Kinross Gold Corporation · TSX:K

Kinross Gold — Technical Presentation (April 2014)

16 slides from Kinross Gold's technical presentation, Apr 1, 2014

  1. Slide 1: Results of the Tasiast Feasibility Study

    April 1 KINROSS GOLD CORPORATION 2014 Results of the Tasiast feasibility study 11 www.kinross.com

  2. Slide 2: Cautionary Statement on Forward-Looking Information

    CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained or incorporated by reference in or made in giving this presentation, and responses to questions, including any information as to the future performance of Kinross or the Tasiast mi

  3. Slide 3: J. Paul Rollinson, Chief Executive Officer

    J. PAUL ROLLINSON CHIEF EXECUTIVE OFFICER 33 www.kinross.com

  4. Slide 4: Disciplined Project Development: Potential Mill Expansion at Tasiast

    DISCIPLINED PROJECT DEVELOPMENT POTENTIAL MILL EXPANSION AT TASIAST Pre-Feasibility Feasibility Moving Forward Study Study • Evaluated and narrowed • Detailed study of 38k tpd mill • Do not expect to make a final options scenario decision whether to proceed until 2015 at the earliest • Identified op

  5. Slide 5: Feasibility Study on Mill Expansion Complete

    FEASIBILITY STUDY ON MILL EXPANSION COMPLETE • Feasibility study based on 38,000 tpd mill produced promising results • A mill expansion has the potential to:  Add a major source of new production to Kinross’ portfolio  Lower the company’s overall cost structure  Generate significant cash flow 55

  6. Slide 6: Key Highlights: Mill Expansion Feasibility Study Estimates

    KEY HIGHLIGHTS MILL EXPANSION FEASIBILITY STUDY ESTIMATES Improved economics are primarily the result of estimated lower capital expenditures, an optimized mine plan and lower expected operating costs AVERAGE FOR THE FIRST 5 YEARS LIFE OF MINE (2018-2022) (2014-2029) Average annual production 848,00

  7. Slide 7: Reduced Execution Risk

    NEW TRUCK MAINTENANCE FACILITY REDUCED EXECUTION RISK • Operating site with highly trained local team in place • Basic infrastructure has already been completed • Extremely well-defined estimated mineral resource • Major permits and concession rights in place CURRENT PIT OPERATIONS WASTE & WATER TRE

  8. Slide 8: Reduced Capital Expenditure Estimate

    TASIAST FEASIBILITY STUDY RESULTS REDUCED CAPITAL EXPENDITURE ESTIMATE Initial capital expenditure estimate of $1.6 billion significantly lower than original $2.7 billion estimated in the pre-feasibility study 2013 infrastructure spending Deferral of $2.7B $330M seawater pipeline Spending Included t

  9. Slide 9: Lower Operating Cost Estimates

    TASIAST FEASIBILITY STUDY RESULTS LOWER OPERATING COST ESTIMATES Based on the mill feasibility study results, an expanded Tasiast is expected to be among Kinross’ lowest cost operations • Benefit of higher grade ore from the Greenschist zone • Identified a number of mining and processing cost saving

  10. Slide 10: Mineral Reserve & Resource Estimates

    TASIAST FEASIBILITY STUDY RESULTS MINERAL RESERVE & RESOURCE ESTIMATES(5) Optimized 38k tpd mine plan reclassifies 3.1 million ounces of Measured & Indicated gold resources to Proven & Probable gold reserves 9.6 Based on 8k tpd mine plan Based on 38k tpd mine plan 7.8 OUNCES (MILLIONS) 6.5 4.7 0.7 0

  11. Slide 11: Moving Forward

    TASIAST FEASIBILITY STUDY RESULTS MOVING FORWARD Kinross does not expect to make a final decision whether to proceed with a potential mill expansion until 2015 at the earliest CRITICAL FACTORS FOR DECISION INCLUDE: • Continuation of a conducive investment climate in Mauritania  Assurance of appropr

  12. Slide 12: Appendix

    APPENDIX TASIAST FEASIBILITY STUDY RESULTS 1212 www.kinross.com

  13. Slide 13: Mill Feasibility Study Estimates

    APPENDIX MILL FEASIBILITY STUDY ESTIMATES AVERAGE FOR FIRST 5 YRS LIFE OF MINE (2018-2022) (2014-2029) Average annual production 848,000 oz. 563,000 oz. Cash costs(1) $501/oz. $616/oz. All-in cost(2) $792/oz. $878/oz. Average grade (weighted), CIL 2.09 g/t 1.76 g/t Processing cost, CIL $14.62 per to

  14. Slide 14: Breakdown of Cost Estimates

    APPENDIX BREAKDOWN OF COST ESTIMATES AVERAGE FOR THE FIRST FIVE YEARS (2018-2022) PER OUNCE Mining $92 Processing (milled + leached) $236 Site administration $95 Royalties (5%) $68 Refining, transport, and other $10 TOTAL CASH COST $501 TOTAL ALL-IN COST(2) $792 LIFE OF MINE (2014-2029) PER OUNCE Mi

  15. Slide 15: Endnotes

    ENDNOTES 1) Cash costs include estimated operating costs and royalties. 2) All-in cost include operating costs, royalties, sustaining capital, and capitalized stripping, and does not include an estimated initial capital expenditure of $1.6 billion, any exploration, income taxes, non-cash items relat

  16. Slide 16: Kinross Gold Corporation

    KINROSS GOLD CORPORATION 25 York Street, 17th Floor │Toronto, ON │ M5J 2V5 www.kinross.com 1616 www.kinross.com