Slide 1: Lublin Coal Project Company Presentation
ABN 23 008 677 852 Lublin Coal Project Company Presentation November 2013 ASX: PDZ
Slide 2: Investment Highlights
Investment Highlights Massive Untapped Resource 1.6Bt Inferred JORC Coal Resource 1.6Bt Base (Inferred JORC Resource) 327Mt in the thick, continuous 391 coal seam 6,900+ kcal/kg Metallurgical and thermal Coal Properties Premium Quality Coal 5.5 FSI Semi-Soft Benchmark / Premium ARA Thermal Q
Slide 3: Corporate Structure
Corporate Structure Issued Share Capital 118,835,879 Options (15c exp. 30 June 2015) 14,007,133 Management Options (25c-60c exp. 30 June 2016-2017) 7,250,000 Market Capitalisation (A$0.37/share, undiluted) ~A$44 million Cash @ Bank ~A$4 million Listed Marketable Securities Held ~A$11 million Enterpr
Slide 4: An Untapped Coal Basin
An Untapped Coal Basin The Lublin Coal Basin is set to become Europe’s next strategic, low cost and secure supplier of coal… Located in the Lubelski region of Poland, the Lublin Coal Basin has seen operations since 1991 as compared to many centuries for most other European Coal Basins Prairie ha
Slide 5: Metallurgical & Thermal Potential
Metallurgical & Thermal Potential Initial testing has indicated that the Lublin Coal Project hosts metallurgical coal potential which compares very well with current semi-soft benchmark coals… 391 Coal Seam Quality & Comparisons Semi-Soft Coking (Typical) Thermal 391 Seam Hunter Valley Russia Poland
Slide 6: Dominant Basin Position
Dominant Basin Position Prairie has a dominant position with its 100% owned Lublin Coal Project which has a 1.6 Billion tonne Inferred JORC Compliant Coal Resource Estimate… 391 Seam 379 Seam 382 Seam 327 Million tonnes 190 Million tonnes 163 Million tonnes 8.4% Ash 12.4% Ash 11.6% Ash 6,908 kcal/kg
Slide 7: Favourable Geology
Favourable Geology 327 million tonne Inferred JORC Compliant Coal Resource in the one thick, contiguous and high quality 391 coal seam… 1 JORC (Inferred), refer to maiden coal resource announcement on 14 February 2013 Note: 391 seam isopachs based on historical core and geophysical logs 7
Slide 8: An Emerging Low Cost European Basin
An Emerging Low Cost European Basin The Lublin Coal Basin is set to become the pre-eminent coal basin in Europe given favourable geology… Size (hectares) 9,100 km2 Years in Production 30 Production 8.5 mtpa Lublin Coal Basin No. Operating Mines 1 300 metre face Typical Longwall Panel Up to 5 km leng
Slide 9: Proven World Class Mining Methods
Proven World Class Mining Methods World record setting longwall plow technology deployed in the Lublin Coal Basin Q2 2013 Unit Mining Cash Costs (Source: Company Filings, 3.15 PLN/USD, 0.74 EUR/USD) The Lublin Coal Basin provides ideal conditions for high productivity longwall plow operations with
Slide 10: First Quartile Cash Costs
First Quartile Cash Costs New projects in the Lublin Coal Basin have strong potential to be in the lowest quartile of the cost curve for thermal coal delivered into Europe… 2013 CFR ARA Energy Adjusted Cash Costs Curve Russia Lublin Coal Basin1 Colombia Source: Wood Mackenzie - Total Cash Costs plus
Slide 11: Export & Domestic Infrastructure
Export & Domestic Infrastructure Rail, Port and Power infrastructure are all in place for new developments to supply both export and domestic European markets… Underutilised Coal Export Ports Poland was the world’s 2nd largest coal exporter during the 1980’s, exporting 45mtpa Capesize and Panama
Slide 12: Competitive Freight Advantage
Competitive Freight Advantage Lublin Coal Project’s location and access to infrastructure gives it a distinct advantage to capture key regional markets for both metallurgical and thermal coals… Excellent Seaborne European Market Penetration Ability to penetrate all key European markets with access
Slide 13: Coking Coal Markets
Coking Coal Markets European, South American & Indian coke markets will remain in need of increased imported coal into the future… Breakdown Seaborne Metallurgical Coal Trade (261mt) Seaborne Metallurgical Coal Demand – 2013 & Growth to 2035 Lublin Basin Coal can fill a significant need for domest
Slide 14: European Thermal Coal Markets
European Thermal Coal Markets European thermal markets face increased reliance on imported coal increasing the strategic value of the Lublin Coal Project as a source of fuel supply for the power generation sector… European Thermal Coal Imports & Exports 2012 European Import Origin Countries Europe
Slide 15: Project Timeline
Project Timeline Potential for market re-rating in the short term… 2013 2014 2015 Project Milestones Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Maiden Resource Estimate Strengthen Management Team Drilling Program (7-hole) & Coal Quality Scoping Study EIA (EP compliant) Infill Drilling Pre-Feasibility
Slide 16: Progressing Drilling & Studies
Progressing Drilling & Studies Core Drilling Program Drill Rig on Site A core drilling campaign is presently underway to: – update the coal quality and washability database to determine potential product pricing and yields – enhance the Project’s geological model and delineate outer boundaries of
Slide 17: Board of Directors
Board of Directors Strong board with proven development experience… Highly respected, London based, mining engineer and investment banker; holds a NSW mine managers certificate of competency for underground coal mining with significant experience in longwall mining operations Ben Stoikovich Chief
Slide 18: Polish Executive Team
Polish Executive Team Respected and established Polish team… Geologist with over 30 years experience and a proven ability in the identification, exploration and appraisal of international Janusz Jakimowicz resource projects; Dual Polish and Australian citizenship President & Chairman of PD Co In
Slide 19: Poland: A favorable investment jurisdiction
Poland: A favorable investment jurisdiction Poland is a safe, low risk mining jurisdiction with an excellent fiscal regime… Belchatow Power Station (4,440MW) in Poland One of the most attractive fiscal regimes globally for coal 19% corporate tax rate No Requirement for Government Participation 4PL
Slide 20: Global Coal Producer Comparables
Global Coal Producer Comparables 20
Slide 21: Disclaimer
Disclaimer Important Information This presentation has been prepared as a summary only, and does not contain all information about Prairie Downs Metals Limited’s (“Prairie”) assets and liabilities, financial position and performance, profits and losses, prospects, and the rights and liabilities atta
Prairie Downs Metals — Investor Presentation (November 2013) on 6ix