    DISCLAIMER This presentation is provided on a confidential basis. The name 'Presenter' refers to Pan African Resources PLC and its advisors, subsidiaries or affiliated companies. This presentation has not been filed, lodged, registered or approved in any jurisdiction and recipients of this document

  3. Slide 3: Overview of Presentation

    OVERVIEW OF PRESENTATION • Overview and history of Barberton Mines • Current mining methods • Further exploration potential 3

  4. Slide 4: Overview of Barberton Gold Mines

    OVERVIEW OF BARBERTON GOLD MINES

  5. Slide 5: Overview of Barberton Mines ('BML')

    OVERVIEW OF BARBERTON MINES (‘BML’) • Mining started in 1886 at Sheba Mines – oldest operating mine • Currently BML have three operations i.e. Sheba, New Consort and Fairview • BML treat about 24 000 ore tons per month at about 11g/t • BML also have a Tailings Retreatment Plant (90,000t/m) • Combine

  6. Slide 6: Locality of Barberton Mines

    LOCALITY OF BARBERTON MINES 6

  7. Slide 7: Start of the Golden Quarry - Sheba

    START OF THE GOLDEN QUARRY - SHEBA This is where it all started. After this discovery a company was floated and the first shares were sold at £1 and it increased to £120 7

  8. Slide 8: Edwin Bray Adit at Sheba Mine

    EDWIN BRAY ADIT AT SHEBA MINE Edwin Bray Adit when it started – Oldest photo of this adit available 8

  9. Slide 9: Edwin Bray Adit in Progress

    EDWIN BRAY ADIT IN PROGRESS 1 ee za 5 + TOT lf

  10. Slide 10: Edwin Bray Adit in Production

    EDWIN BRAY ADIT IN PRODUCTION 10

  11. Slide 11: Edwin Bray Adit Still in Use

    EDWIN BRAY ADIT STILL IN USE 11

  12. Slide 12: Edwin Bray Adit Still in Use

    EDWIN BRAY ADIT STILL IN USE Edwin Bray Adit still in use – 127 years later 12

  13. Slide 13: Sheba Mine - ZK Vertical Shaft

    SHEBA MINE - ZK VERTICAL SHAFT Sheba Mine – SK vertical shaft – Today (110 years old) 13

  14. Slide 14: Fairview Mine Stamp Mill

    FAIRVIEW MINE STAMP MILL Very early days of Fairview, on top of the mountain 14

  15. Slide 15: Fairview – Main Adit

    FAIRVIEW – MAIN ADIT Fairview Main Adit being used today 15

  16. Slide 16: New Consort – 1 Level

    NEW CONSORT – 1 LEVEL Early days at New Consort No1 level entrance 16

  17. Slide 17: New Consort - Main Adit

    NEW CONSORT - MAIN ADIT New Consort Main Adit today ± 60 years old 17

  18. Slide 18: BIOX Plant

    Ba he La BlOXe PLANT BIOXe Plant

  19. Slide 19: Barberton Tailings Retreatment Plant – 'BTRP'

    BARBERTON TAILINGS RETREATMENT PLANT – ‘BTRP’ BTRP 19

  20. Slide 20: Current Mining Methods

    CURRENT MINING METHODS

  21. Slide 21: Current Mining Methods

    CURRENT MINING METHODS • Mechanised Mining – Cut and fill (90%) Breast & Updip • Open Stoping – Conventional Mining (10%) • Shrinkage Mining (0%) 21

  22. Slide 22: Current Mining Method

    CURRENT MINING METHOD • Mechanised Mining – Cut and fill (90%)  Waste from your infrastructure development is hauled back into stope for fill (Ramp system and Access cross cut which is then fan lifted)  55% of reef tons removed equates to waste tonnage requirement for waste fill (Development meter

  23. Slide 23: Current Mining Method

    CURRENT MINING METHOD Simplified section view of stoping/mining layout 23

  24. Slide 24: Current Mining Method

    2 CURRENT MINING METHOD Simplified plan view of stoping/mining layout 24

  25. Slide 25: Current Mining Method

    2 CURRENT MINING METHOD Close up section of floor support in 1st cut 25

  26. Slide 26: Current Mining Method

    2 CURRENT MINING METHOD Close up section of floor support in 1st cut 26

  27. Slide 27: Current Mining Method

    2 CURRENT MINING METHOD Close up plan view of floor support in 1st cut 27

  28. Slide 28: Current Mining Method

    2 CURRENT MINING METHOD Close up plan view of floor support in 1st cut 28

  29. Slide 29: Current Mining Method

    2 CURRENT MINING METHOD Close up plan view of floor support in 1st cut 29

  30. Slide 30: Current Mining Method: Stoping Cycles

    2 CURRENT MINING METHOD Stoping cycles 30

  31. Slide 31: Current Mining Method: Stoping Cycles

    2 CURRENT MINING METHOD Stoping cycles 31

  32. Slide 32: Current Mining Method

    2 CURRENT MINING METHOD Section along strike of stope showing Breast mining & Updip mining 32

  33. Slide 33: Fall of Ground Measures

    FALL OF GROUND MEASURES • Mechanised Mining – Cut and fill (90%)  Because the back areas are filled with waste the overall stability of the stopes are good  At Fairview we are mining at about 1800m below surface and have not seen any seismic related activities  Only the current stope face area is

  34. Slide 34: MRC Ore Body and Exploration Potential

    MRC ORE BODY AND EXPLORATION POTENTIAL

  35. Slide 35: Barberton Mines - Fairview

    BARBERTON MINES - FAIRVIEW • The MRC is the second richest orebody in the world • Current life of orebody is 26 years, which greatly exceeds the BML life of mine • There is a realistic potential for MRC to continue at depth 35

  36. Slide 36: The Top Highest Grade Underground Gold Operations

    BARBERTON MINES - FAIRVIEW The top 10 highest grade underground gold operations Data retrieved from the IntelligenceMine database - Published in MINING.COM on 16 July 2015 36

  37. Slide 37: The Top Highest Grade Underground Gold Operations

    BARBERTON MINES - FAIRVIEW The top 10 highest grade underground gold operations (What the table should look like in reality) 37

  38. Slide 38: MRC Orebody

    2 BARBERTON MINES - FAIRVIEW MRC Orebody 38

  39. Slide 39: MRC Orebody

    2 BARBERTON MINES - FAIRVIEW MRC Orebody 39

  40. Slide 40: Exploration Potential at BML

    BARBERTON MINES Exploration Potential at BML  Unique geology  Amira Project Study by University of Western Australia  Current UJ study 40

  41. Slide 41: Metamorphic Devolatilisation

    BARBERTON MINES Metamorphic devolatilisation  Transition from greenschist to amphibolite facies triggers process of devolatilisation  H2O-CO2-H2S fluids are released from mineral crystal structures and these fluids can transport gold to favourable depositional sites  Adequate amounts of gold can

  42. Slide 42: Metamorphic Devolatilisation

    BARBERTON MINES Metamorphic devolatilisation  At higher pressure (and T) gold solubility is higher  When pressure is released, H2S (the ligand that makes gold soluble) is driven off, resulting in gold precipitation  Pressure shadows, which can form during faulting and folding, create spaces effec

  43. Slide 43: Calculated Volume of Source Rock Required for a Deposit

    BARBERTON MINES Calculated volume of source rock required to form a deposit containing a given amount of gold Barberton Greenstone Belt contains 1600 cubic km source rock 43

  44. Slide 44: Geological Map

    BARBERTON MINES Geological map 44

  45. Slide 45: Amira Project – 3D Model

    BARBERTON MINES Amira Project – 3D model 45

  46. Slide 46: Amira Project – Including Geological Features

    BARBERTON MINES Amira Project – including geological features 46

  47. Slide 47: Amira Project – High Potential Areas

    BARBERTON MINES Amira Project – high potential areas N Large deposit Sheba Stress Fairview High Low 3 km 47

  48. Slide 48: Semi-mechanised Stoping

    BARBERTON MINES Semi-mechanised Stoping 48

  49. Slide 49: Waste Filling

    BARBERTON MINES Waste Filling 49

  50. Slide 50: Up-dip Drilling

    BARBERTON MINES Up-dip drilling 50

  51. Slide 51: Up-dip Drilling

    BARBERTON MINES Up-dip drilling 51

  52. Slide 52: Breast Mining – Waste Fill

    BARBERTON MINES Breast Mining – Waste Fill 52

  53. Slide 53: Breast – Face Drilling

    BARBERTON MINES Breast – Face Drilling 53

  54. Slide 54: Compacting – Prior to Cement Cap

    BARBERTON MINES Compacting – prior to cement cap 54

  55. Slide 55: Sweeping – Between Reef and Waste Pile

    BARBERTON MINES Sweeping – Between Reef and Waste Pile 55