  1. Slide 1: The Nebius Way

    The Nebius Way • We engage transparently and early as Nebius because we are the end user. • We deploy efficient closed-loop cooling systems to minimize water consumption • We proactively minimize noise impact during construction and operation • We pay our full cost of power • We create jobs, grow lo

  2. Slide 2: Initial Project Details

    Initial Project Details • Location: ~600 acres in Highridge Business Park • Power: 1.2 GW grid power with PPL. Nebius pays full cost of power. • Water: Closed loop water cooling system to minimize use. • Noise: Design efforts to minimize noise, including sound walls, machine placement, and topograph

  3. Slide 3: Being a Good Neighbor

    Being a Good Neighbor Nebius believes in being a good neighbor and investing in the communities it calls home. From education to workforce development, we listen to the needs of the community and develop a Community Benefits Plan that reflects our commitment. A Community Benefits Plan for Butler Tow

  4. Slide 4: Draft Site Concept as of April 2026. Not final. Subject to change.