Resources & Energy Group Limited · ASX:REZ
Resources & Energy — Investor Presentation (June 2026)
14 slides from Resources & Energy's investor presentation, June 2026

Slide 1: Production Funding Exploration – Investor Presentation
Production Funding Exploration Investor Presentation East Menzies Gold Project, WA | ASX:REZ June 2026 REZGROUP.COM.AU

Slide 2: Disclaimer
Disclaimer The material in this presentation has been prepared by Resources & Energy Group Limited ("Company"). The material contained in this presentation is for information purposes only. This presentation is not an offer or invitation for subscription or purchase of, or a recommendation in relati

Slide 3: East Menzies Gold Project — WA's Eastern Goldfields
East Menzies Gold Project — WA's Eastern Goldfields Consolidated portfolio: 60+ tenements over 103 km², 20km of mineralised strike, four gold deposits PROJECT FOOTPRINT Location 130km N of Kalgoorlie, WA Infrastructure Goldfields Highway, adjacent township with services Tenement package 60+ granted

Slide 4: Where is the Menzies Consolidated Gold Field?
Where is the Menzies Consolidated Gold Field? ► Right on the Green Stone Fairway ► 1 Hour from Kalgoorlie Super Pit ► Last known un-exploited gold field ► Significant gold mining activity and mills within 100kms ► A new Gold Rush occurring within the Menzies shire - previous Gold Rush supported 3 ba

Slide 5: A self-funded WA gold story across three concurrent stages
REZ — Production Funding Exploration A self-funded WA gold story across three concurrent stages MINING 2026 DEVELOPING DISCOVERING Maranoa Goodenough Gigante Grande 8,000 oz 61,200 oz 40,700 oz Inferred Resource — JV announced MRE JORC 2012 (92% Indicated, Mar 2026) Inferred MRE + 6km strike open Su

Slide 6: The Production Funding Exploration Model
The Production Funding Exploration Model Self-funding growth: Maranoa JV cashflow underwrites resource drilling 1 MINE 2 FUND Maranoa JV JV cashflow Mine 8,000oz Au in 2026 via Reinvest funds in scoping and optimisation, Rembrandt Mining JV and further brown fields exploration SELF-FUNDING CYCLE 4 D

Slide 7: Maranoa — JV Mining Campaign 2026
Maranoa — JV Mining Campaign 2026 Successful trial complete JV with Rembrandt Mining executed to mine 8,000oz in 2026 8,000 oz Inferred Mineral Resource (46 kt @ 5.7 g/t Au, JORC 2012) Trial done Vat leach trial complete — 3 doré pours (Feb–Jun 2025) confirmed process viability Joint venture execute

Slide 8: Maranoa — Rembrandt Mining Partnership
Maranoa — Rembrandt Mining Partnership ASX:REZ Binding term sheet executed June 2026 · Operator-funded mining · Sliding-scale profit share REZ-favoured W H O R EM BR ANDT IS W H AT TH E JV DO ES Private WA gold mining operator Tribute mining of Maranoa Mining Target Adrian Hall — Managing Director O

Slide 9: Maranoa — Selective Mining & Processing Strategy
Maranoa — Selective Mining & Processing Strategy ASX:REZ Low-dilution selective mining · Dual processing pathway maintained · Strategy designed to maximise net recovered ounces SELECTIVE MINING VAT L E A C H TOLL MILL Maximising recovered ounces — not bulk movement Pathway A · Onsite · Approvals in

Slide 10: Granny Venn — Campaign Reference & Portfolio Upside
Granny Venn — Campaign Reference & Portfolio Upside REZ has done this before — Granny Venn delivered A$23M revenue / A$7.5M profit at A$2,600/oz gold (FY2021/22) PROVEN TRACK RECORD — FY2021/22 Milled 130,000 t Gold recovered 8,700 oz Gold price (then) A$2,600/oz Revenue A$23M Profit A$7.5M Cash fro

Slide 11: Goodenough — The Next Mine (after Maranoa)
Goodenough — The Next Mine (after Maranoa) 61.2koz JORC 2012 (92% Indicated) — toll-milled production pathway JORC 2012 MINERAL RESOURCE (MAR 2026) PATHWAY TO PRODUCTION DONE Open pit optimisation study completed (2023) Classification Tonnes Grade (g/t) Ounces DONE Mar 2026 MRE upgrade to 61.2koz (5

Slide 12: Gigante Grande – Maiden Mineral Resource Established
East Menzies Gigante Grande – Project tenement, Maiden Mineral Resource exploration target zones Granny Venn Established and prospect 3,000oz Au location map. ► Data review of 7km gold mineralised system at Gigante Grande (GG) completed by ERM Consultants ► Initial Inferred Mineral Resource: 1.39Mt

Slide 13: Gigante Grande — Discovery Upside
Gigante Grande — Discovery Upside Maiden 40,700oz Inferred. A large low-grade system with + 6km mineralised strike open to North, South and at depth 40,700 oz Au Maiden Inferred Mineral Resource Estimate 1.39 Mt @ 0.91 g/t Au (Sep 2025, ERM) 160-500k oz Au Exploration Target Gigante Grande Central D

Slide 14: Production Funding Exploration – Contacts
Production Funding Exploration REZ — Resources & Energy Group Limited | ASX:REZ | rezgroup.com.au CONTACTS J. Daniel Moore Mark Flynn Managing Director and CEO Investor Relations communications@rezgroup.com.au mflynn@rezgroup.com.au +61 2 9227 8900 +61 416 068 733 REZGROUP.COM.AU
Source: company website
More decks from Resources & Energy Group Limited
Australian Gold Conference (October 2026)15 slides · Oct 14, 2026
Shareholder Meeting (November 2025)18 slides · Nov 28, 2025
Investor Presentation (September 2024)15 slides · September 2024
Investor Presentation (April 2024)13 slides · April 2024
Investor Presentation (November 2023)14 slides · November 2023
Investor Presentation (October 2023)16 slides · October 2023