  1. Slide 1: Limon Mine Presentation June 2010

    Limon Mine Presentation June 2010 12 1

  2. Slide 2: B2Gold / Minera Triton

    B2Gold / Minera Triton és VRIVOS MINT VS. ¥ Ver el LS Ieclr RN Tnyerdmos en Nicaragna, BeGOLD por gue creemos en ella

  3. Slide 3: Location

    Location Limon Mine 100 km Mexico Belize Caribbean Sea Nicaragua Guatemala Honduras Pan American El Salvador Nicaragua Highway Limon Mine Pacific Ocean Managua Costa Rica Panama Lago de 1000 km Nicaragua 3

  4. Slide 4: Limon Mine

    Limon Mine CURRENT OPERATIONS  In continuous operations since 1941 – over 3.0 million ounces of production  Underground and open pit mechanized mine operation  Based on average of 1,000 tonnes per day at an average grade of 4.78 g/t gold FUTURE OPPORTUNITIES  Drilling to increase reserve and res

  5. Slide 5: Historic Production

    > Historic Production 8.000 E 620,000 & \ / Limén Area, Nicaragua - f / Property Geology Limén Concession f f 7 | : Ki; Limon Talavera 1, ‘ yates IAG a 0m oz = | SF Mill a rs o a ee / 1,408,000 N Legend | | =) = —, Trt 0 $ lo 1s 0 Kiloasctres ae Santa Pancha 71.2 m oz BeGOL_LD

  6. Slide 6: Site Map

    Site Map Helipad Tajo Sur Pit Santa Pancha U/G Talavera U/G Santa Rosa TSF 6

  7. Slide 7: The Team

    = 6 o Ee o = = BeGOL_LD

  8. Slide 8: Safety at Limon

    Safety at Limon  Frequency Index YTD-2010 is 9.9  Efforts to meet North American mining safety standards (MASHA)  Permanent training to all workers (Five minutes safety talks)  Active work led by Safety Committee composed by company staff and workers representatives. 8

  9. Slide 9: Santa Pancha UG Mine

    Santa Pancha UG Mine PITSTA PANCHA, LOOKING TO SOUTH WEST BeGOL_LD

  10. Slide 10: Open Pits

    Open Pits  Close to surface  Low cost  27% of ore supply  25K oz reserves  Mining contractor 10

  11. Slide 11: Triton Reserves / Resources as at December 31, 2009

    Triton Reserves / Resources as at December 31, 2009 MINERAL RESERVES Contained Zone Tonnes Gold Grade (g/t) Gold Ounces LIMON (1) Proven 306,933 4.80 47,402 Probable 659,206 4.49 95,232 Total 966,139 4.59 142,634 MEASURED AND INDICATED MINERAL RESOURCES (EXCLUDES MINERAL RESERVES) Contained Zone Ton

  12. Slide 12: El Limon Objectives

    El Limon Objectives  Labor relations  Keep working with three unions and government authorities for operating stability.  All negotiations with participation of all involved parties. Communication.  Hot water below the underground workings  Dewatering effort below the active mining areas  Incr

  13. Slide 13: Santa Pancha Potential Expansion

    Santa Pancha Potential Expansion 13

  14. Slide 14: Underground Mining

    Underground Mining Extending the life of mine… Upgrade drainage for mine deepening New equipment Ventilation: a constant challenge 14

  15. Slide 15: Open Pits

    Open Pits Develop all the potential… 15

  16. Slide 16: Plant Upgrade

    Plant Upgrade  SAG mill gear reversal in June 2009  Purchasing plan of spare for key components  Increase process plant useful life  Result is increased plant availability 16

  17. Slide 17: Tailings Dam Expansion (Santa Rosa)

    Tailings Dam Expansion (Santa Rosa)  Increased existing tailings storage capacity by two and a half years  Located upstream from existing pond  Result is being able to postpone new tailings dam construction until Q1 2011  Phase 2 Completed in mid April 2010  US$530K investment  Next: San Jose

  18. Slide 18: Community Projects

    Community Projects  Agua por Vida – includes new pumps, replacement of 10 km distribution line, and distribution in the town of Limon. This project was completed in 2009 (from 2008 budget of $250,000)  Transferred the titles for 88 homes to the workers of Limon  Donated 50,000 school books to sch

  19. Slide 19: Community Projects

    Community Projects  Kindergarten– First kindergarten in Rincon Garcia, Chinandega; a community located at 25 km from Limon. Project executed in agreement with local community. Eighty children will benefit from the project.  Medical care - B2Gold provides medical care to urgent patients and people

  20. Slide 20: Community Projects

    Community Projects  TODOS CON VOS PROGRAM– Government initiative to provide medical assistance to people with special needs. .  TODOS CON VOS PROGRAM– B2Gold provided logistic support to Cuban-Nicaraguan Medical Brigades in all Leon municipalities. . 20

  21. Slide 21: El Limon Social Responsibilities

    El Limon  Social Responsibilities 21

  22. Slide 22: El Limon Environment Day

    El Limon >» Environment Day se ys = = @ gh z= eS rer ‘l) \ ihe | ze IONAL = BieN

  23. Slide 23: Contribution to the Economy from Limon

    Contribution to the Economy from Limon  Community Support Budget  In 2009 B2Gold contributed US$721,500  In 2010 B2Gold has budgeted US$1,610,000 (50% funded by B2Gold)  Contribution to the Economy  In 2009, B2Gold injected in to the national economy US$11.8M which is equivalent to C$250,000,00

  24. Slide 24: El Limon Mine

    El Limon Mine 24