Greenx Metals Limited · ASX:GRX

Greenx Metals — Prairie Downs Metals — Investor Presentation (November 2013)

21 slides from Greenx Metals's investor presentation, November 2013

  1. Slide 1: Lublin Coal Project Company Presentation

    ABN 23 008 677 852 Lublin Coal Project Company Presentation November 2013 ASX: PDZ

  2. Slide 2: Investment Highlights

    Investment Highlights Massive Untapped Resource  1.6Bt Inferred JORC Coal Resource 1.6Bt Base (Inferred JORC Resource)  327Mt in the thick, continuous 391 coal seam 6,900+ kcal/kg  Metallurgical and thermal Coal Properties Premium Quality Coal 5.5 FSI  Semi-Soft Benchmark / Premium ARA Thermal Q

  3. Slide 3: Corporate Structure

    Corporate Structure Issued Share Capital 118,835,879 Options (15c exp. 30 June 2015) 14,007,133 Management Options (25c-60c exp. 30 June 2016-2017) 7,250,000 Market Capitalisation (A$0.37/share, undiluted) ~A$44 million Cash @ Bank ~A$4 million Listed Marketable Securities Held ~A$11 million Enterpr

  4. Slide 4: An Untapped Coal Basin

    An Untapped Coal Basin The Lublin Coal Basin is set to become Europe’s next strategic, low cost and secure supplier of coal…  Located in the Lubelski region of Poland, the Lublin Coal Basin has seen operations since 1991 as compared to many centuries for most other European Coal Basins  Prairie ha

  5. Slide 5: Metallurgical & Thermal Potential

    Metallurgical & Thermal Potential Initial testing has indicated that the Lublin Coal Project hosts metallurgical coal potential which compares very well with current semi-soft benchmark coals… 391 Coal Seam Quality & Comparisons Semi-Soft Coking (Typical) Thermal 391 Seam Hunter Valley Russia Poland

  6. Slide 6: Dominant Basin Position

    Dominant Basin Position Prairie has a dominant position with its 100% owned Lublin Coal Project which has a 1.6 Billion tonne Inferred JORC Compliant Coal Resource Estimate… 391 Seam 379 Seam 382 Seam 327 Million tonnes 190 Million tonnes 163 Million tonnes 8.4% Ash 12.4% Ash 11.6% Ash 6,908 kcal/kg

  7. Slide 7: Favourable Geology

    Favourable Geology 327 million tonne Inferred JORC Compliant Coal Resource in the one thick, contiguous and high quality 391 coal seam… 1 JORC (Inferred), refer to maiden coal resource announcement on 14 February 2013 Note: 391 seam isopachs based on historical core and geophysical logs 7

  8. Slide 8: An Emerging Low Cost European Basin

    An Emerging Low Cost European Basin The Lublin Coal Basin is set to become the pre-eminent coal basin in Europe given favourable geology… Size (hectares) 9,100 km2 Years in Production 30 Production 8.5 mtpa Lublin Coal Basin No. Operating Mines 1 300 metre face Typical Longwall Panel Up to 5 km leng

  9. Slide 9: Proven World Class Mining Methods

    Proven World Class Mining Methods World record setting longwall plow technology deployed in the Lublin Coal Basin Q2 2013 Unit Mining Cash Costs (Source: Company Filings, 3.15 PLN/USD, 0.74 EUR/USD)  The Lublin Coal Basin provides ideal conditions for high productivity longwall plow operations with

  10. Slide 10: First Quartile Cash Costs

    First Quartile Cash Costs New projects in the Lublin Coal Basin have strong potential to be in the lowest quartile of the cost curve for thermal coal delivered into Europe… 2013 CFR ARA Energy Adjusted Cash Costs Curve Russia Lublin Coal Basin1 Colombia Source: Wood Mackenzie - Total Cash Costs plus

  11. Slide 11: Export & Domestic Infrastructure

    Export & Domestic Infrastructure Rail, Port and Power infrastructure are all in place for new developments to supply both export and domestic European markets… Underutilised Coal Export Ports  Poland was the world’s 2nd largest coal exporter during the 1980’s, exporting 45mtpa  Capesize and Panama

  12. Slide 12: Competitive Freight Advantage

    Competitive Freight Advantage Lublin Coal Project’s location and access to infrastructure gives it a distinct advantage to capture key regional markets for both metallurgical and thermal coals… Excellent Seaborne European Market Penetration  Ability to penetrate all key European markets with access

  13. Slide 13: Coking Coal Markets

    Coking Coal Markets European, South American & Indian coke markets will remain in need of increased imported coal into the future… Breakdown Seaborne Metallurgical Coal Trade (261mt) Seaborne Metallurgical Coal Demand – 2013 & Growth to 2035  Lublin Basin Coal can fill a significant need for domest

  14. Slide 14: European Thermal Coal Markets

    European Thermal Coal Markets European thermal markets face increased reliance on imported coal increasing the strategic value of the Lublin Coal Project as a source of fuel supply for the power generation sector… European Thermal Coal Imports & Exports 2012 European Import Origin Countries  Europe

  15. Slide 15: Project Timeline

    Project Timeline Potential for market re-rating in the short term… 2013 2014 2015 Project Milestones Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Maiden Resource Estimate  Strengthen Management Team   Drilling Program (7-hole) & Coal Quality Scoping Study EIA (EP compliant) Infill Drilling Pre-Feasibility

  16. Slide 16: Progressing Drilling & Studies

    Progressing Drilling & Studies Core Drilling Program Drill Rig on Site  A core drilling campaign is presently underway to: – update the coal quality and washability database to determine potential product pricing and yields – enhance the Project’s geological model and delineate outer boundaries of

  17. Slide 17: Board of Directors

    Board of Directors Strong board with proven development experience…  Highly respected, London based, mining engineer and investment banker; holds a NSW mine managers certificate of competency for underground coal mining with significant experience in longwall mining operations Ben Stoikovich Chief

  18. Slide 18: Polish Executive Team

    Polish Executive Team Respected and established Polish team…  Geologist with over 30 years experience and a proven ability in the identification, exploration and appraisal of international Janusz Jakimowicz resource projects; Dual Polish and Australian citizenship President & Chairman of PD Co  In

  19. Slide 19: Poland: A favorable investment jurisdiction

    Poland: A favorable investment jurisdiction Poland is a safe, low risk mining jurisdiction with an excellent fiscal regime… Belchatow Power Station (4,440MW) in Poland  One of the most attractive fiscal regimes globally for coal 19% corporate tax rate No Requirement for Government Participation 4PL

  20. Slide 20: Global Coal Producer Comparables

    Global Coal Producer Comparables 20

  21. Slide 21: Disclaimer

    Disclaimer Important Information This presentation has been prepared as a summary only, and does not contain all information about Prairie Downs Metals Limited’s (“Prairie”) assets and liabilities, financial position and performance, profits and losses, prospects, and the rights and liabilities atta

Prairie Downs Metals — Investor Presentation (November 2013) on 6ix