    ASX: CEL Challenger Gold Limited July 2025 Hualilan Gold Project : Cerro Sur looking north to Cerro Norte The Next High-Grade Gold Producer 1

  2. Slide 2: Important Notices and Disclaimer

    IMPORTANT NOTICES AND DISCLAIMER DISCLAIMER This presentation is for informational purposes only and does not constitute an offer to sell, or solicitation to purchase, any securities. Such Offer can be made only through proper subscription documentation and only to investors meeting strict suitabili

  3. Slide 3: Important Notices and Disclaimer – Scoping Study Cautionary Statement

    IMPORTANT NOTICES AND DISCLAIMER SCOPING STUDY CAUTIONARY STATEMENT The Scoping Study referred to in this presentation has been undertaken to determine the viability of a development of CEL’s Hualilan Gold Project and confirm the business case to progress more definitive studies on the project as th

  4. Slide 4: Challenger Gold Snapshot

    CHALLENGER GOLD SNAPSHOT Two significant discoveries, both with grade and scale, provide strategic flexibility Hualilan Gold Project El Guayabo Gold-Copper Project EL GUAYABO Au-Cu PROJECT EL ORO, ECUADOR 100% Owned El Oro; Ecuador Resource of 9.1 Moz2 AuEq 2.8 Moz1 AuEq Resource 9.1 Moz2 AuEq (6.9M

  5. Slide 5: Corporate Snapshot

    CORPORATE SNAPSHOT An experienced Board & Management team with a proven track record Key Executives Kris Knauer Sergio Sonia Mike Zivcic Stuart CEO & Rotondo Delgado COO Munroe Director Exec Vice Exec Director Exploration Chairman Manager • Exploration geologist. • Background in construction • Maste

  6. Slide 6: Argentina – Transformed by RIGI

    ARGENTINA – TRANSFORMED BY RIGI Investment climate in Argentina has transformed from negative to positive – now seen as a ‘go to’ Mining destination Hualilan is located in the San Juan province of Argentina ▪ Number 1 mining jurisdiction in South America (Fraser Institute Survey). BHP/ Lundin Vicuna

  7. Slide 7: Toll Milling – Early Production in 2025

    TOLL MILLING – EARLY PRODUCTION IN 2025 Recent equity raising fully funds CEL through to production via toll milling in Q4 2025 ▪ Toll Milling Agreement with Austral Gold Limited for 450 kWMT over 3 REVENUE EBITDA years, starting in Q4 2025. US$201.3M | AU$312.0M US$88.5M | AU$137.2M US$2,500/ oz Au

  8. Slide 8: Hualilan Standalone PFS Expected Early 2026

    HUALILAN STANDALONE PFS EXPECTED EARLY 2026 Potential for a significant increase in scale from the 2023 Scoping Study ▪ 2023 Scoping Study: Underground w/ HG starter pits. Avg. annual production over 7 year LOM - 116 koz Au (141 koz AuEq) for a ~1.0 Moz AuEq LOM. ▪ 5.8 Mt UG ore at 4.39 g/t AuEq and

  9. Slide 9: Challenger's Ecuadorian Assets

    CHALLENGER’S ECUADORIAN ASSETS 9.1 Moz Au equivalent - containing several high-grade zones Total El Guayabo/ Colorado V Project Resources of 9.1 million Ounces ▪ Total footprint 3,663 Ha – likely to host a Tier 1 Gold Project. ▪ Adjoins the 20.5 Moz Au (26 Moz AuEq) Cangrejos Gold Project. ▪ CEL att

  10. Slide 10: Hualilan Gold Project

    Hualilan Gold Project San Juan Argentina 10

  11. Slide 11: Hualilan Deposit

    HUALILAN DEPOSIT Manto style Zinc skarn with secondary intrusive overprint via vertical E-W faults Sentazon Fault 11

  12. Slide 12: High-Grade Mineralisation Open at Depth

    HIGH-GRADE MINERALISATION OPEN AT DEPTH Multiple locations over the 2.2 kilometres of strike that need to be followed up with deeper drilling Mineralisation Open at Depth ▪ MRE defined down to 450 metres sub- surface, with mineralisation open at depth ▪ High-grade intersections which are open at dep

  13. Slide 13: District Scale Play

    DISTRICT SCALE PLAY Several exciting regional gold targets defined for drilling Several exciting regional exploration Targets ▪ Several regional gold targets generated by Ion LeachTM grid sampling designed to see through the thin cover. ▪ 5km x 2.5km Cu anomaly also defined by Ion LeachTM. ▪ Traditi

  14. Slide 14: Excellent Metallurgy

    EXCELLENT METALLURGY Conventional Flotation with Flotation Tails Leach plus Heap Leach of the low-grade halo Key Ore Types 2. High-grade Au Skarn (Gravity + Bulk Float) 1. HG Zn/Au Skarn: 35% of Au - (4g/t Au, 20g/t Ag, 2.5% Zn) • Recoveries of 94% (gold) and 70% (silver) 2. HG Au Skarn: 35% of Au -

  15. Slide 15: Hualilan Mineral Resource Estimate - 2.8 Moz

    HUALILAN MINERAL RESOURCE ESTIMATE - 2.8 MOZ Grade tonnage distribution provides significant optionality and flexibility 2023 Mineral Resource Estimate (MRE) - 2.8 million ounces (AuEq) Cut-off Au Ag Zn AuEq Con. Oz ▪ Based on 240,000 metres of diamond core drilling – reducing risk. (g/t AuEq) Tonne

  16. Slide 16: Building a District Scale Footprint at Hualilan

    BUILDING A DISTRICT SCALE FOOTPRINT AT HUALILAN Hualilan is a big system and we have only scratched the surface 2.8Moz 54.4 g/t Au, 151 g/t Ag 2.5 km 3.5km 12.1 g/t Au, 62.1 g/t Ag AuEq Resource Mineralised Resource Strike Strike (marked in red) 632 km2 Deepest hole Several 26.9 g/t Au, 423 g/t Ag 2

  17. Slide 17: 2023 Scoping Study Outcomes

    2023 SCOPING STUDY OUTCOMES Robust low capex quick payback option for a low gold price funding constrained environment The 2023 Scoping Study provided a starting point for a Hualilan targeting the high-grade Objective Outcome core of the deposit ▪ Targeted high-grade core of MRE while Consistent Pro

  18. Slide 18: Toll Milling - 2025 Pre-Feasibility Study Outcomes

    TOLL MILLING – 2025 PRE-FEASIBILITY STUDY OUTCOMES PFS demonstrates robust toll milling outcome for while only taking 3% of Hualilan’s MRE Key Assumptions Gold Silver ✓ High grade, reserve-only schedule Recovery 84.4% 65.7% ▪ Average mined grade of 6.2 g/t Au and 35 g/t Ag, front loaded to 6.91 g/t

  19. Slide 19: Toll Milling Mine Plan

    TOLL MILLING MINE PLAN Designed to transition seamlessly to, and facilitate, the larger full-scale development Toll Milling site layout designed with full-scale operations in mind ▪ Four low-strip high-grade starter pits identified – providing surplus material relative to Toll Milling contractual ob

  20. Slide 20: Why Toll Milling and What Does It Achieve?

    WHY TOLL MILLING AND WHAT DOES IT ACHIEVE ? Toll Milling can provide a pathway to fund stand-alone Hualilan development Transformational cashflow from the execution of Toll Milling, Parameter USD/ WMT Ore sufficient to fund stand-alone Hualilan development Gold | Silver Price (USD/ oz) 2000 | 20 250

  21. Slide 21: Key Deliverable Tracking

    KEY DELIVERABLE TRACKING Subject to outcome of studies, Challenger is targeting FID for Hualilan standalone development in CY2027 2025 2026 2027 Indicative Timeline Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Toll Milling Site Works and Ramp-Up Toll Milling Production Hualilan Drilling & Upsized Standalone Pre-Fe

  22. Slide 22: Ecuador: Lumina Gold Takeover Demonstrates Significant Value

    Ecuador Lumina Gold Takeover demonstrates significant value 22

  23. Slide 23: Project Resources of 9.1 Million Ounces

    PROJECT RESOURCES OF 9.1 MILLION OUNCES Just a start – only 5 of the 15 regionally significant gold-in-soil anomalies drilled Total project resource of 9.1 million ounces at 0.50 g/t AuEq 570mt at 0.4 g/t Au, 2.2 g/t Ag, 0.1% Cu, 10 ppm Mo CV-A and CV-B MRE of 4.4 million ounces at 0.50 g/t AuEq – (

  24. Slide 24: Typical Cross Sections

    TYPICAL CROSS SECTIONS Broad consistent zones of mineraliation over 1 kilometre true width El Guayabo - 4.7 Moz AuEq Colorado V - 4.4 Moz AuEq GY-A Anomaly and GY-B Anomaly CV-A Anomaly 24

  25. Slide 25: Challenger Corporate Strategy

    CHALLENGER CORPORATE STRATEGY Considerable optionality within the Challenger portfolio with Company now well-positioned to maximise value of diversified portfolio ▪ Recent equity raising has fully funded Challenger through to production via Toll Milling from Q4 2025. ▪ Toll Milling Agreement feeds ~

  26. Slide 26: Challenger Gold Limited

    CHALLENGER GOLD LIMITED (ASX:CEL) ACN 123 591 382 Level 1, 100 Havelock Street, West Perth WA 6005 | P: +61 8 6385 2743 Challenger Gold Limited ASX Ticker : CEL Kris Knauer Sergio Rotondo Sonia Delgado Jane Morgan CEO & Managing Director Vice Chairman Executive Director Media Relations +61 411 885 9

  27. Slide 27: Appendices

    Appendices 27

  28. Slide 28: Argentina Mineral Resource and Reserve Estimate

    ARGENTINA MINERAL RESOURCE AND RESERVE ESTIMATE Released 4 June 2025 Ore Reserve Statement Cut-off Grade Tonnes AuEq Au Ag AuEq Contained Au Contained Ag Contained Classification (gpt AuEq) (000 dmt) (gpt) (gpt) (gpt) (000 oz) (000 oz) (000 oz) Proven 1.9 - - - - - - - Probable 1.9 427.5 7.0 6.6 37.

  29. Slide 29: Ecuador Mineral Resource Estimate

    ECUADOR MINERAL RESOURCE ESTIMATE Released 9 April 2025 Au Ag Cu Mo AuEq AuEq Domain Category Mt (g/t) (g/t) (%) (ppm) (g/t) (Mozs) El Guayabo Concessions (CEL 100%) US$2000 optimised shell Note: Some rounding errors may be present > 0.3 g/t AuEq Inferred 240 0.36 2.4 0.06 8.0 0.48 3.7 Table 1 Combi