727) (756,476) (919,263) Gross profit 95,746 85,180 214,829 236,476 Administrative and distribution expenses (40,644) (34,956) (79,489) (75,65

  59. Slide 59: Group Cash Flow

    Slide 59: Group Cash Flow

    Group Cash Flow Figures in € (000') Group 1H2021 1H2020 FY2020 FY2019 Cash Flows From Operating Activities Earnings before tax 12,213 21,379 71,429 77,817 Depreciation 51,695 47,414 128,414 122,822 Fixed assets grants amortization (2,864) (2,778) (7,034) (8,194) Provisions 13,713 6,716 18,825 1,073

  60. Slide 60: Appendix II – Share Price Performance

    Slide 60: Appendix II – Share Price Performance

    Appendix II – Share Price Performance 60

  61. Slide 61: Share Price Performance

    Slide 61: Share Price Performance

    Share Price Performance 3-Year Share Price Performance Return (%) 240% 190% 140% 90% 40% GEK TERNA Holdings, Real Estate, Construction S.A. ATHEX Composite Shareholder Structure1 Key Share Price Data Share Price Data (€)1 Key Statistics FY-2020 12 month low 5.8 Market Cap.1 (€m) 851 Georgios Periste

  62. Slide 62: 85, Mesogeion Ave., Athens 26, Greece

    Slide 62: 85, Mesogeion Ave., Athens 26, Greece

    85, MESOGEION AVE., ATHENS 115 26, GREECE T. +30 210 6968000 —_-F. +30 210 6968098-99 Email: info@gekterna.com GEK TERNA GROUP OF COMPANIES www.gekterna.com