Slide 1: Amulsar Gold Project
TSX: LYD Amulsar Gold Project October 2017
Slide 2: Cautionary Statements
CAUTIONARY STATEMENTS Forward Looking Information & Estimates of Reserves and Resources Certain information contained in this presentation, including any information relating to Amulsar's expected future performance, is "forward looking". All statements in this presentation, other than statements of
Slide 3: Your Safety
YOUR SAFETY LYDIAN INTERNATIONAL
Slide 4: Health & Safety
Health & Safety Safety Share • Unfamiliar environments o City – traffic and walkway hazards o Site – active construction environment o Fatigue factor • Open for discussion 4 TSX: LYD
Slide 5: Safety Highlights
Safety Highlights Please have a Safe and Informative Site Tour • All visitors must complete the Amulsar safety induction – This will be completed prior to accessing active construction areas at Amulsar • Always – o Stay with your guide o Follow instructions o Wear your PPE Hard hat Safety glasse
Slide 6: Introductions and Overview
INTRODUCTIONS AND OVERVIEW 6
Slide 7: Health & Safety
Health & Safety Targets: Zero LTI and Continuous Improvement in Safety Culture • Organizational priority o International standards framework o Board-level oversight through Sustainability Committee o Occupational Health and Safety Policy adopted • Comprehensive company-wide H&S plan o Risk assessmen
Slide 8: Health & Safety: Safety Statistics
Health & Safety Safety Statistics: Through August 2017 8 TSX: LYD
Slide 9: Amulsar Gold Project: Compelling Development Asset Under Construction
Amulsar Gold Project Compelling Development Asset Under Construction Re-Rating Opportunity as Construction Milestones De-risk Project Large Scale Operation Low Cost, High Cashflow Average Annual Production All-in Sustaining Costs 225,000 Gold Ozs $579/oz 100% Owned Upside Potential Financed and Perm
Slide 10: Lydian International: Trading and Capital Structure
Lydian International Trading and Capital Structure Capital Structure Ordinary Shares LYD Trading Symbols Publicly-traded Warrants LYD.WT Ordinary Shares 699,449,253 Shares Publicly-traded Warrants 99,187,500 Outstanding Unlisted Warrants 5,000,000 Market C$245 Million Capitalization Recent Share Pri
Slide 11: Strong Financial Backing and Analyst Support
Lydian International Strong Financial Backing and Analyst Support Key Shareholders Analyst Coverage Resource Capital Fund BMO Andrew Breichmanas Orion Mine Finance Management I Limited GMP David Stewart European Bank for Reconstruction & Development National Bank Shane Nagle Franklin Resources, Inc.
Slide 12: Amulsar: Site Plan
Amulsar: Site Plan Conventional Open-Pit Mining & Heap Leach Processing Truck Shop Mine Pits Crushing Up to 2,975m Overland Conveyor 2,600m Truck Loadout 1,850m ADR Plant 1,630m Access Road 12 TSX: LYD
Slide 13: Amulsar: Project Profile
Amulsar: Project Profile Quick Reference Guide Technical Report Highlights1 Initial Mine Life 10 Years Annual Tonnes Processed 10.2 MTPA Waste : Ore Ratio 2.2 : 1.0 Gold Grade 0.79 g/t Gold Recovery 87% Annual Gold Production Years 1 - 5 260,000 Ozs Average 225,000 Ozs All-in Sustaining Costs ($/oz)
Slide 14: Amulsar: Financing Plan
Amulsar: Financing Plan Quick Reference Guide Project & Corporate Funding Sources Equity RCF/Orion $80 Million Public Offering $29 Million EBRD $9 Million $118 Million Term Loans Orion/RCF $160 Million Equipment Financing, from $90 Million ING Caterpillar Ameriabank $250 Million Capped Stream Orion
Slide 15: Amulsar: Economic Profile
Amulsar: Economic Profile Powerful Economics from Initial 10-Year Life; Open Potential Low-Cost Drivers Economics at $1,250 Gold Efficiencies from Large Scale Operations Initial Capex 1 $370 Million All Oxides Produce 87% Gold Recovery All-in Sustaining Costs 1 $579 / Gold Oz Conventional Mining & P
Slide 16: Corporate Strategy for Growth
Corporate Strategy for Growth Potential from Existing Resources & Future Exploration Gold Mineral Resources Outside Current 10-Year Mine Plan Tonnes Gold Grade Contained (000s) (g/t) Gold (Koz) Measured and Indicated 39,549 0.68 864 Inferred 72,200 0.55 1,280 Target 48 Mt at Reserve Grade Adds 1,000
Slide 17: Sustainability
SUSTAINABILITY LYDIAN INTERNATIONAL
Slide 18: Sustainability: Philosophy and Framework
Sustainability Philosophy and Framework • International standards drive organizational performance o EBRD performance requirements o IFC performance standards • Volunteer initiatives o International cyanide management code o Volunteer Principles on Security and Human Rights • Strong leadership and i
Slide 19: Sustainability: Environmental and Social
Sustainability Environmental and Social • Environmental studies conducted since 2008 • More than USD 6 million has been spent so far also engaging Armenian and international organizations • For example: RA NAS Institute of Botany, RA NAS Scientific Center of Zoology and Hydro- ecology, Wardell Armst
Slide 20: Sustainability: Impact Assessment
Sustainability Impact Assessment • Environmental Impact • Environmental and Social Impact Assessment (“EIA”) – Armenia Assessment (“ESIA”) – o Initial approval – November International 2014 o Prepared by independent o Updated – May 2016 international consultants o 15 public hearings o Approved and d
Slide 21: Biodiversity Management
Sustainability Biodiversity Management BIODIVERSITY MANAGEMENT IS PERFORMED ON NO NET LOSS or NET GAIN BASIS • Avoidance • Mitigation (translocation, restoration) • Offset 21 TSX: LYD
Slide 22: Biodiversity Management
Sustainability Biodiversity Management • The Company discovered Potentilla porphyantha on Amulsar in 2012 • Listed in the Armenian Red Book, although Amulsar is not mentioned as a habitat • Program includes translocation o One part to another region of Amulsar o The other part to Sevan Botanical Gar
Slide 23: Biodiversity Management
Sustainability Biodiversity Management • Establishment of Jermuk National Park has been stipulated by the Republic of Armenia Government Strategy for Development of Specially Protected Nature Areas • Duration of the Project – 2017-2021 • Government Decree on biodiversity strategy • MoU signed with t
Slide 24: Sustainability: Security
Sustainability Security • Developed a Security Management Plan o Incorporate all Security Standard Operating Procedures o Include gold room and operational security risks • Commitment to follow: o Volunteer Principles on Security and Human Rights o IFC PS4 • Extensive trainings o Covered 9 modules (
Slide 25: Independent Advisory Panel
Sustainability Independent Advisory Panel John Harker (Chair) Hayk Akarmazian • Former President of Cape Breton University; • Dean of Faculty of International Students, former Chair of the Cerrejon coal project review State Engineering University of Armenia panel (Anglo American, BHP Billiton, Xstra
Slide 26: Extractive Industries Transparency Initiative
Sustainability Extractive Industries Transparency Initiative • In 2015, announcement was made by the Prime Minister • National Champion appointed – Minister of Justice • In 2016 Multi Stakeholder Group (“MSG”) Formed o Government – 6 representatives o Civil Society Organizations – 5 representatives
Slide 27: Social Programs
Sustainability Social Programs – More than 90 Community Programs • Benefitting regional communities of Jermuk, Gndevaz, Gorayk, and Seravan o Started in 2007 – focus to secure social license o Invested $3 million to date o 2016 strategy going forward – switching from what’s good for community to wha
Slide 28: Local Employment Plan & Local Procurement Plan
Sustainability Local Employment Plan & Local Procurement Plan • LEP o Local employment averages 44% from October Monthly Job Statistics 2016 – August 2017 o Over 1,300 total employed in August 2017 1119 1318 940 728 575 457 325 389 306 255 363 • LPP o Local procurement procedures & SOP’s developed –
Slide 29: Livelihood Restoration Plan
Sustainability Livelihood Restoration Plan • Progress to date o Land acquisition completed, with no expropriation o A 3-year commitment for LRP programs (2016-2019) o LRP will be monitored annually: budget tracked separately from social programs o M&E Report on LRP for 2016/17 compiled in April • LR
Slide 30: Armenia Overview
ARMENIA OVERVIEW LYDIAN INTERNATIONAL
Slide 31: Armenia: Geography & People
Armenia: Geography & People Small, Inland Nation with Well-Educated Society Area 29,743 sq km Geographic Coordinates 40 00 N, 45 00 E Elevation - Armenia Low 400 m High 4,090 m Mean 1,792 m Elevation - Amulsar Low 1,630 m High 2,980 m Population 3.0 million Median Age 34.6 years Literacy Rate 99.7%
Slide 32: Armenia: Climate
Armenia: Climate Jermuk: Moderate Temperatures and Precipitation 25 120 105 20 90 15 75 10 60 5 45 0 30 -5 15 -10 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Precip. mm Poly. (Average Temp. C°) 32 TSX: LYD
Slide 33: Armenia: Economy
Armenia: Economy Stable-Trending Indicators 2014 2015 2016 Gross Domestic Product USD Billions $ 11.60 $ 10.50 $ 10.60 Foreign Direct Investment USD Billions $ 0.40 $ 0.18 $ 0.34 Foreign Currency USD:AMD 415.92 477.92 480.49 Inflation Percent 3.0% 3.7% -1.3% Unemployment Percent 17.6% 17.0% 16.8% GD
Slide 34: Armenia: Government Structure
Armenia: Government Structure 2015 Referendum Revised to Parliamentary Republic Authority Position Incumbent Since Next Election Head of State President Serzh Sargsyan Apr-08 Feb-18 Head of Government Prime Minister Karen Karapetyan Sep-16 N/A Legislative Power National Assembly 131 Deputies May-17
Slide 35: Armenia: Government Structure
Armenia: Government Structure Ministries Reflect Traditional Roles and Government Priorities Minister Minister Int'l Economic Integration and Reforms (and Vice PM) Vache Gabrielyan Finance Vardan Aramyan Agriculture Ignati Araqelyan Foreign Affairs Edward Nalbandian Culture Armen Amiryan Healthcare
Slide 36: Armenia: International Participant
Armenia: International Participant Initiating Reform by Aligning with Best International Practices Participation Comments Representative Democracy - Since 1991 Adopted upon independence in 1991; a 2015 referendum modified from a presidential system to a parliamentary system. Mining Code Revised - 20
Slide 37: Armenia: Mining
Armenia: Mining Mining in Armenia Base Metals (Metric Tonnes) 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 - 2012 2013 2014 Copper Molybdenum Zinc Precious Metals (Ounces) 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 - 2012 2013 2014 Gold Silver 37 Source: USGS 2014 Min
Slide 38: Armenia: Mining
Armenia: Mining Amulsar & Other Mining Investment Viewed as Positive Amulsar Gold Mine Other Mining Developments • Job Creation • Teghout Copper & Moly mine o Construction – 1,300 direct jobs o Owned by Vallex Group o Operations – 700 direct jobs o $320 million investment in 2014 • Foreign Direct In
Slide 39: Armenia: Fiscal Regime
Armenia: Fiscal Regime Royalties and Profits Tax • Royalties Example o Two components Gross revenue $ 1,250 4% on revenue Costs 12.5% on pre-tax profit (similar Operating costs (500) to EBIT) Depreciation (100) Other (100) Profit before tax 550 • Profits tax Armenian Royalties o 20% on taxable i
Slide 40: Armenia: Fiscal Regime
Armenia: Fiscal Regime Value Added Tax • Generally 20%, subject to o Refundable upon export of doré o General VAT deferrals on imported goods 1-year: goods less than AMD 70 million 2-years: goods greater than AMD 70 million 3-years: goods greater than AMD 300 million o Investment projects rece
Slide 41: Geology & Exploration
GEOLOGY & EXPLORATION LYDIAN INTERNATIONAL
Slide 42: Regional Geology
Regional Geology Tethyan Belt: Prominent Geologic Structure in Armenia • Armenia lies along the central segment of the Tethyan Metallogenic Belt • Major deposit characteristics of this region include: o Porphyry copper and copper-gold deposits o Epithermal gold-silver type deposits 42 TSX: LYD
Slide 43: Regional Geology
Regional Geology Amulsar Location • Upper Eocene – Lower Oligocene calc-alkaline magmatic arc system extending NW through Georgia/Turkey and SE into Iran 43 TSX: LYD
Slide 44: Amulsar Geology
Amulsar Geology Deposit Type and Mineralization • Host sequence o Eocene-Oligocene volcanic and volcano-sediments o Basaltic and dacitic composition • Rock units o Upper Volcanics (“UV”) Silicified – Mineralization hosted in hematite coated fractures o Lower Volcanics (“LV”) Argillic porphyritic
Slide 45: Amulsar Geology: Surface Geology Map
Amulsar Geology Surface Geology Map 45 TSX: LYD
Slide 46: Amulsar Geology: Cross Sections
Amulsar Geology Cross Section through Erato-Tigranes and Artavazdes-Arshak A – A’ Cross section through Erato-Tigranes B – B’ Cross section through Artavazdes-Arshak 46 TSX: LYD
Slide 47: Amulsar Geology: Types of Structures
Amulsar Geology Types of Structures • Structural formation o Central, high-complexity within a regionally simple structure o Different sets of structures produce final geometry – shears, folds, and faults o Main post-mineralization structures are NE-trending faults o High mineralization is controlle
Slide 48: Amulsar Exploration
Amulsar Exploration Lydian Discovery: 127,000 Metres Drilled since 2007 Diamond RC Totals Drilling Holes 494 597 1,091 total holes Metres 2007 593 - 2008 2,680 10,363 2009 1,090 12,446 2010 7,887 17,036 2011 15,028 23,099 2012 13,838 6,720 2013 1,754 5,258 2014 - - 2015 - - 2016 3,217 6,162 46,087 8
Slide 49: Amulsar Exploration
Amulsar Exploration Consistently Increasing M+I; Large Inferred Conversion Potential • Current Mineral Resources and Mineral Reserves Contained Tonnes Grade Gold Ozs (millions) (g/t) (millions) Mineral Resources Measured + Indicated 142.2 0.76 3.5 Inferred 72.2 0.55 1.3 Mineral Reserves (P+P) 102.65
Slide 50: Strategy for Growth
Strategy for Growth Current Resources Limited by Drilling – Open at Depth/Laterally Drilling Outside Current 10-Year Pit Boundaries Mineral Resources Outside Current 10-Year Pit Boundaries RED Measured + Indicated BLUE Inferred 50 TSX: LYD
Slide 51: Erato Illustrative Cross-section
Strategy for Growth Erato Illustrative Cross-section 51 TSX: LYD
Slide 52: Tigranes Illustrative Cross-section
Strategy for Growth Tigranes Illustrative Cross-section 52 TSX: LYD
Slide 53: Extended Upside through Exploration at Depth & Laterally
Strategy for Growth Extended Upside through Exploration at Depth & Laterally 0 500m Resistivity Red – High Blue - Low 53 TSX: LYD
Slide 54: Amulsar Mining
AMULSAR MINING LYDIAN INTERNATIONAL
Slide 55: Amulsar Mining
Amulsar Mining Conventional Mining Method and Equipment • Open pit mining o 10 metre benches; variable pit slopes o Drill and blast o Caterpillar fleet Initial Sustaining Shovels: Cat 6040 1 1 Loaders: Cat 994 1 1* Haul trucks: Cat 789D 12 7 Cat 6040 Shovel – 22 m3 bucket * Rent during peak mining p
Slide 56: Amulsar Mining: Preproduction Activities
Amulsar Mining Preproduction Activities • Main Haul Road o From pits to ROM stockpile and BRSF o 1.4 million m3 cut, mostly usable for construction fill • Tigranes-Artavazdes Temp Haul Road o Initial mining access to T-A pits o 0.5 million m3 cut • BRSF initial phase • Mine Facilities o Truck shop a
Slide 57: Amulsar Mining
Amulsar Mining Delivers Higher Grade Ore for Processing in Years 1 – 5 • Minimal pre-production mining o 3-months prior to operations o 1.3 million tonnes Ore – 420,000 tonnes Waste – 849,000 tonnes Mine Production Schedule (000s Tonnes) • Average 10.2 MTPA 30,000 • Stockpile early lower grades;
Slide 58: Amulsar Mining: ADR Management
Amulsar Mining ADR Management: PAG LV Encapsulated within NAG UV 58 TSX: LYD
Slide 59: Amulsar Processing
AMULSAR PROCESSING LYDIAN INTERNATIONAL
Slide 60: Amulsar Processing
Amulsar Processing Conventional Processes and Equipment Barren Rock Storage Open-Pit Mining • 2.2 Waste : Ore Ratio • Initial 10-Year Mine Life • Seek expansion from existing add’l resources • Open at depth/laterally Crushing & Screening • 2-Stage crushing • Nominal 10.4 MTPA Overland Conveyor • Up
Slide 61: Amulsar Processing: Ore Characteristics
Amulsar Processing Ore Characteristics • Crushing properties o Crushing Work Index (kW- hr/tonne) Tigranes/Artavazdes: 8.3 Erato 13.2 o Abrasion Index (overall average) 0.35 • Low fines and clay content in ore • Low toxic metals content • Low cyanide and lime consumption o Cyanide: 0.10 kg/t o
Slide 62: Amulsar Processing: Excellent Leach Recoveries
Amulsar Processing Excellent Leach Recoveries Cold Climate Column Leach Testing • High recovery and rapid leaching 100% 90% o Column tests consistently average 80% > 90% recovery 70% 3°C column test o Averaged 75% in 10 days 60% 50% 40% • Modeling assumptions 30% 20% o Crush size: 19mm 10% o Leach t
Slide 63: Simple Metallurgical Process
Amulsar Processing Simple Metallurgical Process 63 TSX: LYD
Slide 64: Conventional Sandvik 2-Stage Crushing & Screening Plant
Amulsar Processing Conventional Sandvik 2-Stage Crushing & Screening Plant Primary Stockpile Primary Crusher Secondary Crusher Overland Drive Station Screen House 64 TSX: LYD
Slide 65: Sandvik Overland Conveyor System
Amulsar Processing Sandvik Overland Conveyor System Overland Conveyor Fine Ore Stockpile 65 TSX: LYD
Slide 66: Loadout Area for Truck Stacking
Amulsar Processing Loadout Area for Truck Stacking 66 TSX: LYD
Slide 67: Dual Bins to Meet Stacking Rate
Amulsar Processing Dual Bins to Meet Stacking Rate Shuttle Stockpile Conveyor Bins/Clamshells Trucks to Heap Leach 67 TSX: LYD
Slide 68: Valley Fill Heap Leach
Amulsar Processing Valley Fill Heap Leach 68 TSX: LYD
Slide 69: ADR Plant Uses Proven Recovery Principles
Amulsar Processing ADR Plant Uses Proven Recovery Principles ADR Building Laboratory Cyanide Mixing Refinery/Gold Room Warehouse 69 TSX: LYD
Slide 70: Thank You
LYDIAN a INTERNATIONAL TSX: LYD 70
Slide 71: Appendix
APPENDIX LYDIAN INTERNATIONAL
Slide 72: Board of Directors
BOARD OF DIRECTORS Development Oriented – Independent, Diverse Experience Gordon Wylie, Non-Executive Director & Chair 32 years mining experience; AngloGold-Ashanti Global, Exploration manager Howard Stevenson, President & CEO 25 years global mining experience; former President & COO of Alacer Gold;
Slide 73: Board of Directors (continued)
BOARD OF DIRECTORS (continued) Development Oriented – Independent, Diverse Experience Steve Altmann, Non-Executive Director Managing Director at Morrison Park; former Head of Mining at Desjardins; banking and corporate experience Josh Parrill, Non-Executive Director Resource Capital Funds; formerly
Slide 74: Management
MANAGEMENT Experienced, Committed to Construction Excellence Howard Stevenson, Hayk Aloyan, M.D. – Lydian Armenia President & CEO • 20 years mineral exploration and • 25 years global mining management experience experience • Armenian metallogenesis and • Alacer Gold President & COO resource speciali
Slide 75: Large Scale Oxide Deposit: Mineral Resource Statement
LARGE SCALE OXIDE DEPOSIT Upside Potential from Inferred Resources Mineral Resource Statement AMC Consultants (UK) Limited - February 27, 2017 Quantity Gold Contained Silver Contained Classification Tonnes Grade Gold Grade Silver (000s) (g/t) (Koz) (g/t) (Koz) Measured 51,500 0.83 1,370 4.7 7,700 In
Slide 76: Large Scale Oxide Deposit: Mineral Reserve Statement
LARGE SCALE OXIDE DEPOSIT Initial 10-Year Mine Plan from 2.6 MM Oz P+P Reserves Mineral Reserve Statement (0.24 g/t gold cutoff) Mine Development Associates, February 27, 2017 Quantity Gold Contained Silver Contained Classification Tonnes Grade Gold Grade Silver (000s) (g/t) (Koz) (g/t) (Koz) Proven