Lundin Mining Corporation · TSX:LUN

Lundin Mining — Investor Presentation (November 2009)

22 slides from Lundin Mining's investor presentation, November 2009

  1. Slide 1: Corporate Presentation November 2009

    TSX: LUN TSX OMX: LUMI Phil Wright Chief Executive Corporate Presentation November 2009

  2. Slide 2: Cautionary Statements

    2 Cautionary Statements Caution Regarding Forward Looking Statements This ppresentation contains forward-lookingg statements. These forward-lookingg statements are not based on historical facts, but rather on current expectations and projections about future events. These forward-looking statements

  3. Slide 3: About Lundin Mining

    3 About Lundin Mining • Experienced • Excellent evaluation • Strong operations team • Successful track record capabilities in multiple jurisdictions • Strong backing of major • Extensive international • Exploration team covers shareholder p experience Americas;; Europe; p ; • Large-scale feasibiliti

  4. Slide 4: Two Key Asset Groups

    4 Two Key Asset Groups Europe Tenke Business D l Developmentt 100% ownership 24.75% 3 operating mines Tier 1 asset What’s next Copper, zinc, lead, l d Freeport operator nickel Copper, cobalt Corporate Operations Projects Exploration Growth

  5. Slide 5: Asset Location

    5 Asset Location Corporate Operations Projects Exploration Growth

  6. Slide 6: Production Profile and Earnings History

    6 Production Profile and Earnings History Production Profile Operating Results ktpa $mn Copper Zinc Lead Nickel Earnings Cashflow 175 700 150 600 125 500 100 400 * 75 300 50 200 25 100 0 0 2005 2006 2007 2008 2009 2005 2006 2007 2008 9 mth F'Cast 2009 * Excludes approx 17,000t attributable productio

  7. Slide 7: European Business

    7 European Business ƒ All operations cashflow positive Neves-Corvo ƒ Leverage g to commodityy cycle y ƒ Good internal growth prospects ƒ Stable jjurisdiction/low ppolitical risk Zinkgruvan ƒ Cash cost competitive Aguablanca Corporate Operations Projects Exploration Growth

  8. Slide 8: Neves-Corvo Mine: Copper/Zinc: Portugal

    8 Neves-Corvo Mine: Copper/Zinc: Portugal ƒ Estimated E i d 10+ 10 year mine i life lif ƒ 2009 production estimate: o 84,000t , copper pp ƒ 2009 cash cost estimate: o $1.10/lb of copper* ƒ Zinc expansion Zi i projectj t tto produce d minimum i i off 50,000 tpa: first production expected Q1 ‘11; esti

  9. Slide 9: Exploration: Neves-Corvo

    9 Exploration: Neves-Corvo Neves Corvo Drillhole From (m) To (m) Length (m) Cu % Zn % NK26 1,230.0 1,252.0 22.0 5.89 0.22 NK26-2 1,143.9 1,155.5 11.6 3.13 0.10 NJ26 1,258.5 1,264.0 5.5 4.20 0.10 NJ26-2 1,122.0 1,154.0 32.0 3.81 1.37 plus 1,173.0 1,196.0 23.0 0.40 7.28 plus p 1,214.0 1,250.0 36.0 0.4

  10. Slide 10: Zinkgruvan Mine: Zinc/Lead/Copper: Sweden

    10 Zinkgruvan Mine: Zinc/Lead/Copper: Sweden ƒ Estimated 10+ year mine life ƒ 2009 production estimate: o 72,000t zinc o 34,000t lead ƒ 2009 cash h costt estimate: ti t o 30c/lb of zinc ƒ Further throughput increases possible ƒ Copper project continues within budget and is on track for first copper

  11. Slide 11: Aguablanca Mine: Nickel/Copper: Spain

    11 Aguablanca Mine: Nickel/Copper: Spain ƒ Estimated 5 year mine life ƒ 2009 production estimate: o 7,200t nickel o 7,000t copper ƒ 2009 cash cost estimate: o $5.00/lb of nickel ƒ Potential for underground ndergro nd mine to supplement open-pit :under g investigation Corporate Operations Projects Ex

  12. Slide 12: Tenke Fungurume Investment

    12 Tenke Fungurume Investment ƒ 24.75% equity interest ƒ Large long-life Large, long-life, low-cost, low-cost high- Tenke growth asset g Fungurume ƒ Potential to be one of the world’s largest producers of copper and cobalt ƒ F Freeport t iis operator t ƒ Higher political risk Corporate Operations Pr

  13. Slide 13: Tenke Fungurume – Phase I Built

    13 Tenke Fungurume – Phase I Built Corporate Operations Projects Exploration Growth

  14. Slide 14: Tenke Copper Production

    14 Tenke Copper Production Corporate Operations Projects Exploration Growth

  15. Slide 15: Tenke Overview – Lundin 24.75% equity interest

    15 Tenke Overview– Lundin - 24.75% equity interest ƒ $ $1.8 billion construction substantiallyy complete p Solution loaded with Copper ƒ First shipment of copper cathode in April; First saleable cobalt produced in May ƒ Capacity of 115,000 tpa of copper already reached in September - 9,000 tpa of co

  16. Slide 16: Tenke – A Mining District

    16 Tenke – A Mining District Tenke Fungurume Concessions Airstrip Construction Village Overburden Storage Plan Area Processing Facility Tenke Fungurume Tailings Pond Fwaulu Deposits Kwatebala Deposit Power Substation Tenke Village ill Dipeta Syncline Exploration Tenke Deposits Fungurume Village Camp

  17. Slide 17: Tenke – Exploration

    17 Tenke – Exploration F 005 N F 104 N F 103 N F 112 N Oxide Ore ƒ Only half the concession has been explored Mixed Ore ƒ 20 deposits have been drilled but mineral resources only completed for 7, mineral 200 Sulfide Ore 00m reserves only completed for 5. Bearing Beds ƒ Expansion feasibility studies

  18. Slide 18: Tenke – Distribution of Benefits

    18 Tenke – Distribution of Benefits Direct Benefits ƒ Tenke agreements fair, equitable, 57% of Direct Benefits stay within DRC comply with Congolese laws, and enforceable without modifications TF Holdings ƒ Dialogue continues with DRC 43% authorities to reach resolution Gécamines 11% ƒ In addition t

  19. Slide 19: Tenke – Current Focus

    19 Tenke – Current Focus ƒ Optimise existing facilities ƒ Continue to define district through exploration ƒ Advance Ad feasibility f ibilit study t d in i Q4 ‘09 on iincremental t l expansion/de- i /d bottlenecking o Relativelyy low capital p o Increase current capacity by 50% ƒ Exploration results

  20. Slide 20: Corporate and Business Development What's Next

    20 Corporate and Business Development ƒ Strategically we remain active portfolio managers and are looking to upgrade our base-metal base metal assets and investments What’s Next ƒ With Europep runningg well and Tenke in excellent hands, we are increasing our corporate and business development activi

  21. Slide 21: Lundin Mining Summary

    21 Lundin Mining Summary ƒ In the short-term ((<12 months)) we remain cautious with a continued focus on tight expenditure controls ƒ In medium to longer term, supply constraints expected to emerge with the potential t ti l for f base b metal t l prices i tto move significantly i ifi tl hihigher h ƒ

  22. Slide 22: Annual Meeting of Shareholders

    May 15, 2009 TSX: LUN TSX OMX: LUMI Corporate Presentation 2009 Annual Meeting g of Shareholders November 2009

Lundin Mining — Investor Presentation (November 2009) on 6ix