Evolution Petroleum Corporation, Inc. · AMEX:EPM
Evolution Petroleum — Non-Deal Roadshow (November 2013)
31 slides from Evolution Petroleum's roadshow presentation, November 2013

Slide 1: Evolution Petroleum Corporation November 2013
NOVEMBER 2013 KKEVOLUTION Petroleum Corporation

Slide 2: Forward-looking statements and cautionary note to U.S. investors
The data contained in this presentation that are not historical facts are “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A of the Securities Act and Section 21E of the Exchange Act. Such statements may relate to capital expenditures

Slide 3: Maximizing and Producing Petroleum Resources: Building Value per Share
Maximizing and Producing Petroleum Resources 1. Applying Innovative Engineering 2. Into Known Oil & Gas Fields Building Value per 4. To Generate Share Cash for Growth & Shareholders 3. By Staff Fully Aligned with Shareholders 3

Slide 4: Management team background and achievements
Name/Title Background Achievements Robert Herlin Co-founded EPM in 2003 with $8.3 MM of common 30+ years leadership experience in CEO & Chairman equity invested during 2003-06. M&A, development, finance and B.S./M.E. Chemical Engineering – Rice University operations in public and private MBA – Harva

Slide 5: Growth, Value, Income
GROWTH Forecasted production increase at Delhi Field Addition of NGL/Methane recovery at Delhi Field Reversion of 24% WI at Delhi Field Increasing GARP® commercialization VALUE PV10 > Enterprise Value GARP proprietary patented technology No debt INCOME New $0.10 quarterly cash

Slide 6: Yield comparison versus indices
6% 5.63% 5% 3.95% 4% 3.53% 3.32% Yield 3% 2.12% 2.20% 2.13% 2% 1% 0% EPM S&P S&P 500 10-Yr FTSE S&P 500 Alerian Energy Treasury NAREIT Utilities MLP Index Index Index Index EPM yield based on share price of $12.06 as of October 31, 2013. Yields for other indices as of October 24, 2013 (Source: Bloom

Slide 7: Oil, NGL & Gas Reserves and Revenue
Oil, NGL & Gas Reserves* Revenue MMBoe $M $25,000 30 25 $20,000 20 $15,000 15 $10,000 10 5 $5,000 0 $0 PD PUD Probable Possible * Note: 2012 & 2013 reserves exclude noncore assets sold in 2013 or scheduled for monetization in 2014; 2013 reserves exclude Ms Lime. 7

Slide 8: Transformed $8.3 MM equity investment into $455 MM Proved PV10
Transformed $8.3 MM common equity cash investment into $455 MM Proved PV10 + $109 MM Probable PV10 + Working Capital* $700 $109 MM $590 MM $600 $456 MM $500 $400 $MM $300 $200 $100 $26 MM $0 Initial Investment 9/30/13 W/C Proved Probable Delhi Total (2P) -$100 * Notes: PV10 values based on reports f

Slide 9: SEC Pretax PV10 and Proved Reserves
SEC Pretax PV10* 13.8 MM BOE Proved Reserves $MM Proved Probable Possible 7% $500 $456 Oil $450 $411 NGL $400 $375 93% $350 $300 $266 $250 7.4 MMBOE Probable Reserves $200 $162 13% $150 $109 Oil 14% $100 $77 NGL $64 $50 $32 73% Gas $0 2010 2011 2012 2013 as of June 30 * Note: As of 6/30/2013 – Note

Slide 10: Delhi Field, GARP and Giddings Field
Delhi Field - Producing CO2 EOR GARP® Patented artificial lift technology 13.5 MMBO Proved 74% dev’d for horizontal and vertical wells worldwide. 7.4 MMBO Probable 48% dev’d Successfully installed in commercial JV’s 3.7 MMBO Possible 72% dev’d in Giddings. Business model of cash or risk sharing NPI

Slide 11: Foundation Asset: CO2 Enhanced Oil Recovery
Foundation Asset CO2 Enhanced Oil Recovery

Slide 12: Cash Annuity to Fund Growth and Income
“Cash Annuity” to Fund Growth and Income Jackson Dome Delhi Gross historic production 192 MMBO prior to EOR Production 7,188 gross BOPD (quarter ended 6/30/13) 6/30/2013 Reserves 10.0 MMBO Proved Developed (PV10: $380 MM) 13.5 MMBOE Proved (PV10: $455 MM) 7.4 MMBOE Probable (PV10: $109 MM) 48% dev’d

Slide 13: Royalty Interest and Reversionary Working Interest
• EPM owns 7.4% of gross revenues • No CapEx or OpEx…ever 7.4% • Exempt from state severance tax until project payout of all actual costs plus capital cost Royalty Interest • Royalty interest = 28% of EPM’s Delhi 3P reserves volumes • Delhi crude sells as LLS (current premium to WTI) • Fixed payout

Slide 14: Actual and D&M Forecast of 3P Production at Delhi
Actual and D&M Forecast of 3P Production at Delhi 100,000 Actual Gross Actual EPM Net BOPD D&M 6/30/13 Gross EPM Net D&M 6/30/13 Gross 10,000 EPM Net 24% WI Reversion 1,000 100 Jul-10 Jul-15 Jun-13 Dec-10 Aug-12 Jan-13 Nov-13 Sep-14 Dec-15 Aug-17 Jan-18 Jun-18 Nov-18 Sep-19 Oct-11 Mar-12 Mar-17 May-

Slide 15: High Probability of Achievement, Driven by Proved Reserves
High Probability of Achievement, Driven by Proved Reserves Delhi Gross Oil Production Forecast as of 6/30/2013 Possible Probable Proved Gr BOPD 10,000 24% WI Reversion 1,000 Forecasted oil production over next 12 years of 43+ year life Notes: From independent report of 6/30/2013. First 6 months of p

Slide 16: Calendar 2013 gross CapEx focused on optimizing the flood
Calendar 2013 gross CapEx of ~$49 MM focused on optimizing flood within already developed western half of field – EPM bears no share of CapEx until WI reversion Reversion of 23.9% WI & 19% RI in fiscal 2014 expected to add up to 1,500 net BOPD to EPM based on the then projected rate 6/30/2013

Slide 17: Underground fluid leak in June 2013
• Operator discovered underground fluid leak in June 2013 in portion of field. • Operator temporarily suspended CO2 injection in area of leak to lower pressure, and oil production from wells in affected area began normal decline, reducing our royalty income into 2nd quarter of fiscal 2014. • Operato

Slide 18: Cumulative Pretax NCF and Residual PV10
($000) Cumul Pretax NCF Residual PV10 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 - 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 As of 6/30 Notes: From independent report of 6/30/2013 based on SEC LLS pricing of $106/bbl. Residual PV10 is the PV10 of remaining c

Slide 19: Delhi 3P Pretax Cash Flows Net to EPM
Delhi 3P Pretax Cash Flows Net to EPM (Cal 2014-25) $000 Portion of WI that funds Capex WI net of capex Royalty 120,000 100,000 80,000 60,000 40,000 20,000 - 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Notes: From independent report of 6/30/2013. First 6 months of production reflect

Slide 20: Delhi Reserves and net CapEx
$66 MM in Delhi net CapEx in 2014-16 to grow production, cash flow & PV10 through 2017 Delhi $695 MM PDP CF* Reserves Shareholders $740 MM other 3P CF* ~$3 MM CapEx in FY14 for GARPR * Net of Delhi CapEx and before overhead charges and corporate income tax 20

Slide 21: GARP: Innovation for Increasing Recovery
Innovation for Increasing Recovery From NGS Technologies, a subsidiary of Evolution Petroleum www.garplift.com

Slide 22: GARP addresses loss of reserves in mature wells
Industry at risk of losing vast quantities of reserves and production as mature horizontal wells, vertical wells with multiple pay zones and deep vertical wells encounter liquid loading and depletion issues. These problems exist now in many areas – Giddings, Barnett, Bakken, Haynesville, Permian

Slide 23: GARP before and after
BEFORE: AFTER: GARP® Either fluid level eventually drops May add substantial new reserves to a level where rod pump or gas lift are at low cost no longer effective, or Benefit = up to 30% incremental recovery Fluid production in gas well builds and at minimal cost eventually shuts off gas pr

Slide 24: Selected Lands #2 daily rate versus cumulative production
Downtime for repairs of inherited equipment Installed GARPR Pre-GARPR Selected Lands #2 Daily Rate versus Cumulative Production 1,000 Restored production BOPD rate from marginal 1 BOPD to ~12 BOPD due to GARP® 100 GARP® targeted recapture of “Tail” 10 Production decline due to well loading up 1 0 50

Slide 25: GARP well installations and results
Well Install Pre-Install Post- Pre-Install Targeted Targeted Date Rate, Install Cumul., GARP® GARP® BOEPD Stable MBOE Gross Gross Rate, Reserves, Reserves, BOEPD MBOE % of Cumul. Morgan- 12/3/2011 2.7 7.5 345 65 19% Kovar Select Lands 3/1/2012 0.5 10-14 247 72 29% #2 Select Lands 8/29/2012 0.1 10-17

Slide 26: Other Assets
OTHER ASSETS KKEVOLUTION Petroleum Corporation

Slide 27: Kay County, Oklahoma Mississippian Lime
Kay County, Oklahoma – oily region of play JV holds ~11,700 net acres in 38 sections (24,320 acres) EPM owns 34% share of JV, 36%-45% in first 2 wells Horizontal drilling in area previously developed with vertical wells – RRC and DVN active in Kay County Drilling and completion cost per we

Slide 28: Lopez Field and Giddings
LOPEZ FIELD – SOUTH TEXAS • 100% oil production from two producers • 28 drilling locations on existing leases – 100% working interest • Monetizing GIDDINGS (non-GARP®) • 3%-5% royalty interest in almost 3,000 acres in EagleBine play 28

Slide 29: Conservative, Strong and Aligned
Conservative, Strong and Aligned

Slide 30: Strong, Debt-Free Balance Sheet with Liquidity
Strong, Debt-Free Balance Sheet with Liquidity to Fund 2014 Strategic Plan & $10-18 MM CapEx* Debt to Common Market Cap Liquidity Resources (10/18/13) 100% 87% Revolver 90% $5 MM 80% 76% 70% available & 70% expanding 60% 48% 50% 6/30/13 50% 46% 39% FY14 W/C 40% CFFO $25 MM 30% 20% 10% 0% 0% EPM WRES

Slide 31: Total Alignment with Strategy to Selectively Grow and Reward Shareholders
Total Alignment with Strategy to Selectively Grow and Reward Shareholders Accretive Growth Increasing production at Delhi from: Reversion of 24% WI Scheduled capex projected to more than double oil equivalent pdn through 2017 Potential for dramatic growth through expansion of GARP® artificial lift
Source: Internet Archive copy of evolutionpetroleum.com
More decks from Evolution Petroleum Corporation, Inc.
Investor Presentation (November 2026)25 slides · November 2026
Q4 2026 Earnings Presentation25 slides · Sep 16, 2026
Investor Presentation (September 2026)25 slides · September 2026
Q3 2026 Earnings Presentation24 slides · May 13, 2026
Investor Presentation (February 2026)22 slides · February 2026
Investor Presentation (November 2025)23 slides · Nov 11, 2025