Elixir Energy Limited · ASX:EXR

Elixir Energy — Shareholder Meeting (November 2017)

18 slides from Elixir Energy's shareholder meeting presentation, Nov 30, 2017

  1. Slide 1: Elixir 2017 Annual General Meeting

    Elixir 2017 Annual General Meeting For personal use only Mongolian CBM Acquisition update (ASX:EXR) November 2017

  2. Slide 2: Investment Highlights

    Investment Highlights For personal use only  Golden Horde Ltd (GOH) was established in 2011 as a pure play Mongolian CBM gas (coal- bed methane – CSG in Australia) exploration venture  GOH has advised Elixir that it anticipates an award of a PSC (with >40 year tenure) in Q1 2018, after which the e

  3. Slide 3: Transaction milestones progressing

    Transaction milestones progressing For personal use only  Deadline now passed for superior offer for GOH providing Elixir with exclusivity to acquire all of the shares of GOH on or before 30 September 2018  GOH Managing Director recently visited Ulaanbaatar to progress discussions with the Mongoli

  4. Slide 4: Project Area Key Facts

    Project Area Key Facts For personal use only  Large 7 million acre project area – 100% ownership  World class producing thermal coal deposits within project area in South Gobi coal basin  Close to border of world’s 3rd largest gas user in Northern China  Will be first unconventional hydrocarbon

  5. Slide 5: Project Area Key Facts (cont.)

    Project Area Key Facts (cont.) For personal use only World class producing thermal coal deposits within project area (South Gobi basin) Large 7 million acre project area – 100% ownership China/Mongolia Southern Border  Technical studies indicate South Gobi Basin most prospective basin in Mongolia f

  6. Slide 6: Key Technical Components for CBM

    Key Technical Components for CBM For personal use only Properties Bowen Basin Block IX Comments (Queensland) (South Gobi Basin) World class seam thickness –  Seam Maximum single seam > 55m found in multiple thickness thickness 30m occurrences very high GIP per acre 7-14 m3/tonne in most Up to 15 m3

  7. Slide 7: CBM Potential in Mongolia

    CBM Potential in Mongolia For personal use only Mongolia has all the elements in place to support the development of a CBM industry • Mongolia is endowed with enormous coal resources Geology • The rank and quality of these coals is considered suitable for CBM • Extensive coal resources within the ex

  8. Slide 8: GOH's road to a CBM PSC

    GOH’s road to a CBM PSC For personal use only  GOH executed a CBM Prospecting Contract with the Petroleum Authority of Mongolia (PAM) in January 2016  Work under that Contract was finalised in 2016:  Data gathering and field prospecting – summarised in a formal Prospecting Report delivered to the

  9. Slide 9: Project Milestones

    Project Milestones EXR to commence exploration activity pre PSC award date For personal use only Completed Forward Programme Award of PSC Initial Sign Capital Shareholder Technical Prospective Initial Drilling and Settlement Terms Raise Approval Studies Resource Programme of Acquisition Sheet ($1.6M

  10. Slide 10: Work Programme and Budget – the next years

    Work Programme and Budget – the next 2 years For personal use only Year one Year two Use of funds: (2018) (2019) Working Capital 750,000 750,000 Annual Permit costs 326,667 326,667 Signature Bonus 66,667 - Prospective Resource Studies 50,000 50,000 G&G Studies 150,000 150,000 2018 Drilling (2 wells)

  11. Slide 11: Pro Forma Capital Structure

    Elixir Petroleum Limited (ASX:EXR) Pro Forma Capital Structure For personal use only Pre Acquisition Post Acquisition Current (million) Current (million) Ordinary Shares (ASX:EXR) 221.4 Ordinary Shares (ASX:EXR) 300.4 Unlisted Options (ex 4.0 – 4.5 cents) 11.0 Unlisted Options (ex 4.0 – 4.5 cents) 1

  12. Slide 12: Summary

    Summary  Modest initial investment with long activity timeline For personal use only  First mover status on ASX with significant upside  100% ownership and control over project – essential for small company  GOH has extensive relationships in Mongolia at both government and business level  Clea

  13. Slide 13: Important Notice & Disclaimer

    Important Notice & Disclaimer For personal use only This document has been prepared by Elixir Petroleum Limited (ABN 51 108 230 995) (“Elixir”) in connection with providing an overview of its business to interested analysts/investors. This presentation is being provided for the sole purpose of provi

  14. Slide 14: Contact Information

    Contact Information For personal use only Dougal Ferguson Managing Director +61 (08) 9226 2111 dferguson@elixirpetroleum.com 14

  15. Slide 15: Appendices

    Appendices For personal use only 1. Peer Companies in China and Mongolia 2. Golden Horde Team 3. What is Coal Seam Gas? 15

  16. Slide 16: Peer Companies in China and Mongolia

    Peer Companies in China and Mongolia For personal use only Company Summary of operations Market Capitalisation Green Dragon • China CBM play Gas • 60/40 Joint Venture with Petro China GBP 92 Million (LSE:GDG) • 3P reserves of 2.4 Tcf ~A$156 Million • 2P reserves of 549Bcf (approx. ½ of 1Tcf) • Appro

  17. Slide 17: Golden Horde Team

    Golden Horde Team For personal use only Name Summary of experience Colin Goodall • Ex-senior executive in BP, reporting to the MD and ex-head of BP in Chairman Russia • Chairman of Dana Petroleum PLC through to its ~US$4 billion acquisition by Korea National Oil Corporation (KNOC) • Chairman of a nu

  18. Slide 18: What is Coal Seam Gas (CBM)

    What is Coal Seam Gas (CBM) For personal use only  CBM is normal natural gas (methane – CH4) – which is stored in coal seams rather than sandstone formations  Its production basically just involves drilling to access the coal-seams – it involves no chemical or other reactive process  It is a larg