Koba Resources Limited · ASX:KOB
Koba Resources — RIU Sydney Resources Round-up Conference 2025
25 slides from Koba Resources's conference presentation, May 6, 2025
Slide 1: RIU Sydney Resources Round-up Conference Presentation (ASX Release)
6 MAY 2025 ASX RELEASE RIU Sydney Resources Round-up Conference Presentation Koba Resources Limited (ASX:KOB) attaches a copy of the presentation that its Managing Director Ben Vallerine will present at the RIU Sydney Resources Round-up Conference at 10.00am (AEST) on 8 May 2025. Authorised for rele
Slide 2: Yarramba Uranium Project: Three High-Grade Discoveries
Yarramba Uranium Project Three High-Grade Discoveries in Australia’s Premier Uranium District RIU Sydney Resources Round-Up 6, 7 & 8 May 2025 Ben Vallerine Managing Director ASX:KOB | kobaresources.com
Slide 3: Investment Highlights
Investment Highlights Tier One Location World Class District Prospective Ground Yarramba Project located in South Australia, Project is adjacent to successful uranium Yarramba Project comprises 5,000 km2 which the premier state for uranium exploration producer, Boss Energy in a district with include
Slide 4: Capital Structure
Capital Structure Share price Market capitalisation Koba Share Price v Uranium Price $0.04 $6.3m $105 Since February 2024 $0.18 52 week high $0.18, low $0.04 At $0.04 $0.16 $95 $0.14 Shares on issue Cash 158.6m $1.3m* $0.12 $85 $0.10 *As at 31 March 2025. $75 $0.08 $0.06 Performance rights Options (
Slide 5: Koba's Flagship Yarramba Uranium Project
Koba’s Flagship Yarramba Uranium Project Located in a World-Class Uranium District Two operating in-situ recovery uranium mines nearby. • The Yarramba Project is located: • 17km north of the Honeymoon Uranium Operation: • 71.6Mlbs @ 620ppm U3O8 of resources.1 • Produced their first drum of yellowcak
Slide 6: Three New High-Grade Discoveries
Three New High-Grade Discoveries From maiden drilling program in 2024 - 2025 Discoveries at the Everest, Berber and Chivas Prospects. • Completed 123 holes for 12,800m during maiden drill program. • Discoveries confirm the significant potential at Yarramba, where there remains 250km of palaeochannel
Slide 7: Yarramba Palaeochannel: Everest and Mt John Prospects
Yarramba Palaeochannel Everest and Mt John Prospects Immediately along strike from over 50Mlbs of uranium resources at the Honeymoon, Jason and Saffron Deposits. • Significant mineralisation intersected previously, just 850m south of Koba’s tenement. Drill results include: • 1.3m @ 722ppm eU3O8; and
Slide 8: Everest Prospect
Everest Prospect A significant discovery Multiple high-grade drill intercepts >1,000ppm eU3O8 over 4km of strike. • Initial discovery made when 22 broad spaced holes were drilled in February 2025. • High-grade results returned from initial broad-spaced drilling include: • 1.0m @ 558ppm eU3O8 from 85
Slide 9: Everest Prospect: Consistent mineralisation across multiple horizons
Everest Prospect A significant discovery Consistent mineralisation across multiple horizons. • Currently, drill lines are spaced 400m – 1200m apart. • Opportunity to delineate thicker and higher-grade mineralisation with infill drilling. • Mineralisation also remains open along strike and across tre
Slide 10: Mt John Prospect
Mt John Prospect Significant results from maiden drilling at MJ3B target Mineralisation over 600m of strike at the MJ3B target. • Significant results at the MJ3B target include: • 1.3m @ 501ppm eU3O8 from 99.9m; • 0.9m @ 452ppm eU3O8 from 100.8m; • 1.3m @ 391ppm eU3O8 from 99.5m; and 0.9m @ 342ppm e
Slide 11: Oban Uranium Deposit
Oban Uranium Deposit Initial drilling confirms shallow, high-grade mineralisation Potential to expand the resource base through step out drilling and discovery. • Significant results from Koba’s maiden drill program in 2024 include: • 3.9m @ 805ppm eU3O8 from 87.0m; including • 1.3m @ 1,261ppm eU3O8
Slide 12: Oban Uranium Deposit: Significant results from previous drilling
Oban Uranium Deposit Significant results from previous drilling Consistent and contiguous high- grade mineralisation. • Contiguous drill results from a single section include: • 2.12m @ 2,236ppm eU3O8; • 2.65m @ 1,174ppm eU3O8; 2.12m @ 2,236ppm eU3O8 • 2.20m @ 1,502ppm eU3O8; and • 1.80m @ 1,306ppm
Slide 13: Berber and Chivas Prospects
Berber and Chivas Prospects High-grade uranium discoveries from step out exploration drilling Strong potential for resource expansion confirmed by these discoveries. • High-grade results from new discoveries include: • the Berber Prospect. • 1.6m @ 1,026ppm eU3O8 from 91.5m. • The Chivas Prospect. •
Slide 14: Berber Prospect
Berber Prospect High-grade results - open in all directions Sparsely drilled 1500m corridor between Berber and the Oban Deposit. • Berber was first identified in the 1990s when ten holes were drilled. • Koba has discovered thicker and higher-grade mineralisation >350m further east, with significant
Slide 15: Chivas Prospect
Chivas Prospect High-grade mineralisation remains open to the east Discovered with step out drilling 700m east of the Oban Deposit. • Significant uranium mineralisation identified in the initial step out drilling at the Chivas Prospect, 700m east of the Oban Deposit including: • 1.0m @ 629ppm eU3O8
Slide 16: Significant Regional Potential
Significant Regional Potential 250km of palaeochannels to explore across 5,000km2 Numerous prospects to follow-up. • Previously identified prospects with limited and only broad-spaced drilling that have returned significant intercepts include: • Yarramba North – 2.0m @ 530ppm eU3O8. • Bingelly – 1.0
Slide 17: Yarramba Palaeochannel: Beyond the known prospects
Yarramba Palaeochannel Beyond the known prospects Target 2 Koba continues to generate new conceptual Target 1 targets to drive discovery. • Regional and localised faults at the Honeymoon mine have influenced the mineralisation and palaeochannel morphology. • Mineralisation at Everest occurs at the i
Slide 18: Forward Work Plan
Forward Work Plan Phase 2 drilling planned for Q3 2025 Permits and clearances being acquired to test multiple high-priority targets in Q3 2025. • Extensional and in-fill drilling at the high-grade Everest Prospect; • Extensional and infill drilling at the high-grade Berber Prospect that remains open
Slide 19: Experienced Board
Experienced Board Extensive uranium experience Mike Haynes Ben Vallerine Scott Funston Ian Cunningham Non-Executive Chairman Managing Director Non-Executive Director Company Secretary • 30 years’ experience in international • Founder and Managing Director of Koba • Proven executive level experience
Slide 20: Disclaimer
Disclaimer This presentation prepared by Koba Resources Limited (“Company”) does not purport to contain all the information that a statements reflect current expectations, intentions or strategies regarding the future and assumptions based on currently prospective investor may require in connection
Slide 21: Contact
Contact The Oban Deposit Area Ben Vallerine Managing Director Ground Floor 215 Hay Street Subiaco, Western Australia, 6008 Phone: +61 8 9226 1356 Mobile: +61 4 3997 0595 Email: info@kobaresources.com kobaresources.com Alex Cowie Investor Relations Mobile +61 412 952 610 alexc@nwrcommunications.com.a
Slide 22: Appendices
Appendices Drilling at the Everest Prospect, February 2025 21
Slide 23: In-Situ Recovery (ISR)
In-Situ Recovery (ISR) Accounts for ~ 60% of global uranium production • Discoveries within the Yarramba Project will potentially be amenable to ISR mining like the neighbouring Honeymoon Mine. • Well understood and proven technology. • Low-cost mining method. • Reverses the natural process of urani
Slide 24: Nuclear Energy is a Clean Energy Source
Nuclear Energy is a Clean Energy Source Uranium spot price has gained 200% Uranium Spot Price $US/lb over 5 years, despite recent pullback As at 1 May 2025 $120 • Nuclear energy, using uranium as fuel, helps fight climate change by providing low-carbon power as an alternative to $100 fossil fuels. •
Slide 25: Growth in Nuclear Energy is driving increased demand for uranium
Growth in Nuclear Energy is driving increased demand for uranium Nuclear is a well-established industry with a supply demand gap • Approximately 440 nuclear reactors operate globally. • Countries are turning back to “clean” nuclear power with: • 60 nuclear reactors under construction; and • 110 nucl