Nickel Asia Corp. · PSE:NIKL

Nickel Asia — Investor Presentation (November 2023)

53 slides from Nickel Asia's investor presentation, November 2023

  1. Slide 1: Investor Presentation

    N I C K E L A S I A C O R P. INVESTOR PRESENTATION

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation and the information contained herein as well as the materials distributed herewith ("Presentation") are the sole and exclusive property of Nickel Asia Corporation ("NAC") and shall only be used for the purpose intended herein. This Presentation is not intended to provide

  3. Slide 3: NAC Overview

    NAC OVERVIEW ey. RoR 7. r/ [ips ¥ 7 A ee

  4. Slide 4: Our Investment Story

    OUR INVESTMENT STORY We are well-positioned to achieve our twin goals of being included in the PSE Index’s Top 25 companies in terms of market capitalization and becoming a Premier ESG investment by 2025: Leading, growing, profitable, and rewarding mining business underpinned by structurally support

  5. Slide 5: NIKL at a Glance

    NIKL AT A GLANCE The largest nickel ore producer in the Philippines, accounting for 39% of Philippine and 5% of global production in 2022 and a forerunner in the Philippine RE industry with 1GW aspiration by 2028. COMPANY FACTS PERFORMANCE* OUR PARTNERS 7 P28B P79.6B Mines Revenue Market Capitalizat

  6. Slide 6: Leading and Stable Mining Business

    LEADING AND STABLE MINING BUSINESS Largest Philippine Nickel Ore Producer Established Nickel Ore Supplier Philippines nickel mine production Nickel Asia ore output (mWMT) by major operator (kt Ni) 400 17.7 19.4 18.8 17.9 18.2 2.2 2.0 15.9 144 2.5 1.7 1.8 300 66 61 2.6 2.8 3.0 132 120 102 97 1.9 3.0

  7. Slide 7: The Nickel Class Divide

    THE NICKEL CLASS DIVIDE 1 CLASS 2 surplus persists. 2 CLASS 1 market is growing, but there are supply chain risks. 3 Nickel deficit is inevitable which implies Ni price upside.

  8. Slide 8: 1. Class 2 Surplus Persists

    1. CLASS 2 SURPLUS PERSISTS Stainless steel surplus is due to Indonesia’s increased NPI production. SS will see steady growth and surplus will persist Indonesia NPI production growth accelerates Stainless Steel (SS) 2020-27, kt Ni SS Production breakdown 2020-27, kt Ni 3,000 200 3,000 2,500 150 2,50

  9. Slide 9: 2. Class 1 Nickel Market Is Growing: EV Mass Adoption

    2. CLASS 1 NICKEL MARKET IS GROWING: EV MASS ADOPTION IS HAPPENING Global NEV sales penetration in ‘000’s units EV mass adoption and EV share as % of total vehicles Research indicates NEV 120,000 35.0% sales to reach 33 million 100,000 30.0% units in 2027 for 31% of 25.0% total global vehicle 80,000

  10. Slide 10: Class 1 Nickel Market: Nickel Demand for Batteries Will Double

    2. CLASS 1 NICKEL MARKET IS GROWING: NICKEL DEMAND FOR BATTERIES WILL DOUBLE By 2027, nickel-containing EV batteries will By 2027, battery market will account for 29% of account for 71% of total EV batteries. global nickel demand. Global EV battery chemistry market share, 2016-2027 (% of MWh) Primar

  11. Slide 11: Class 1 Nickel Market: Demand and Supply Almost Double

    2. CLASS 1 NICKEL MARKET IS GROWING: NICKEL DEMAND FOR BATTERIES WILL DOUBLE Class 1 demand and supply projected to almost double due to EV adoption and Indo HPAL projects. Class 1 surplus can provide relief to NiSO4 tightness, caused by battery materials demand. Class 1 nickel demand by end-use, 20

  12. Slide 12: Class 1 Nickel Market: Supply Chain Risks

    2. CLASS 1 NICKEL MARKET IS GROWING: BUT THERE ARE SUPPLY CHAIN RISKS Nickel ore supply is limited Indonesian average mine life is limited Indonesian mine production boost continues due to relative to mine production forecasts investments in downstream processing Mine Production Unit 2023 2024 2025

  13. Slide 13: Nickel Sees a Dynamic Regulatory Environment

    2. CLASS 1 NICKEL MARKET IS GROWING: BUT THERE ARE SUPPLY CHAIN RISKS Nickel sees a dynamic regulatory environment Source: BBC News, Reuters

  14. Slide 14: Timeline of HPAL Project Execution

    2. CLASS 1 NICKEL MARKET IS GROWING: BUT THERE ARE SUPPLY CHAIN RISKS Timeline of HPAL Project Execution MHP supply by operation, 2017-2027, kt Ni HPAL pipeline is large, but will these projects finish 800 Ramu on time and on budget, or MHP supply is expected to grow, as MHP is cheaper and Gordess N

  15. Slide 15: Nickel Deficit Is Inevitable Beyond 2027

    3. NICKEL DEFICIT IS INEVITABLE BEYOND 2027 IMPLIED UPSIDE TO NICKEL PRICES Nickel Demand Supply forecast 2020 – 2032, in kt Ni For 2023-2027, we assume 1. Mass adoption of NEVs and an optimistic launch of all 7,000 announced HPAL 400 increase in nickel demand will projects, with no delays. 6,000 20

  16. Slide 16: Regulatory Updates

    REGULATORY UPDATES House Bill No. 8937 was approved on second reading last Sept. 18. “Philippine Mining Fiscal Regime Act” Legislative features Existing Comments or House Bill No. NAC mines benefit. 1. Royalty Rate for operations within NAC’s three mine sites, TMC, HMC, and mineral reservations of t

  17. Slide 17: Development Pipeline

    DEVELOPMENT “<= PIPELINE

  18. Slide 18: Mining Development Pipeline

    MINING DEVELOPMENT PIPELINE BULANJAO MANICANI Resources as of 12/31/2022 70M WMT @1.61% Ni 47M WMT @1.55% Ni Percent of MPSA Area Drilled 22% of 3,553 hectares 38% of 1,165 hectares Target Annual Production 4M+ WMT 2M+ WMT 35% Saprolite 50% Saprolite Target Annual Product Mix 65% Limonite 50% Limoni

  19. Slide 19: Pujada Project Disclosure – Feb 2023

    PUJADA PROJECT DISCLOSURE – 17 FEB 2023 NAC or its wholly-owned subsidiary is the exclusive mining service contractor for Hallmark Mining Corporation and Austral-Asia Link Mining Corp.’s Mineral Production Sharing Agreement (MPSA) ▪ Conduct feasibility study to establish HPAL or equivalent mineral p

  20. Slide 20: Financial Highlights

    FINANCIAL HIGHLIGHTS

  21. Slide 21: NIKL and EPI 9M-23 Highlights

    NIKL AND EPI 9M-23 HIGHLIGHTS NICKEL MINING RENEWABLE ENERGY (EMERGING POWER INC.) ▪ Revenues from sale of ore decreased by 15% YoY to P16.8 ▪ Jobin-SQM Inc. (JSI) now operating a total capacity of 100-MW billion due to lower nickel ore prices which weighed down the from 62 MW YoY; generation for th

  22. Slide 22: Financial Highlights (9M-23 vs 9M-22)

    FINANCIAL HIGHLIGHTS (9M-23 VS 9M-22) Revenue (PHP bn) EBITDA (PHP bn) Net Income (PHP bn) Sale of ore Services and thers 14.4 14.3 7.8 7.9 12.3 6.9 27.4 28 9.5 21.8 21.5 8.5 17.9 19.3 4.1 6.5 3.6 2.7 2019 2020 2021 2022 9M-23 9M-22 2019 2020 2021 2022 9M-23 9M-22 2019 2020 2021 2022 9M-23 9M-22 201

  23. Slide 23: Special Cash Dividend Declaration

    SPECIAL CASH DIVIDEND DECLARATION Total Dividend in % of 2022 Per Share Billion Php Net Income Cash Dividend Paid in April Regular Dividend ₱0.17 ₱2.379 30.0% 2023 Proposed Special Cash Dividend for ₱0.07 ₱1.000 12.6% November 9, 2023 Total Cash Dividend for 2023 ₱0.24 ₱3.379 42.6% Declaration Date:

  24. Slide 24: Shipments and Revenues by Ore Type

    SHIPMENTS AND REVENUES BY ORE TYPE Nine-Month Period Comparison Sales Volume Average Ore Sale Prices Revenue (in PHPbn) (in millions WMT) (in US$/WMT) 19.9 -15% YoY 16.8 change -26% YoY 29.2 5.7 Flat YoY change 5.72 Limo HPAL Ore Exports 5.76 5.0 -13% YoY 38.9 change 14.2 +10% YoY -17% YoY 15.7 11.9

  25. Slide 25: Revenue – Variance Analysis

    REVENUE – VARIANCE ANALYSIS Nine-Month Period Comparison Sales Volume (in millions WMT) 9M-23 +5% YoY change 13.01 9M-22 12.43 Sales Price (in millions WMT) 9M-23 -22% YoY change 23.24 9M-22 29.86 FX Rate (PHP/USD) 9M-23 +2.6% YoY change 55.64 9M-22 54.24

  26. Slide 26: Cost & Expenses – Variance Analysis

    COST & EXPENSES – VARIANCE ANALYSIS Nine-Month Period Comparison Sales Volume (in millions WMT) 9M-23 +5% YoY change 13.01 9M-22 12.43 Fuel Prices (P/Liter) 1Q'23 +3% YoY change 52.5 1Q'22 50.9

  27. Slide 27: Net Income – Variance Analysis

    NET INCOME – VARIANCE ANALYSIS Nine-Month Period Comparison Net Income (in Peso billions) ▪ Reported attributable net income at P3.6 billion, down 47% YoY due to lower ore prices in this year’s 2Q to 3Q, impacting our ore revenues. ▪ HPAL operations registered loss of P380 million -47% YoY change in

  28. Slide 28: Investment in HPAL Equity Earnings

    INVESTMENT IN HPAL EQUITY EARNINGS Equity Earnings, in PHP Millions ▪ The reduced Nickel and Cobalt prices had 1,200 (9M-23 VS 9M-22 comparison) impacted Equity earnings from investments in 1,000 the HPAL operations. 1,024 800 600 400 767 200 257 61 - (200) (442) (400) -381 (600) 9M-22 9M-23 THPAL C

  29. Slide 29: Renewable Energy

    RENEWABLE ENERGY

  30. Slide 30: Philippine Shift to Renewable Energy

    PHILIPPINE SHIFT TO RENEWABLE ENERGY ▪ Key drivers of electricity consumption: Capacity and peak demand in PH (GW) Macroeconomic recovery post- 100 New Wind New Solar pandemic and strong population PH GOV’T New Biomass New Hydro growth TARGETS FOR RE New Geothermal New Gas New Coal Committed Capacit

  31. Slide 31: Investment into Renewable Energy

    INVESTMENT INTO RENEWABLE ENERGY (1) Jobin SQM, Inc. (JSI) ▪ 52% EPI, 38% NAC ▪ Subic Bay Freeport Zone ▪ 50-year (+25) lease for 800 hectares SOLAR ▪ 25-year Service Contracts ▪ 230kv line can accommodate 200 MW+ POWER ▪ 172MWbyDec2023;200MWby2025 ▪ Of existing 100 MW, 68 MW was built below budget

  32. Slide 32: Partnership with Shell a Significant Milestone

    PARTNERSHIP WITH SHELL A SIGNIFICANT MILESTONE The Joint Venture Corporate Structure ▪ On July 1, 2022, EPI and Shell signed a Joint Venture (JV) partnership to jointly develop, own, operate, and maintain onshore renewables projects in the Philippines ▪ Exclusive platform for utility scale grid-conn

  33. Slide 33: EPI's Solar Projects Under or to Start Construction in 2023

    EPI’S SOLAR PROJECTS UNDER OR TO START CONSTRUCTION IN 2023 JSI Subic Cawag Leyte Project Operating Capacity 100 MW Capacity Under Construction 72 MW 145 MW 240 MW or For Construction The incremental Attribute capacity under construction to 72 MW 145 MW 144 MW EPI (in MW) Ongoing, Target Completed i

  34. Slide 34: EPI's Geothermal Pipeline

    EPI’S GEOTHERMAL PIPELINE BILIRAN (BGI) MINDORO (MGCP) Initially 50 MW (out P50 of 200 Capacity 20 MW (P90 of 20 MW) MW+) Attributable MW to EPI 22MW 20 MW 100% Complete with turbines Ongoing Proof of Concept Pilot installed, awaiting ERC permits Target Completion: Project and target to 2Q 2024 ener

  35. Slide 35: EPI's Projected Capacity Buildup

    EPI’S PROJECTED CAPACITY BUILDUP OF SOLAR, WIND, AND GEOTHERMAL GENERATION ASSETS (Gross Capacity, MW) ▪ Load profile being developed to 2,500 serve solar peak and night peak hours. 2,000 ▪ PSAs to be against portfolio 289 261 218 (not single plant).​ 84 321 288 1,500 894 355 ▪ Does not yet include

  36. Slide 36: JSI Financial Highlights (9M'2022 to 9M'2023)

    JSI FINANCIAL HIGHLIGHTS (9M’2022 to 9M’2023) Generation (in MWh) Revenues (in PHP millions) EBITDA (in PHP millions) 106,032 528.89 442.40 77,981 393.67 331.09 9M-22 9M-23 9M-22 9M-23 9M-22 9M-23 9M-22 9M-23 9M-22 9M-23 9M-22 9M-23 9M’22 9M’23 YoY% Change Generation (in MWh) 77,981 106,032 36% Pres

  37. Slide 37: Sustainability

    SUSTAINABILITY

  38. Slide 38: Awards and Recognition

    FINANCEASIA ASIA’S BEST COMPANIES ASIAMONEY PHILIPPINE STOCK EXCHANGE NAC received a Gold citation and was NAC has been recognized as the Nickel Asia Corporation (PSE:NIKL) one of only four companies in the Basic MOST OUTSTANDING Company in joins Philippine Stock Exchange Materials Company sector re

  39. Slide 39: ESG Score Improved to 34.8 from 43.7

    ESG SCORE IMPROVED TO 34.8 FROM 43.7 Nickel Asia Corp. Rating Report Material ESG Issues Score and Risk Category ESG Risk Exposure ESG Risk Management ESG Risk Rating Contribution to Issue Name Score | Category Score | Category Score | Category ESG Risk Rating 34.8 High Risk Community Relations 8.1

  40. Slide 40: Our Sustainability Performance

    OUR SUSTAINABILITY PERFORMANCE ESG is at the forefront of our priority to address material risks with our medium- to long-term targets. NAC ESG Roadmap and UN SDGs Contribution Digital ESG Reporting and Automated Data Workflows NAC is transitioning to digital tools to optimize data collection, verif

  41. Slide 41: Sustainability Stakeholders' Engagement Program

    SUSTAINABILITY STAKEHOLDERS’ ENGAGEMENT PROGRAM NAC’S FIRST EVER SUSTAINABILTY RUN FOR MANGROVE RESTORATION NAC held its first-ever Sustainability Fun Run on July 23 to support mangrove restoration in Hagonoy, Bulacan. The run took place simultaneously at three locations across the country (Manila,

  42. Slide 42: Presentation End

    PRESENTATION END

  43. Slide 43: Executive Team

    EXECUTIVE TEAM MARTIN ANTONIO ZAMORA MARIA ANGELA VILLAMOR President & CEO SVP for Finance & CFO ▪ Philippine Country Manager ▪ Senior Director, SGV & Co. and Director, UPC ▪ Senior Manager, KPMG UAE Renewables ▪ Management Development ▪ CLSA Program, Asian Institute of ▪ Robert Fleming & Co. Manage

  44. Slide 44: IR Team

    IR TEAM MARTIN ANTONIO ZAMORA RONALD IBASCO President & CEO President & CEO, EPI ▪ Philippine Country Manager ▪ Independent Board Director, and Director, UPC Vingroup Renewables ▪ Managing Director, Barclays ▪ CLSA Capital SEA ▪ Robert Fleming & Co. ▪ HK propriety trading lead, ▪ MBA, London Busines

  45. Slide 45: Appendix

    APPENDIX

  46. Slide 46: Mining Assets

    MINING ASSETS EP – 004 (Manmanok) EXPA – 0014 (Kutop) EXPA – 116 (Cervantes) AFTA – 008 - CAR EXPA – 116 (Mankayan) Dinapigue EP-001-2016-III (Newminco) LEGEND Manila Operating Mines Exploration Projects - Nickel Exploration Projects - Gold Development Projects - Nickel Major Cities Puerto Princessa

  47. Slide 47: Nickel Ore Products

    NICKEL ORE PRODUCTS COUNTRY/ FINAL ORE TYPE CONTENT USED IN TECHNOLOGY PRODUCT Japan: Fe Ni Ni: 1.25-1.5% FeNi or NPI 300-Series Saprolite Fe: <20% China: (10% Ni) Stainless Steel NPI (RKEF) Limonite for Ni: 0.8-0.9% China: Low Grade NPI 200-Series High Fe NPI (BF) Export Fe: 48-50% (1-2% Ni) Stainl

  48. Slide 48: Reserves and Mine Life

    RESERVES AND MINE LIFE Nickel Asia has the largest nickel reserves and its mines have the longest remaining mine life in the Industry Shipments by Mine (mWMT) Ore Reserves by Mine (mWMT) Mine Life Proved and Probable (as of Dec. 31, 2022) Years from December 31, 2021 8.5 8.3 23 120.3 7.9 Average Min

  49. Slide 49: Battery Materials Supply for NiSO4 and MHP Is Tight

    BATTERY MATERIALS SUPPLY FOR NICKEL SULPHITE (NiS04) AND MHP IS TIGHT NiSO4 tightness will improve but will remain MHP supply foreseen to be tight despite tight up until 2026 major HPAL project pipeline NiSO4 2020-2027, kt Ni MHP Balance 2020-2027, kt Ni 1,600 100 800 - 1,400 50 700 (2) 1,200 600 (4

  50. Slide 50: Investment in HPAL Projects

    INVESTMENT IN HPAL PROJECTS Coral Bay Taganito HPAL ▪ Most successful implementation of HPAL technology in the world. Palawan, adjacent Surigao Del Norte, ▪ End products are refined in Location to Rio Tuba mine adjacent to Taganito mine Japan by Sumitomo Metal Mining Equity Ownership 15.625% 10% and

  51. Slide 51: Emerging Power Inc. Solar Plant Tour

    EMERGING POWER INC. SOLAR PLANT TOUR Eight of the largest Domestic Institutional Investors visited our Sta. Rita Power plant last Feb. 3, 2023. JSl's Sta. Rita Solar Power Plant has an installed capacity of 100 megawatts (MW), with another 72 MW in construction. Investors and fund managers from diff

  52. Slide 52: Emerging Power Inc. Solar Plant Tour: Flywheel Energy Storage

    EMERGING POWER INC. SOLAR PLANT TOUR Technical Inspection of the Flywheel Energy Storage System (FESS) by the ERC Installed Capacity EPI is piloting two flywheel energy storage units 16 kW /64 kWh to store and generate power after sunset. This is 2 units of M32 FESS the first time a flywheel battery

  53. Slide 53: Investment Parameters

    INVESTMENT PARAMETERS In selecting sites, we follow these criteria: ▪ lrradiance, wind, or geothermal resources assessment are better than average ▪ Possessory rights are clear and robust ▪ Viable and cost-effective connection solution to the grid ▪ ESG best practices can be implemented Availability

Nickel Asia — Investor Presentation (November 2023) on 6ix