Core Silver Corp. · CSE:CC
Core Silver — Investor Presentation (2026)
16 slides from Core Silver's investor presentation, 2026
Slide 1: Copper gold & silver exploration in Yukon and British Columbia
Copper gold & silver exploration in Yukon and British Columbia CS E:CC | FSE:8ZR | OTCQB:CCOOF
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS Disclaimer and Confidentiality Agreement The presentation contained in this document has been prepared by Core Silver Corp. using its best efforts to realistically and factually present the information contained. However, subjective opinion, dependence upon factors outside
Slide 3: Investment Highlights
INVESTMENT HIGHLIGHTS >3,000 m Drilling to test Touleary’s scale Diamond drilling is underway to test extensions of historical mineralization and evaluate the broader system. 7.18% Cu A high-grade starting point A historical 2.25m1 copper intersection @ 7.18% Cu, 3.55g/t Au, 4.30% Zn, 116g/t Ag (115
Slide 4: Management Team
MANAGEMENT TEAM Nick Nick Jody Joshua Rodway, Ryan, Bellefleur, CPA, Vann P. Geo P. GEO CGA FOUNDER, CHIEF CHIEF GEOLOGIST CHIEF FINANCIAL VICE PRESIDENT, EXECUTIVE OFFICER, OFFICER BUSINESS DEVELOPMENT PRESIDENT & STRATEGY Mr. Rodway is a registered Professional Nick Ryan is a registered Profession
Slide 5: Board & Advisory Team
BOARD & ADVISORY TEAM Joel Sean Darryl MARCUS Faltinsky Charland Jones ADAM, P. GEO. DIRECTOR DIRECTOR DIRECTOR TECHNICAL ADVISOR Mr. Faltinsky holds a Bachelor of Mr. Charland is a seasoned 15+ years of capital market Mr. Adam has over 10 years experience in Engineering, Electrical & Electronics co
Slide 6: Core Silver Capital Structure
CORE SILVER CAPITAL STRUCTURE Core Silver Corp. Suite 400-570 Granville St. Vancouver, BC V6C 3P1 Date of formation April 20, 2016 Capitalization Structure Millions; excluding share price CSE: CC Exchange/Ticker OTC.QB: CCOOF FSE: 8ZR Shares Outstanding 54.14M Jurisdiction Canada, British Columbia w
Slide 7: Touleary Drilling Program >3,000 m
TOULEARY DRILLING PROGRAM >3,000 m Diamond drilling underway Testing extensions of historical mineralization and the scale of the broader system. Discovery Zone focus Significant copper-gold-zinc-silver intersections provide the starting point for follow-up drilling. Regional access upside The propo
Slide 8: Touleary Exploration Targets
TOULEARY EXPLORATION TARGETS 8 priority target areas Multiple opportunities to evaluate the broader mineralized system. Discovery Zone Historical VMS intersections offer a focused starting point for testing the extent of mineralization. Targets 4 and 8 Undrilled targets supported by sampling, geophy
Slide 9: Discovery Zone Expansion Potential
DISCOVERY ZONE EXPANSION POTENTIAL ~335 m ~250 m Historical strike tested Vertical depth tested Limited historical drilling leaves room to evaluate extensions of the zone. TL-11-005 Historical drill intersections Interval (m) Cu (%) Ag (g/t) Au (g/t) Zn (%) 2.25 7.18 116 3.55 4.30 14.15 1.45 16.5 0.
Slide 10: Discovery Zone Copper Mineralization
DISCOVERY ZONE COPPER MINERALIZATION Historical copper mineralization supports follow-up drilling Silicified sericite schist with abundant chalcopyrite TL-11-005 135.00 m depth Sericitic limonite with abundant chalcopyrite +/- covellite TL-11-005 116.025 m depth © 2 02 6 CORE SILV E R 10
Slide 11: Touleary Undrilled Targets
TOULEARY UNDRILLED TARGETS Target 4 Target 8 Copper-zinc soil anomalies align with geophysics, An interpreted vent complex and metal anomalies providing a focused target for drill testing support the search for VMS mineralization No historical drilling at either target. Both are potential program ta
Slide 12: Blue Project
BLUE PROJECT Core Silver holds 100% ownership of the Blue Property which ATLIN encompasses both the Silver Lime Porphyry-CRD Project and the Laverdiere Skarn-Porphyry Project located 15 km apart. BLUE PROPERTY Massive 1,140 km² district scale contiguous land position in British SKAGWAY Columbia’s pr
Slide 13: Silver Lime
SILVER LIME THE SILVER LIME PROJECT A mineralized footprint much larger than many of the world’s largest CRD deposits The Silver Lime CRD-Porphyry Project is located at the centre of the Blue Property. The Project currently consists of 7 highly prospective targets. o Grizzly CRD Target: High-grade A
Slide 14: Silver Lime Silver Project Location & Scope
SILVER LIME SILVER PROJECT LOCATION & SCOPE The Silver Lime CRD-Porphyry Project targets span the SILV ER LIM NAICA CR D D EPOSIT complete mineralization spectrum from Porphyry Mo-Cu to Fe- MEXICO - >45Mt Zn-Cu-Ag massive sulphide skarn and Ag-Pb-Zn-Cu±Au E 10 km x 9.5 km Surficial Mineralization Fo
Slide 15: 2.7-Kilometer-Long Mineralized Trend
SILVER LIME SILVER PROJECT MINERALIZATION SILVER LIME SILVER PROJECT PETE'S CRD TARGET SLM23-028 - 6.40m of 159g/t Ag, 16.4% Pb+Zn, and 0.23% Cu PETE'S from 27.43m depth, including 2.07m of 250g/t Ag, 23.2% Pb+Zn, and 0.31% Cu. AMP 2.7-KILOMETER-LONG MINERALIZED TREND GRIZZLY CRD TARGET SULPHIDE CIT
Slide 16: Corporate office
Corporate office Suite 400-570 Granville St. Vancouver, BC V6C 3P1 Nick Rodway nrodway@coresilvercorp.com CSE: CC | FSE: 8ZR | OTCQB: CCOOF CORPORATE PRESENTATION 2026