Silvercorp Metals Inc. · TSX:SVM
Silvercorp Metals — Investor Presentation (November 2026)
50 slides from Silvercorp Metals's investor presentation, November 2026

Slide 1: Investor Presentation
Investor Presentation Investor Investor Presentation Presentation Investor Presentation November 2026 silvercorpmetals.com | NYSE-A / TSX : SVM

Slide 2: Cautionary Statements
CAUTIONARY STATEMENTS TSX: SVM | NYSE AMERICAN SVM Cautionary Note Regarding Forward-Looking Information and Forward-Looking Statements Cautionary Note to U.S. Investors concerning estimates of Measured, Indicated and Inferred Resources This presentation includes “forward-looking statements” within

Slide 3: Profitable Silver Mines in China Support Growth and Diversification
PROFITABLE SILVER MINES IN CHINA SUPPORT GROWTH AND DIVERSIFICATION TSX: SVM | NYSE AMERICAN SVM PROVEN TRACK Proven Track RECORD Record Tulkubash & Kyzyltash Producing (~6 Moz Au) Under Construction Production since 2006: >110 Moz Silver + Under Permit 1.6 Blb Lead + Zinc KYRGYZSTAN Development Ind

Slide 4: Silvercorp Investment Highlights
SILVERCORP INVESTMENT HIGHLIGHTS TSX: SVM | NYSE AMERICAN SVM Profitable Silver Near-Term Significant Long- Compelling Silver Producer Production Growth Term Growth Leverage & Valuation Ying produced ~6 Moz El Domo and Tulkubash Robust project pipeline 76% of TTM revenue from AgEq at ~$13/oz AISC un

Slide 5: Significant Near-Term Revenue Growth from Copper and Gold
SIGNIFICANT NEAR-TERM REVENUE GROWTH FROM COPPER AND GOLD TSX: SVM | NYSE AMERICAN SVM Current Mines New Mines Next Mines Total Ying & GC1 El Domo1 Tulkubash1,2 Condor1 Kyzyltash1,2 $391M 7.8 Moz AgEq $753M 15.1 Moz AgEq $1,223M 24.5 Moz AgEq $1,432M 28.6 Moz AgEq $2,163M 43.3 Moz AgEq 1 Current min

Slide 6: Large Inventory Supporting Long-Term, Low-Cost Precious Metals Production
LARGE INVENTORY SUPPORTING LONG-TERM, LOW-COST PRECIOUS METALS PRODUCTION TSX: SVM | NYSE AMERICAN SVM Silver Equivalent1 (Silver + Gold), Moz 2P Reserve 128 61 190 M&I Resource 167 93 395 655 (not in 2P Reserve) Inferred Resource 92 236 142 471 China Ecuador Kyrgyzstan Plus Copper Equivalent2 (Copp

Slide 7: Profitable Mines in a Stable Jurisdiction
PROFITABLE MINES IN A STABLE JURISDICTION TSX: SVM | NYSE AMERICAN SVM China Advantages: • Access to customers Ying Mining District, Henan • Smelters pay up front, they pick up (no Province (SGX, HPG, HZG, TLP, LME, LMW and DCG mines) shipping costs), and more favourable commercial terms (TC/RCs & p

Slide 8: Ying District: Growing Through Drilling, Optimization, Expansion & Consolidation
YING DISTRICT: GROWING THROUGH DRILLING, OPTIMIZATION, EXPANSION & CONSOLIDATION TSX: SVM | NYSE AMERICAN SVM Overview • 7 mines feeding ores to 2 mills (4,000 tpd) • Ag-Pb & Zn concentrates sold to local smelters • >17 year reserve life benefited from extensive exploration drilling Implementing Pro

Slide 9: Ying District: No.3 Mill Construction
YING DISTRICT: NO.3 MILL CONSTRUCTION TSX: SVM | NYSE AMERICAN SVM Elevated Water Tank Conveyor Gallery No. 1 Crushed Ore Bin Main Gate Diesel Tank Crushing Plant Conveyor Galleries Nos. 2–4 Electrical Room Reagent Building ROM Ore Shed Grinding Plant Maintenance Workshop and Warehouse Lead Flotatio

Slide 10: Ying District
YING DISTRICT TSX: SVM | NYSE AMERICAN SVM 1800 TPD Flotation Line Added to Mill No. 2 TSF No. 3 Supports LOM Production and Beyond EV Haul Truck Fleet Kuanping Underground Development Underway 10

Slide 11: Ecuador: Emerging Mining Destination
ECUADOR: EMERGING MINING DESTINATION TSX: SVM | NYSE AMERICAN SVM Attracting Global Mining Capital & Capital Development Markets Recognition Construction Cascabel Production • SVM acquired Adventus Mining for (Cu-Au) Cities ~C$200M in 2024 to build El Domo and advance Condor La Plata El Domo (Cu-Au)

Slide 12: El Domo Copper-Gold Project: Under Construction
EL DOMO COPPER-GOLD PROJECT: UNDER CONSTRUCTION TSX: SVM | NYSE AMERICAN SVM Ecuador’s Next Mine • Total Capex estimate of $298M; $90.9M spent as of September 30, 2026 • Funded by cash on hand & $175M Wheaton stream payment ($88M drawn) 2026 Technical Report Highlights Mine Life (excluding 11.5 Year

Slide 13: El Domo Copper-Gold Project: Construction Progress
EL DOMO COPPER-GOLD PROJECT: CONSTRUCTION PROGRESS • Construction advances despite heavy rainfall caused by Super El Niño • Process plant civil works advancing, with structural steel shipped and major equipment arriving in Ecuador Road #1 • Open-pit stripping underway with CRCC 19 • TSF construction

Slide 14: El Domo Copper-Gold Project: Water Management
EL DOMO COPPER-GOLD PROJECT: WATER MANAGEMENT NE Non-Contact Water Channel Concrete Roadside Ditches 14

Slide 15: El Domo Copper-Gold Project: Processing Plant
EL DOMO COPPER-GOLD PROJECT: PROCESSING PLANT Primary Crusher Fine Ore Bin Grinding & Flotation Plant Thickener Assay Lab Warehouse Office Building Dewatering Plant CRCC19 Fuel Depot 15

Slide 16: El Domo Copper-Gold Project: Mill Equipment Arriving Ecuador
EL DOMO COPPER-GOLD PROJECT: MILL EQUIPMENT ARRIVING ECUADOR 16

Slide 17: El Domo Copper-Gold Project: Pit Stripping Underway
EL DOMO COPPER-GOLD PROJECT: PIT STRIPPING UNDERWAY El Domo Pit Stripping Underway Pit Area 60 Tonne Trucks 17

Slide 18: Condor Gold Project: Silvercorp's Second Mine in Ecuador
CONDOR GOLD PROJECT: SILVERCORP’S SECOND MINE IN ECUADOR TSX: SVM | NYSE AMERICAN SVM Project Overview 2025 PEA Highlights • Located in the productive Zamora Cu-Au belt Mine Life 13 Years • 2025 PEA based on Camp & Los Cuyes 113 koz Au Avg. Annual Payable deposits: Production 430 koz Ag (Years 1- 12

Slide 19: Condor Gold Project: Development Plans
CONDOR GOLD PROJECT: DEVELOPMENT PLANS TSX: SVM | NYSE AMERICAN SVM Next steps • Secure environmental permit for small-scale mining • Develop two 1,500 m tunnels through Camp and Los Cuyes to support underground drilling • Plan a 900 tpd mill, TSF, and associated infrastructures that can also treat

Slide 20: Kyrgyzstan: Multi-Million-Ounce Gold Projects
KYRGYZSTAN: MULTI-MILLION-OUNCE GOLD PROJECTS TSX: SVM | NYSE AMERICAN SVM Overview • Paid $92M to acquire Chaarat ZAAV CJSV (“ZAAV”), contains ~6 Moz gold resource • Converted ZAAV into a JVC (SVM 70% and operator; Kyrgyzaltyn 30% free-carried interest) • Paid $60M to the Kyrgyz Government followin

Slide 21: Kyrgyzstan: Phase 1 Development of Tulkubash
KYRGYZSTAN: PHASE 1 DEVELOPMENT OF TULKUBASH TSX: SVM | NYSE AMERICAN SVM Phase 1 Development of Tulkubash Tulkubash Operation • Budgeted $166.3M for construction ($42M in Type 4 Mtpa open pit / heap leach 2026) – informed by contractor quotes Mine Life ~3-4 Years • Scope: 2018 Tetra Tech BFS (JORC)

Slide 22: Kyrgyzstan: Heap Leach Pad & Processing Plant Area
KYRGYZSTAN: HEAP LEACH PAD & PROCESSING PLANT AREA TSX: SVM | NYSE AMERICAN SVM Attenuation pond South channel Topsoil dump Heap Leach Pad Area West channel East channel Access Road Rom pad PLS pond Overflow PLS pond Crusher Emergency pond Process plant 22

Slide 23: Kyrgyzstan: Pit & Waste Dump Areas
KYRGYZSTAN: PIT & WASTE DUMP AREAS TSX: SVM | NYSE AMERICAN SVM Mining stripping area Road widening Waste dump area 23 23

Slide 24: Kyrgyzstan: Construction Camp
KYRGYZSTAN: CONSTRUCTION CAMP TSX: SVM | NYSE AMERICAN SVM Winterized camp with 110 beds for employees and 290 beds for contractors 24

Slide 25: Kyrgyzstan: Phase 2 Development of Kyzyltash
KYRGYZSTAN: PHASE 2 DEVELOPMENT OF KYZYLTASH TSX: SVM | NYSE AMERICAN SVM Phase 2 Development of Kyzyltash • ~US$30M in spending over next two years – including ~100,000 m of drilling • Results reported for 29 drill holes in the Main Zone, including step out holes: • DH26M687: 212.5 m at 1.68 g/t •

Slide 26: Approach: Focus on Generating Free Cash Flow
APPROACH: FOCUS ON GENERATING FREE CASH FLOW TSX: SVM | NYSE AMERICAN SVM Maintained stable AISC per tonne cost over last 10 years Profit (Green Bar Below) on every tonne of ore mined Realized Silver Price (US$/oz) Per Tonne Value (US$) Calendar Year *Realized silver price is calculated using the Sh

Slide 27: History of Profitable Production + Growth
HISTORY OF PROFITABLE PRODUCTION + GROWTH TSX: SVM | NYSE AMERICAN SVM 2 10 Consolidated Production Silver Price1 AISC 4 Silver Equivalent (Ag+Au) 7.6 7.5 7.7 3 8 AgEq Ounces (M) 6.7 7.0 6.8 6.7 6.6 6.7 6.2 6.4 6.1 6 5.5 5.6 5.5 5.2 4.7 4.5 4.1 4.3 4 $15.95 $14.25 1.9 $11.33 $11.38$12.12 2 $10.20 $8

Slide 28: Strong Earnings and Cash Flow
STRONG EARNINGS AND CASH FLOW TSX: SVM | NYSE AMERICAN SVM Adjusted Net Income (US$M) Operating Cash Flow (US$M) Calendar Year Calendar Year Note: Adjusted net income = adjusted for one-time non-cash items, FX gain(loss), Note: Operating cash flow as reported in the financial statements includes inv

Slide 29: Higher Margins Than Our Peers
HIGHER MARGINS THAN OUR PEERS TSX: SVM | NYSE AMERICAN SVM EBITDA Margin Return on Equity Trailing 12 Months Trailing 12 Months 67% 21.0% Silvercorp Silvercorp VS. VS. 55% 13% 59% 17.4% Vanguard Peer Avg. GDX Peer Avg. Industrials ETF 100 40 66.5% 21.0% 80 30 60 20 40 10 20 0 0 -10 2010 2012 2014 20

Slide 30: Undervalued Relative to Peers
UNDERVALUED RELATIVE TO PEERS TSX: SVM | NYSE AMERICAN SVM EV / EBITDA P / Adj E P / OCF Trailing 12 Months Trailing 12 Months Trailing 12 Months 5.3x VS. 6.7x 9.9x VS. 14.3x 5.1x 9.4x Peer Median Peer Median Peer Median Silvercorp Silvercorp Silvercorp Fortuna 3.2x Fortuna 9.3x Fortuna 4.4x Silverc

Slide 31: Incubating World Class Opportunities
INCUBATING WORLD CLASS OPPORTUNITIES TSX: SVM | NYSE AMERICAN SVM Silver Sand Carangas (2024 PFS) (2026 PEA) 10.6 Moz Ag • 27.8% ownership; ~$1.1B market cap Annual Production 12 Moz Ag 62 koz Au • >732 Moz AgEq in the M&I category 59 kt Pb+Zn (indirect 203 Moz at 27.8%) Mine Life ~13 Years ~19 Year

Slide 32: Catalysts
CATALYSTS TSX: SVM | NYSE AMERICAN SVM 1 El Domo construction 2 Tulkubash construction / Kyzyltash exploration & PEA 3 Ying Mining District expansion 4 Condor permit and mine development 5 New Pacific –Silver Sand and Carangas permitting advancement 32

Slide 33: Ownership & Coverage
OWNERSHIP & COVERAGE TSX: SVM | NYSE AMERICAN SVM Top Investors % O/S Analyst Coverage 1 Helikon Investments 11.12 2 Van Eck Associates 7.21 3 Tidal Investments 4.86 4 Global X Management 3.74 5 The Vanguard Group 3.65 6 BlackRock 2.93 7 Rui Feng 2.75 8 J.P. Morgan Securities 2.19 9 Baillie Gifford

Slide 34: Strong & Improving ESG Ratings and Risk Profile
STRONG & IMPROVING ESG RATINGS AND RISK PROFILE TSX: SVM | NYSE AMERICAN SVM • Ranked top 66th percentile overall in Metals and Mining- Precious Metals RATING • Leads the industry in environmental A RATING management and community relations • Ranked top 10th percentile in the Precious Metals Sector

Slide 35: Fiscal Year 2026 Sustainability Highlights
FISCAL YEAR 2026 SUSTAINABILITY HIGHLIGHTS TSX: SVM | NYSE AMERICAN SVM Environment Health & Safety Social Responsibility Total Recordable Water recycling Incident Frequency Workforce from local 82% rate 1.10 Rate (per million 72% province working hours) Local supplier 36% Waste rock utilization rat

Slide 36: Leadership: A Solid History of Value Creation
LEADERSHIP: A SOLID HISTORY OF VALUE CREATION TSX: SVM | NYSE AMERICAN SVM Management Board of Directors Rui Feng, Ph.D., Geology Rui Feng, Ph.D., Geology Chairman and CEO Lon Shaver, CFA Yikang Liu, Former Dep. Gen. Sec. of the President China Mining Assoc.; over 40 years geological experience Winn

Slide 37: Appendices
APPENDICES HEAD OFFICE Suite 1750–1066 West Tel: 604-669-9397 TSX: SVM Hastings St. Vancouver, BC Investor@silvercorp.ca NYSE AMERICAN: SVM Canada V6E 3X1 www.silvercorpmetals.com 37

Slide 38: El Domo Capital Cost Estimate Details
EL DOMO CAPITAL COST ESTIMATE DETAILS TSX: SVM | NYSE AMERICAN SVM 1 3-Nov-26 30-Sep-26 Total Actual Total Remaining Updated Budget Expenditures (million) (million) (million) Package #1 Site preparation /Roads /Channels /TSF /SWD 57.2 26.7 30.5 Package #2 Open Pit Mining and Stripping 40.0 2.4 37.6

Slide 39: Kyrgyzstan Cost Estimate Details
KYRGYZSTAN COST ESTIMATE DETAILS TSX: SVM | NYSE AMERICAN SVM 1 Total 2026 2027 Cost Items ($ Million) ($ Million) ($ Million) Phase 1 Development of Tulkubash Mining Open Pit and Waste Dump 51.5 10.6 40.9 Mine Pit Water Treatment Plant 3.0 - 3.0 Mine Auxiliary Facilities 8.0 2.1 5.9 Heap Leach Syst

Slide 40: Realized Metal Price Examples
REALIZED METAL PRICE EXAMPLES TSX: SVM | NYSE AMERICAN SVM Silver Gold Lead Zinc US$ Per Ounce US$ Per Ounce US$ Per Pound US$ Per Pound *Net of value added tax Shanghai Metal Exchange quoted prices on June 16, 2026: Silver=16.590 RMB/gram, Gold=938.570 RMB/gram, Lead=16,125 RMB/tonne, Zinc=24,640 R

Slide 41: Extensive Exploration for Organic Growth
EXTENSIVE EXPLORATION FOR ORGANIC GROWTH TSX: SVM | NYSE AMERICAN SVM Silvercorp’s extensive drilling & tunnelling Ying: 2,892 km of drilling and 923 km of tunnelling since 2004 GC: 576 km of drilling and 128 km of tunnelling since 2004 Kilometer Calendar Year Benefits of drilling 1) Made new discov

Slide 42: El Domo Overview: Mining Title and Interest
EL DOMO OVERVIEW: MINING TITLE AND INTEREST TSX: SVM | NYSE AMERICAN SVM 1. Medium scale mining concession title for 25 years granted for Las Naves Concession containing the El Domo Project 2. Located 20 km from Pan-American highway and 3-hour drive from Guayaquil 3. Surface rights acquired for appr

Slide 43: BYP Gold Mine
BYP GOLD MINE TSX: SVM | NYSE AMERICAN SVM Preparing for production • Lead-Zinc mine suspended August 2014 • 2024 NI 43-101 gold resource identified 456,000 oz M&I and 116,000 oz inferred • Applied for a new gold mining permit See Appendix notes and a detailed breakdown of BYP’s Consolidated Measure

Slide 44: We Construct Green Mines That Generate Sustainable Value
WE CONSTRUCT GREEN MINES THAT GENERATE SUSTAINABLE VALUE TSX: SVM | NYSE AMERICAN SVM Tailings Dry Stacking & Tailings Back Fill Facility Upgraded Wastewater Treatment System GC MINE YING MINES Increases recycling, reduces freshwater consumption Ore Storage Facility at the Process Plant YING MINES Y

Slide 45: Summary of China Reserves
SUMMARY OF CHINA RESERVES1,2 TSX: SVM | NYSE AMERICAN SVM Average Grades Contained Metal Reserve Tonnes Project Silver Gold Lead Zinc Silver Gold AgEq3 Lead Zinc Category (Mt) (g/t) (g/t) (%) (%) (Moz) (Koz) (Moz) (Kt) (Kt) Proven 10.41 179 0.15 2.71 0.87 60 51 64 282 90 Ying Mining Probable 8.66 16

Slide 46: Summary of China Resources
SUMMARY OF CHINA RESOURCES1,2 TSX: SVM | NYSE AMERICAN SVM Contained Metal Average Grades Resource Tonnes (Inclusive of Reserves) Project’- Category (Mt) Silver Gold Lead Zinc Silver Gold AgEq3 Lead Zinc (g/t) (g/t) (%) (%) (Moz) (Koz) (Moz) (Kt) (Kt) Measured 20.94 164 0.15 2.62 0.78 110 99 119 548

Slide 47: El Domo: Resources and Reserves
EL DOMO: RESOURCES AND RESERVES TSX: SVM | NYSE AMERICAN SVM El Domo Open Pit Category Tonnes Grade Contained Metal Cu Pb Zn Au Ag Cu Pb Zn Au Ag (Mt) (%) (%) (%) (g/t) (g/t) (kt) (kt) (kt) (koz ) (koz ) Proven 2.7 2.60% 0.26% 2.63% 3.33 48 69.3 7.0 70.2 285 4,153 Probable 4.5 1.53% 0.26% 2.63% 2.08

Slide 48: Condor: Resources
CONDOR: RESOURCES TSX: SVM | NYSE AMERICAN SVM Condor Underground Constrained Resource Average Grade Contained Metal Deposit Tonnes AuEq Au Ag Pb Zn AuEq Au Ag Pb Zn (Mt) (g/t) (g/t) (g/t) (%) (%) (Moz) (Moz) (Moz) (Mlb) (Mlb) Camp 5.93 2.46 1.94 15.51 0.06 0.61 0.47 0.37 3 8 80 Los Cuyes 4.22 2.07

Slide 49: Kyrgyzstan: Mineral Resources Estimate
KYRGYZSTAN: MINERAL RESOURCES ESTIMATE TSX: SVM | NYSE AMERICAN SVM Tulkubash Mineral Resource Estimate in Pit constrained Tulkubash 2025 In-house MRE (COG Au 0.21g/t) 40/80M Category Tonnes (Mt) Au Grade (g/t) Ag Grade (g/t) Contained Au (koz) Contained Ag (koz) Measured 7.35 1.61 1.38 380.5 327.0

Slide 50: Cautionary Statements
CAUTIONARY STATEMENTS TSX: SVM | NYSE AMERICAN SVM Qualified Persons (Silvercorp) The scientific and technical information related to Silvercorp’s projects contained herein has been reviewed and approved by Guoliang Ma, P. Geo., who is a Qualified Person (“QP”) within the meaning of National Instrum
Source: company website
More decks from Silvercorp Metals Inc.
Investor Presentation (October 2026)48 slides · October 2026
Investor Presentation (September 2026)49 slides · September 2026
Investor Presentation (August 2026)49 slides · August 2026
Investor Presentation (July 2026)47 slides · July 2026
Investor Presentation (June 2026)46 slides · June 2026
Investor Presentation (June 2026)46 slides · June 2026