PT Wijaya Karya Beton Tbk · IDX:WTON

PT Wijaya Karya Beton Tbk — Q1 2017 Earnings Presentation

64 slides from PT Wijaya Karya Beton Tbk's earnings presentation, 2017

  1. Slide 1: PT Wijaya Karya Beton Tbk 1Q 2017

    Slide 1: PT Wijaya Karya Beton Tbk 1Q 2017

    PT Wijaya Karya Beton Tbk 1Q 2017 1

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER The information that follows is a presentation of general background information about PT Wijaya Karya Beton Tbk (the “Company” or “WIKA Beton”) prepared by the Company. This presentation has been prepared for information purposes only. None of the information appearing in this presentati

  3. Slide 3: Table of Contents

    Slide 3: Table of Contents

    TABLE OF CONTENTS 1 COMPANY PROFILE 2 INDUSTRY OVERVIEW 3 BUSINESS OVERVIEW 4 STRATEGIC PLAN 5 FINANCIAL HIGHLIGHT 6 COMPANY UPDATES www.wika-beton.co.id Innovation and Trust 3

  4. Slide 4: 1 Company Profile

    Slide 4: 1 Company Profile

    @uABETON COMPANY PROFILE

  5. Slide 5: Vision, Mission & Core Value

    Slide 5: Vision, Mission & Core Value

    VISION, MISSION & CORE VALUE VISION MISSION “To be the foremost precast concrete company in  Providing excellent & competitive products and services in EPI engineering, production, and installation (EPI) In and fulfill the expectation of customers. Southeast Asia.”  Providing added value through b

  6. Slide 6: Key Milestone (1/2)

    Slide 6: Key Milestone (1/2)

    KEY MILESTONE (1/2) WIKA Beton as Division of WIKA 1988 • Established new concrete factory in Binjai, North Sumatera (6th factory). • New products: bridge and drainage concretes. 1981 - 1984 • Established new concrete factories in Pasuruan (2nd factory), Boyolali (3rd factory), and Majalengka (4th f

  7. Slide 7: Key Milestone (2/2)

    Slide 7: Key Milestone (2/2)

    2016 • Starting Readymix KEY MILESTONE (2/2) Concrete Bussiness . • Established associate WIKA Beton as Subsidiary of WIKA company, WIKA Pracetak Gedung. • Launching PC WALL with length up to 2014 24.6 m • Listed company at IDX 08 April 2014. • Aquisition PT Citra Lautan Teduh in Batam. • Unit Inner

  8. Slide 8: Corporate Structure (1/2)

    Slide 8: Corporate Structure (1/2)

    CORPORATE STRUCTURE (1/2) WTON WTON WTON 51.0% 99.5% 60.0% Associate Company WTON 49.0% www.wika-beton.co.id Innovation and Trust 8

  9. Slide 9: Corporate Structure (2/2)

    Slide 9: Corporate Structure (2/2)

    CORPORATE STRUCTURE (2/2) 11.22% 0.99% 7.26% 0.99% 4.33% 4.33% PT Wijaya Karya (Persero) Tbk Koperasi Karya Mitra Satya 27.42% Yayasan Wijaya Karya 8 April 2014 23.47% Treasury Stock 31 Mar 2017 (IPO) Public 60% 60% Foreign Local 19.7% 17.7% 17.5% 16.5% 19.4% 19.5% 18.9% 18.4% 22.1% 26.0% 29.1% 33.0

  10. Slide 10: Management Team

    Slide 10: Management Team

    MANAGEMENT TEAM Board of Commissioners President Commissioner Gandira Gutawa Sumapraja Commissioner A. Boediono Commissioner Muhammad Chusnufam Board of Directors Commissioner Tumik Kristianingsih President Director Hadian Pramudita Commissioner Herry Trisaputra Zuna Director Mohammad Syafii Indepen

  11. Slide 11: Coverage Area

    Slide 11: Coverage Area

    COVERAGE AREA 14 FACTORIES, 1 MOBILE FACTORY, 6 SALES AREAS & 2 REPRESENTATIVE OFFICES, 3 SUBSIDIARIES, 3 QUARRIES, 1 ASSOCIATE COMPANY Installed Production Capacity is 2.7 million ton per year www.wika-beton.co.id Innovation and Trust 11

  12. Slide 12: Production Facilities

    Slide 12: Production Facilities

    PRODUCTION FACILITIES PRODUCTION FACTORY LAND AREA LINES North Sumatera 5.0 Ha 6 Lampung 6.1 Ha 5 South Lampung 27.3 Ha 3 Bogor 13.2 Ha 8 Karawang 13.8 Ha 4 Subang (Dec 2016) 50.0 Ha - Majalengka 6.5 Ha 3 Boyolali 4.1 Ha 6 BATCHING PLANT Pasuruan 1 6.9 Ha 5 Pasuruan 2 6.0 Ha 2 46 UNIT South Sulawesi

  13. Slide 13: Continuous Innovation

    Slide 13: Continuous Innovation

    CONTINUOUS INNOVATION 10 12 2016 2014 8 PC Cylinder Piles with diameter up • Launching track slab for railway 2009 to 2,000mm and maximum length • Launching Circular Box Girder 6 2004 The first manufacturer to produce PC of 60 meter.Inner Boring System with length up to 80 m The first to produce Big

  14. Slide 14: Type of Product (1/3)

    Slide 14: Type of Product (1/3)

    TYPE OF PRODUCT (1/3) PC POLES PC PILES CONCRETE BRIDGE PC WALL TUNNEL HOLLOW CORE SLAB www.wika-beton.co.id Innovation and Trust 14

  15. Slide 15: Type of Product (2/3)

    Slide 15: Type of Product (2/3)

    TYPE OF PRODUCT (2/3) RAILWAY SLEEPERS HYDRO STRUCTURE BUILDING & HOUSING MARINE STRUCTURE RETAINING WALL CYLINDER PILES www.wika-beton.co.id Innovation and Trust 15

  16. Slide 16: Type of Product (3/3)

    Slide 16: Type of Product (3/3)

    TYPE OF PRODUCT (3/3) POST TENSION INNERBORE QUARRY & CRUSHING PLANT www.wika-beton.co.id Innovation and Trust 16

  17. Slide 17: 2 Industry Overview

    Slide 17: 2 Industry Overview

    @uABETON 2 INDUSTRY OVERVIEW

  18. Slide 18: Innovation and Trust 18

    Slide 18: Innovation and Trust 18

    www.wika-beton.co.id Innovation and Trust 18

  19. Slide 19: Infrastructure Investment Requirement 2015-2019

    Slide 19: Infrastructure Investment Requirement 2015-2019

    INFRASTRUCTURE INVESTMENT REQUIREMENT 2015-2019 LOCAL STATE STATE PRIVATE SECTOR GOVERNMENT OWNED TOTAL BUDGET1 LOCAL3 BUDGET ENTERPRISE2 Road 340.0 200.0 65.0 200.0 805.0 Railway 150.0 - 11.0 122.0 283.0 Sea Transportation4 498.0 - 238.2 163.8 900.0 Air Transportation 85.0 5.0 50.0 25.0 165.0 Land

  20. Slide 20: 3 Business Overview

    Slide 20: 3 Business Overview

    @uABETON E} BUSINESS OVERVIEW

  21. Slide 21: Largest Capacity and Leading Market Share

    Slide 21: Largest Capacity and Leading Market Share

    LARGEST CAPACITY and LEADING MARKET SHARE  Based on internal research, in 2015, there are 23 precast concrete production facilities in Indonesia with total production capacity of 6.5 million ton per year.  WIKA Beton has the biggest production capacity with 35.6% of total production capacity in In

  22. Slide 22: Production Capacity 2008-2018

    Slide 22: Production Capacity 2008-2018

    PRODUCTION CAPACITY 2008-2018  Currently, WIKA Beton’s installed production capacity is approximately 2,7 million ton per year.  WIKA Beton’s installed production capacity is expected to grow 210% from 2008 – 2018. Installed Production Capacity (Million Ton per Year) 3.3 3.0 2.5 2.3 2.2 2.0 1.9 1.

  23. Slide 23: Customers' Profile

    Slide 23: Customers' Profile

    CUSTOMERS’ PROFILE Customers’ Profile Based on Line of Business in  Based on line of business, Infrastructure sector contributed 1Q 2017 (Percentage of New Contract) 72.8% of total WIKA Beton’s new contract in 2016. Industry,  Based on customers’ ownership, private – local companies 5.4% contribut

  24. Slide 24: 4 Strategic Plan

    Slide 24: 4 Strategic Plan

    @uABETON 03 STRATEGIC PLAN

  25. Slide 25: Roadmap Strategic Business Plan

    Slide 25: Roadmap Strategic Business Plan

    ROADMAP STRATEGIC BUSINESS PLAN 2021 2020  Revenue = 11,375 Bn, Profit After Tax = 974 Bn  Additional factory production capacity 150,000 Ton 2019  The expansion of upstream and downstream business  Total CAPEX = 940 Bn  Revenue = 9,424 Bn, Profit After Tax = 797 Bn 2018  Additional factory pr

  26. Slide 26: Financial Planning

    Slide 26: Financial Planning

    FINANCIAL PLANNING Revenue (IDR Bn) Operating Profit (IDR Bn) 11,376 1,337 9,425 1,094 7,954 909 6,549 736 5,118 527 2017 2018 2019 2020 2021 2017 2018 2019 2020 2021 Gross Profit (IDR Bn) Net Income (IDR Bn) 1,580 974 1,299 797 1,081 662 897 521 649 360 2017 2018 2019 2020 2021 2017 2018 2019 2020

  27. Slide 27: Consolidated Statement of Financial Position (2017-2021)

    Slide 27: Consolidated Statement of Financial Position (2017-2021)

    CONSOLIDATED STATEMENT OF FINANCIAL POSITION (2017-2021) (IDR Bn) Assets 2017 2018 2019 2020 2021 Cash and Cash Equivalent 1,144.5 852.4 1,907.1 2,181.8 2,357.3 Account Receivables 669.0 1,255.9 1,416.5 1,678.4 2,025.8 Inventory 688.0 1,858.2 2,259.8 2,671.6 3,220.4 Prepaid Expenses 280.9 529.9 636.

  28. Slide 28: Performance Targets 2017-2021

    Slide 28: Performance Targets 2017-2021

    PERFORMANCE TARGETS 2017-2021 Revenue 2021 11,3 Tn Total Capex 2017-2021 3,6 Tn Profit After Tax 2021 974 Bn www.wika-beton.co.id Innovation and Trust 28

  29. Slide 29: 5 Financial Highlight

    Slide 29: 5 Financial Highlight

    @uABETON 8 FINANCIAL HIGHLIGHT

  30. Slide 30: Order Book & Revenue

    Slide 30: Order Book & Revenue

    ORDER BOOK & REVENUE Total Order Book Vs. Revenue (IDR Million) Order Book 2016 7.517.708 Order Book 2017 5.517.989 Order Book Order Order Book 2013 Book 2014 2015 4.303.959 4.236.771 4.279.812 Order Book 2012 3.693.809 2012 2013 2014 2015 2016 1Q 2017 www.wika-beton.co.id Innovation and Trust 30

  31. Slide 31: Revenue Contribution

    Slide 31: Revenue Contribution

    REVENUE CONTRIBUTION 2011 2012 2013 2014 2015 2016 1Q 2016 1Q 2017 Services 0.9% 0.7% 0.8% 1.5% 2.3% 3.8% 2% 9% Non Centrifugal Product 27.2% 31.2% 38.7% 29.1% 36.9% 41.6% 47% 44% Centrifugal Product 71.9% 68.2% 60.5% 69.4% 60.8% 54.5% 51% 47% Centrifugal Product Non Centrifugal Product Services www

  32. Slide 32: Usage IPO Proceed

    Slide 32: Usage IPO Proceed

    USAGE IPO PROCEED Progress Budget No Subject on Allocation 31 Mar 17 A BUSINESS EXPANSION (85%) 1 Processing of natural materials quarry in Cigudeg, 11% 84.35% Donggala, Boyolali and South Lampung. 2 Development of New Factories in South Lampung, 34% 96.31% Pasuruan, and Kalimantan. 3 Capacity expan

  33. Slide 33: Summary of Income Statement

    Slide 33: Summary of Income Statement

    SUMMARY OF INCOME STATEMENT Revenue (IDR bn) Gross Profit (IDR bn) 3,482 504 3,277 487 2,653 388 2,644 329 2,031 265 1,635 206 733 729 91 102 2011 2012 2013 2014 2015 2016 1Q 2016 1Q 2017 2011 2012 2013 2014 2015 2016 1Q 2016 1Q 2017 Operating Profit (IDR bn) Net Profit (IDR bn) 409 408 322 336 282

  34. Slide 34: Summary of Balance Sheet

    Slide 34: Summary of Balance Sheet

    SUMMARY OF BALANCE SHEET Assets (IDR bn) Liabilities (IDR bn) 5,071 2,611 4,456 4,662 4,110 2,187 2,193 2,172 3,802 1,797 1,845 2,917 1,577 1,409 2,401 1,839 2011 2012 2013 2014 2015 2016 1Q 2016 1Q 2017 2011 2012 2013 2014 2015 2016 1Q 2016 1Q 2017 Equity (IDR bn) Current Ratio (x) & Quick Ratio (x

  35. Slide 35: Financial Ratio & Profitability (1/2)

    Slide 35: Financial Ratio & Profitability (1/2)

    FINANCIAL RATIO & PROFITABILITY (1/2) 14.7 14.9 14.5 13.9 12.6 13.1 12.7 12.5 12.4 12.4 11.4 11.7 11.2 10.3 10.3 10.8 9.8 10.0 8.7 8.8 8.8 9.1 9.0 8.4 8.1 7.3 7.1 6.4 6.5 5.8 2009 2010 2011 2012 2013 2014 2015 2016 1Q 2016 1Q 2017 Gross Profit Margin (%) Operating Profit Margin (%) Net Profit Margin

  36. Slide 36: Financial Ratio & Profitability (2/2)

    Slide 36: Financial Ratio & Profitability (2/2)

    FINANCIAL RATIO & PROFITABILITY (2/2) Debt To Equity Ratio (DER) 3.3 3.0 3.0 Gearing Ratio (Equity) 0.74 1.0 0.9 1.1 0.8 0.7 2011 2012 2013 2014 2015 2016 1Q 2016 1Q 2017 0.27 0.24 0.27 0.32 0.20 0.04 0.03 2011 2012 2013 2014 2015 2016 1Q 2016 1Q 2017 www.wika-beton.co.id Innovation and Trust 36

  37. Slide 37: Statement of Consolidated Cash Flow

    Slide 37: Statement of Consolidated Cash Flow

    STATEMENT OF CONSOLIDATED CASH FLOW (IDR Million) Description 2011 2012 2013 2014 2015 2016 1Q 2017 Operating Activities 135,160 293,848 123,764 192,010 458,415 (79,247) (184,661) Investing Activities (162,239) (174,250) (454,305) (790,214) (472,119) (482,388) (113,143) Financing Activities (34,141)

  38. Slide 38: 6 Company Updates

    Slide 38: 6 Company Updates

    @uABETON (3 comPANY UPDATES

  39. Slide 39: Analyst Report

    Slide 39: Analyst Report

    ANALYST REPORT Target Price No Analyst Company Recommendation Date (IDR) 1 Maria Renata Danareksa Sekuritas 1,100 Buy 30 Mar 2017 2 Maxi Liesyaputra BNI Securities 1,020 Buy 14 Mar 2017 3 Akhmad Nurcahyadi Samuel Sekuritas 1,150 Buy 17 Feb 2017 4 Ari Jahja Credit Suisse 1,085 Buy 16 Feb 2017 5 Danny

  40. Slide 40: Stock Performance

    Slide 40: Stock Performance

    STOCK PERFORMANCE PRICE VOLUME (IDR) (Million) www.wika-beton.co.id Innovation and Trust 40

  41. Slide 41: Company Updates: Elevated Railway Project, North Sumatera

    Slide 41: Company Updates: Elevated Railway Project, North Sumatera

    COMPANY UPDATES A. ELEVATED RAILWAY PROJECT – NORTH SUMATERA www.wika-beton.co.id Innovation and Trust 41

  42. Slide 42: Company Updates: Elevated Railway Project, North Sumatera

    Slide 42: Company Updates: Elevated Railway Project, North Sumatera

    COMPANY UPDATES A. ELEVATED RAILWAY PROJECT – NORTH SUMATERA www.wika-beton.co.id Innovation and Trust 42

  43. Slide 43: Company Updates: Semanggi Flyover Revitalization Project

    Slide 43: Company Updates: Semanggi Flyover Revitalization Project

    COMPANY UPDATES B. SEMANGGI FLYOVER REVITALIZATION PROJECT - JAKARTA www.wika-beton.co.id Innovation and Trust 43

  44. Slide 44: Company Updates: Semanggi Flyover Revitalization Project

    Slide 44: Company Updates: Semanggi Flyover Revitalization Project

    COMPANY UPDATES B. SEMANGGI FLYOVER REVITALIZATION PROJECT - JAKARTA www.wika-beton.co.id Innovation and Trust 44

  45. Slide 45: Company Updates: MRT Project

    Slide 45: Company Updates: MRT Project

    COMPANY UPDATES C. MRT PROJECT www.wika-beton.co.id Innovation and Trust 45

  46. Slide 46: Company Updates: Trans Sulawesi Railway Project

    Slide 46: Company Updates: Trans Sulawesi Railway Project

    COMPANY UPDATES D. TRANS SULAWESI RAILWAY PROJECT www.wika-beton.co.id Innovation and Trust 46

  47. Slide 47: Company Updates: JLNT Seskoal Project

    Slide 47: Company Updates: JLNT Seskoal Project

    COMPANY UPDATES E. JLNT SESKOAL PROJECT www.wika-beton.co.id Innovation and Trust 47

  48. Slide 48: Company Updates: Soekarno Hatta Airport Access Project

    Slide 48: Company Updates: Soekarno Hatta Airport Access Project

    COMPANY UPDATES F. SOEKARNO HATTA AIRPORT ACCESS PROJECT, JAKARTA www.wika-beton.co.id Innovation and Trust 48

  49. Slide 49: Company Updates: Teluk Lamong Project

    Slide 49: Company Updates: Teluk Lamong Project

    COMPANY UPDATES G. TELUK LAMONG PROJECT, EAST JAVA www.wika-beton.co.id Innovation and Trust 49

  50. Slide 50: Company Updates: Quarry Cigudeg, West Java

    Slide 50: Company Updates: Quarry Cigudeg, West Java

    COMPANY UPDATES H. QUARRY CIGUDEG – WEST JAVA • Land area 36,7 Ha • Project’s working time 6 months • Prod Capacity 350 ton per hour • Starting operation on 29 Jan 2015 • Initial Investment : Rp 113bn www.wika-beton.co.id Innovation and Trust 50

  51. Slide 51: Company Updates: South Lampung Factory (1/2)

    Slide 51: Company Updates: South Lampung Factory (1/2)

    COMPANY UPDATES I. SOUTH LAMPUNG FACTORY (1/2) • Land area 67 Ha - Quarry 41 Ha - Plant Area 26 Ha • Project Progress : - Machinery Instalation & Jetty expansion in progress • Production : Cylinder Pile dia up to 2 meters, Lenght up to 100 meters. • 1st phase : 2 Plant for Cylinder Pile • 2nd phase

  52. Slide 52: Company Updates: South Lampung Factory (2/2)

    Slide 52: Company Updates: South Lampung Factory (2/2)

    COMPANY UPDATES I. SOUTH LAMPUNG FACTORY (2/2) www.wika-beton.co.id Innovation and Trust 52

  53. Slide 53: Company Updates: Carolus Hospital Project (1/2)

    Slide 53: Company Updates: Carolus Hospital Project (1/2)

    COMPANY UPDATES J. CAROLUS HOSPITAL PROJECT (1/2) www.wika-beton.co.id Innovation and Trust 53

  54. Slide 54: Company Updates: Carolus Hospital Project (2/2)

    Slide 54: Company Updates: Carolus Hospital Project (2/2)

    COMPANY UPDATES J. CAROLUS HOSPITAL PROJECT (2/2) www.wika-beton.co.id Innovation and Trust 54

  55. Slide 55: Company Updates: North Jakarta Coastal Protection Project

    Slide 55: Company Updates: North Jakarta Coastal Protection Project

    COMPANY UPDATES K. NORTH JAKARTA COASTAL PROTECTION PROJECT www.wika-beton.co.id Innovation and Trust 55

  56. Slide 56: Company Updates: Manado Interchange Project

    Slide 56: Company Updates: Manado Interchange Project

    COMPANY UPDATES L. MANADO INTERCHANGE PROJECT www.wika-beton.co.id Innovation and Trust 56

  57. Slide 57: Company Updates: Holtecamp Bridge Project, Jayapura

    Slide 57: Company Updates: Holtecamp Bridge Project, Jayapura

    COMPANY UPDATES M. HOLTECAMP BRIDGE PROJECT - JAYAPURA www.wika-beton.co.id Innovation and Trust 57

  58. Slide 58: Company Updates: Established Associate Company

    Slide 58: Company Updates: Established Associate Company

    COMPANY UPDATES N. ESTABLISHED ASSOCIATE COMPANY www.wika-beton.co.id Innovation and Trust 58

  59. Slide 59: Company Updates: Subang Factory

    Slide 59: Company Updates: Subang Factory

    COMPANY UPDATES O. SUBANG FACTORY www.wika-beton.co.id Innovation and Trust 59

  60. Slide 60: Company Updates: The Hive Office, Jakarta

    Slide 60: Company Updates: The Hive Office, Jakarta

    COMPANY UPDATES P. THE HIVE OFFICE - JAKARTA www.wika-beton.co.id Innovation and Trust 60

  61. Slide 61: Awards & Achievement (1/2)

    Slide 61: Awards & Achievement (1/2)

    AWARDS & ACHIEVEMENT (1/2) The Best in Building and Managing Corporate Image 2016 from Tempo Group & Frontier Top 50 Public Companies from Indonesian Institute for Corporate Directorship Fastest Growing Issuer 2016 - Cement Most Valuable Indonesian Brands Category from 2016 from Brand Finance Plc Ma

  62. Slide 62: Awards & Achievement (2/2)

    Slide 62: Awards & Achievement (2/2)

    AWARDS & ACHIEVEMENT (1/2) Rating History : July 2013 idA+/Stable * July 2014 idA+/Stable * July 2015 idA+/Stable July 2016 idA+/Stable for corporate and *MTN Morgan Stanley Capital Index Started on 07 Nov 2014 - now August 2015 – January 2016 www.wika-beton.co.id Innovation and Trust 62

  63. Slide 63: End of Presentation

    Slide 63: End of Presentation

    END OF PRESENTATION 63

  64. Slide 64: PT Wijaya Karya Beton Tbk

    Slide 64: PT Wijaya Karya Beton Tbk

    PT WIJAYA KARYA BETON Tbk Head Office |. Raya Jatiwaringin no. 54 Pondok Gede-Bekasi 17411 Contact Information Phone (+6221) 84973363 Fax (+6221) 84973391, 84973392 Email wbcc@wika-beton.co.id marketing@wika-beton.co.id 64

Source: company website

More decks from PT Wijaya Karya Beton Tbk

All 37 PT Wijaya Karya Beton Tbk decks