Slide 1: The Providence Gold Mines
THE PROVIDENCE GOLD MINES A past-producing property in the California “Mother Lode” District

Slide 2: Disclaimer
DISCLAIMER The data contained herein is provided for information purposes only. Certain information has been compiled from sources believed to be reliable. No information in this presentation is to be construed as an offer to buy or sell securities. Some statements contained in this presentation are

Slide 3: Location
LOCATION • Located in Summerville Mining District, Tuolumne County, California, in eastern belt of the “Mother Lode” District • Providence Mines Property consists of 6 patented mineral claims and 22 located claims, which include the Providence, Consuelo, and Goodenough Mines • All claims held 100% b

Slide 4: Mother Lode District Gold Belt
MOTHER LODE DISTRICT GOLD BELT

Slide 5: Historic Production from Eastern Belt
HISTORIC PRODUCTION FROM EASTERN BELT EAST BELT PRODUCED* Buchanan Mine 500 feet 225,000 oz./au Soulsby Mine 700 feet 400,000 oz./au Confidence Mine 1400 feet 350,000 oz./au Black Oak Mine 2000 feet 200,000 oz./au United Mines (Dead 2100 feet 575,000 oz./au Horse/New Albany) Carson Hill Mine 3000 fe

Slide 6: Historic Production from Western Belt
HISTORIC PRODUCTION FROM WESTERN BELT WEST BELT PRODUCED* Keystone Mine** 2600 feet 1,200,000 oz./au Central Eureka Mine 4855 feet 1,800,000 oz./au Argonaut Mine 5570 feet 1,000,000 oz./au Kennedy Mine 5912 feet 1,500,000 oz./au *MILL RECOVERIES AT THE TIME WERE NOT TO TODAY’S STANDARDS ** KEYSTONE

Slide 7: History
HISTORY • 1894 – Providence mine opened • 1916 – Shut down in the midst of active and profitable operations & lower four levels allowed to flood. Lower levels never reopened • 1918 – Forest fire destroyed the surface workings of Providence Mine and Mill as well as all operation records • UNTOUCHED F

Slide 8: Development
DEVELOPMENT • Double compartment shaft sunk to 1470 feet with12 drifts at different levels • Crosscuts run east or west to develop and mine parallel mineralized shoots in parallel veins • Mineralization reported to still be in place in many mineralized shoots • Underground work thoroughly developed

Slide 9: Providence Shafts & Levels
PROVIDENCE SHAFTS & LEVELS meer nes LONGITUDINAL SECTION ON VEIN | LAD / li ate oe / XN j YI PROPOSED WORK \/ 9 | ! ; PROVIDENCE CONSOLIPATED MINES | pap i j $j a coutry jensronmin it | : | / ] Sou } EXICAN MSCARTHY | S ! | | | eset j : | : ORE } | ORE : : Ok | i ! | / SHOOT | t SHOOT. } 1 | | | : :

Slide 10: Past Production
PAST PRODUCTION • 225,000 oz. gold recovered from 1894 to 1916 • Single chambers in mine reportedly produced up to 30,000 oz. of gold grading 0.5 - 0.8 oz. per ton

Slide 11: Potential at Depth
POTENTIAL AT DEPTH • To date just one major mineralized stope has been reported to have been mined and only to 1,100 ft. depth, other stopes have only been mined near surface 100 to 200 ft. • Motherlode District Deposits are historically very deep, easily traced down dip to 3,000-5,000 ft. • The for

Slide 12: Option Terms
OPTION TERMS • Initial: US$25,000 • Work Commitments: • C$250,000 Year 1 • C$750,000 Year 2 • C$1 million Year 3 • Earns 50% • 2.5% Royalty, buyout to 1% for US $1 million • Buyout remaining 50% for US $5 million

Slide 13: Proposed Work Program
PROPOSED WORK PROGRAM —_

Slide 14: 2016 picture of stope within the underground
2016 picture of stope within the underground

Slide 15: Phase 1
PHASE 1 • Geological mapping and channel sampling of viens on surface and underground. • Develop a structural model and controls for location of various discovered and undiscovered mineral shoots. • Phase 1 will cost approximately C$260,000

Slide 16: Phase 2
PHASE 2 • Core drilling, dewatering and reclamation of mine. • Phase 2 will cost approximately C$775,000

Slide 17: Phase 3
PHASE 3 • Reclaim underground workings • Rehabilitate inclined shaft ? • Sample the underground workings with both channel sampling and underground drilling • Phase 3 will cost in excess of C$1,000,000

Slide 18: Permitting
PERMITTING Permitting a gold mine in California is a process, however, factors on the following slide give the Providence Mines an advantage:

Slide 19: Providence Permitting Advantages
PROVIDENCE PERMITTING ADVANTAGES • Only use land has ever had = Producing gold mine • Project is relatively remote from nearby population • Aggregate mine (Old Carson Hill Gold Mine) in operation 10 miles away, (can be seen from the Highway) permitted until 2030 • Nearest towns, Tuolumne, and Sonora

Slide 20: Qualified Person
QUALIFIED PERSON • John M. Kowalchuk, P.Geo, a geologist and qualified person (as defined under NI 43-101) has read and approved the technical information contained in this presentation.

Slide 21: Historical Providence Mine 1916
HISTORICAL PROVIDENCE MINE 1916

Slide 22: The Company believes modern methods give Providence Gold Mines potential to be a significant producer
The Company believes that by using modern exploration and extraction methods the Providence Gold Mines has potential to once again become a significant producer
Source: Internet Archive copy of providencegold.com
More decks from Providence Gold Mines Inc
Investor Presentation (December 2022)25 slides · December 2022
Investor Presentation (November 2022)25 slides · November 2022
Investor Presentation (August 2022)25 slides · August 2022
Investor Presentation (March 2022)26 slides · March 2022
Investor Presentation (November 2021)26 slides · November 2021