PT Wijaya Karya Beton Tbk · IDX:WTON

PT Wijaya Karya Beton Tbk — Q3 2016 Earnings Presentation

57 slides from PT Wijaya Karya Beton Tbk's earnings presentation, 2016

  1. Slide 1: PT Wijaya Karya Beton Tbk 3Q 2016 Results

    Slide 1: PT Wijaya Karya Beton Tbk 3Q 2016 Results

    PT Wijaya Karya Beton Tbk 3Q 2016 Results 1

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER The information that follows is a presentation of general background information about PT Wijaya Karya Beton Tbk (the “Company” or “WIKA Beton”) prepared by the Company. This presentation has been prepared for information purposes only. None of the information appearing in this presentati

  3. Slide 3: Table of Contents

    Slide 3: Table of Contents

    TABLE OF CONTENTS 1 COMPANY PROFILE 2 INDUSTRY OVERVIEW 3 BUSINESS OVERVIEW 4 FINANCIAL HIGHLIGHT 5 COMPANY UPDATES 3

  4. Slide 4: 1 Company Profile

    Slide 4: 1 Company Profile

    @uABETON denvoveiti ton and Tins COMPANY PROFILE ~~

  5. Slide 5: Vision, Mission & Core Value

    Slide 5: Vision, Mission & Core Value

    VISION, MISSION & CORE VALUE Vision “To be the foremost company in the precast concrete product industry” Mission  To be the market leader in precast concrete industry in Southeast Asia  To provide excellent services to customers on the fulfillment of quality, time and price  To apply management

  6. Slide 6: Key Milestone (1/2)

    Slide 6: Key Milestone (1/2)

    KEY MILESTONE (1/2) WIKA Beton As Subsidiary of WIKA 1988 • Established new concrete factory in Binjai, North Sumatera (6th factory). • New products: bridge and drainage concretes. 1981 - 1984 • Established new concrete factories in Pasuruan (2nd factory), Boyolali (3rd factory), and Majalengka (4th

  7. Slide 7: Key Milestone (2/2)

    Slide 7: Key Milestone (2/2)

    KEY MILESTONE (2/2) WIKA Beton As Subsidiary of WIKA 2014 • Listed company at IDX 08 April 2014. • Aquisition PT Citra Lautan Teduh in Batam. • Unit Inner Boring. 2012 • Established subsidiary, WIKA Kobe (9th factory). • Unit post tensioning. 2015 • Starting operate South Lampung Factory. 2010 • Lau

  8. Slide 8: Corporate Structure (1/2)

    Slide 8: Corporate Structure (1/2)

    CORPORATE STRUCTURE (1/2) WTON WTON WTON 51.0% 99.5% 60.0% 8

  9. Slide 9: Corporate Structure (2/2)

    Slide 9: Corporate Structure (2/2)

    CORPORATE STRUCTURE (2/2) 11.22% 0.99% 7.72% 0.99% 4.33% 4.33% PT Wijaya Karya (Persero) Tbk Koperasi Karya Mitra Satya 26.96% Yayasan Wijaya Karya 8 April 2014 23.47% Treasury Stock 30 Sept 2016 (IPO) Public 60% 60% 33.0% 36.4… 33.0% 22.1% 26.0% 19.7% 17.7% 17.5% 19.3% Foreign Local 67.0% 63.6% 67.

  10. Slide 10: Management Team

    Slide 10: Management Team

    MANAGEMENT TEAM Board of Commissioners President Commissioner Gandira Gutawa Sumapraja Commissioner A. Boediono Commissioner Muhammad Chusnufam Commissioner Tumik Kristianingsih Independent Commissioner Asfiah Mahdiani Independent Commissioner Priyo Suprobo Board of Directors President Director Wilf

  11. Slide 11: Coverage Area

    Slide 11: Coverage Area

    COVERAGE AREA 12 FACTORIES, 1 MOBILE FACTORY, 6 SALES AREAS, 2 REPRESENTATIVE OFFICES, 3 SUBSIDIARY, 3 QUARRY NORTH SUMATERA PEKANBARU REPRESENTATIVE OFFICE Factory Selling Area PT CITRA LAUTAN TEDUH Quarry BALIKPAPAN Representative Office REPRESENTATIVE OFFICE SELLING AREA I Subsidiary PALU QUARRY

  12. Slide 12: Production Facilities

    Slide 12: Production Facilities

    PRODUCTION FACILITIES PRODUCTION FACTORY LAND AREA LINES North Sumatera 5.0 Ha 6 Lampung 6.1 Ha 5 South Lampung 27.3 Ha 3 Bogor 13.2 Ha 8 Karawang 13.8 Ha 4 Majalengka 6.5 Ha 3 Boyolali 4.1 Ha 6 BATCHING PLANT Pasuruan 1 6.9 Ha 5 6.0 Ha 2 46 UNIT Pasuruan 2 South Sulawesi 1 3.0 Ha 3 South Sulawesi 2

  13. Slide 13: Continuous Innovation

    Slide 13: Continuous Innovation

    CONTINUOUS INNOVATION 2014 2009 2016 PC Cylinder Piles with diameter up 2004 The first manufacturer to produce PC • Launching PC WALL with length to 2,000mm and maximum length The first to produce Big PC Piles with diameter of 800mm, up to 24.6 m of 60 meter.Inner Boring System Segmental Box Girder.

  14. Slide 14: Type of Product (1/3)

    Slide 14: Type of Product (1/3)

    TYPE OF PRODUCT (1/3) PC POLES PC PILES CONCRETE BRIDGE PC WALL TUNNEL HOLLOW CORE SLAB 14

  15. Slide 15: Type of Product (2/3)

    Slide 15: Type of Product (2/3)

    TYPE OF PRODUCT (2/3) RAILWAY SLEEPERS HYDRO STRUCTURE BUILDING & HOUSING MARINE STRUCTURE RETAINING WALL CYLINDER PILES 15

  16. Slide 16: Type of Product (3/3)

    Slide 16: Type of Product (3/3)

    TYPE OF PRODUCT (3/3) POST TENSION INNERBORE QUARRY & CRUSHING PLANT 16

  17. Slide 17: 2 Industry Overview

    Slide 17: 2 Industry Overview

    (uc) BETON 2. INDUSTRY overview| 17

  18. Slide 18: Infrastructure development plans

    Slide 18: Infrastructure development plans

    Jalan baru Jalan tol Pemesnaraan jalan Pembangunan Pengadaan Pengembangan Bandara untuk pelayanan Pembangunan Pengadaan Barang Perints Pengagaan Pengadaan Pembangunan Jalur Gi Jawa, Sumatera, Sulawesi dan Kalimantan terdiri dari: KA Antar kota 2.159 Km. KA Perkotaan 1.099 Km Pembangunan Pelabuhan Pe

  19. Slide 19: Infrastructure Investment Requirement 2015-2019

    Slide 19: Infrastructure Investment Requirement 2015-2019

    INFRASTRUCTURE INVESTMENT REQUIREMENT 2015-2019 LOCAL STATE STATE PRIVATE SECTOR GOVERNMENT OWNED TOTAL BUDGET1 LOCAL3 BUDGET ENTERPRISE2 Road 340.0 200.0 65.0 200.0 805.0 Railway 150.0 - 11.0 122.0 283.0 Sea Transportation4 498.0 - 238.2 163.8 900.0 Air Transportation 85.0 5.0 50.0 25.0 165.0 Land

  20. Slide 20: 3 Business Overview

    Slide 20: 3 Business Overview

    (uc) BETON Tcaovels ton and Trust E} BUSINESS OVERVIEW > 21

  21. Slide 21: Largest Capacity and Leading Market Share

    Slide 21: Largest Capacity and Leading Market Share

    LARGEST CAPACITY and LEADING MARKET SHARE  Based on internal research, in 2015, there are 23 precast concrete production facilities in Indonesia with total production capacity of 6.5 million ton per year.  WIKA Beton has the biggest production capacity with 35.6% of total production capacity in In

  22. Slide 22: Production Capacity 2008 - 2018

    Slide 22: Production Capacity 2008 - 2018

    PRODUCTION CAPACITY 2008 - 2018  Currently, WIKA Beton’s installed production capacity is approximately 2,5 million ton per year.  WIKA Beton’s installed production capacity is expected to grow 210% from 2008 – 2018. Installed Production Capacity (Million Ton per Year) 3.3 3.0 2.5 2.3 2.2 2.0 1.9

  23. Slide 23: Customers' Profile

    Slide 23: Customers' Profile

    CUSTOMERS’ PROFILE Customers’ Profile Based on Line of Business in  Based on line of business, Infrastructure sector contributed 49% of total 3Q 2016 (Percentage of New Contract) WIKA Beton’s revenue in 2015. Property,  Based on customers’ ownership, private – local companies contributed 8.23% Min

  24. Slide 24: 4 Financial Highlight

    Slide 24: 4 Financial Highlight

    (uc) BETON 4 FINANCIAL AIcHuGHT| oie ree ee Sai 25

  25. Slide 25: Order Book & Revenue

    Slide 25: Order Book & Revenue

    ORDER BOOK & REVENUE Total Order Book Vs. Revenue (IDR Million) Order Book Order Book Order Book 3Q 2016 Order Book 2013 2015 4.579.570 2014 4.303.959 4.236.771 4.279.812 Order Book 2012 3.693.809 New Order New Order Book 2016 New Order Book 2015 2.983.985 Order Book Book 2014 3.481.182 2011 New Ord

  26. Slide 26: Revenue Contribution

    Slide 26: Revenue Contribution

    REVENUE CONTRIBUTION 2011 2012 2013 2014 2015 3Q 2015 3Q 2016 Services 1% 1% 1% 2% 2% 2% 3% Non Centrifugal Product 27% 31% 39% 29% 37% 29% 42% Revenue 2015 Centrifugal Product 72% 68% 60% 69% 61% 69% 54% 2,652,622 Centrifugal Product Non Centrifugal Product Services 27

  27. Slide 27: Usage IPO Proceed

    Slide 27: Usage IPO Proceed

    USAGE IPO PROCEED Progress Budget No Subject on Allocation 30 Sept 16 A BUSINESS EXPANSION (85%) 1 Processing of natural materials quarry in Cigudeg, 11% 83.67% Donggala, Boyolali and South Lampung. 2 Development of New Factories in South Lampung, 34% 82.35% Pasuruan, and Kalimantan. 3 Capacity expa

  28. Slide 28: Summary of Income Statement

    Slide 28: Summary of Income Statement

    SUMMARY OF INCOME STATEMENT Revenue (IDR bn) Gross Profit (IDR bn) 487 3,277 388 2,644 2,653 329 306 2,031 2,242 265 1,635 206 189 1,549 2011 2012 2013 2014 2015 3Q 2015 3Q 2016 2011 2012 2013 2014 2015 3Q 2015 3Q 2016 Operating Profit (IDR bn) Net Profit (IDR bn) 409 322 336 241 231 238 242 179 172

  29. Slide 29: Summary of Balance Sheet

    Slide 29: Summary of Balance Sheet

    SUMMARY OF Assets (IDR bn) BALANCE SHEET Liabilities (IDR bn) 4,456 4,456 3,802 3,799 2,187 2,193 2,071 1,797 2,917 1,577 1,617 2,401 1,409 1,839 2011 2012 2013 2014 2015 3Q 2015 3Q 2016 2011 2012 2013 2014 2015 3Q 2015 3Q 2016 Equity (IDR bn) Current Ratio (x) & Quick Ratio (x) 1.41 1.37 2,385 1.47

  30. Slide 30: Financial Ratio and Profitability (1/2)

    Slide 30: Financial Ratio and Profitability (1/2)

    FINANCIAL RATIO AND PROFITABILITY (1/2) 14.7 14.9 13.1 13.6 12.6 12.7 12.5 12.4 12.2 10.8 11.4 10.8 10.3 10.3 9.8 8.7 8.8 8.8 9.1 9.0 8.4 8.3 7.7 5.8 6.4 6.5 5.5 2009 2010 2011 2012 2013 2014 2015 3Q 2015 3Q 2016 Gross Profit Margin (%) Operating Profit Margin (%) Net Profit Margin (%) Return on Ass

  31. Slide 31: Financial Ratio and Profitability (2/2)

    Slide 31: Financial Ratio and Profitability (2/2)

    FINANCIAL RATIO AND PROFITABILITY (2/2) Debt To Equity Ratio (DER) Gearing Ratio (Equity) 0.74 3.3 3.0 3.0 0.9 0.27 0.7 0.24 0.27 0.26 1.0 3Q 2015 3Q 2016 0.7 0.04 3Q 2015 3Q 2016 0.03 2011 2012 2013 2014 2015 2011 2012 2013 2014 2015 Revenue 2015 2,652,622 33

  32. Slide 32: Statements of Consolidated Cash Flows

    Slide 32: Statements of Consolidated Cash Flows

    STATEMENTS OF CONSOLIDATED CASH FLOWS (IDR Million) Description 2011 2012 2013 2014 2015 1Q 2016 2Q 2016 3Q 2016 Operating Activities 135,160 293,848 123,764 192,010 458,415 (190,981) (96,884) 35,904 Investing Activities (162,239) (174,250) (454,305) (790,214) (472,119) (79,964) (130,562) (36,031) F

  33. Slide 33: 5 Company Updates

    Slide 33: 5 Company Updates

    @uABETON & company upoares | 35

  34. Slide 34: Analyst Report

    Slide 34: Analyst Report

    ANALYST REPORT Target Price No Analyst Company Recomendation Date (IDR) 1 Akhmad Nurcahyadi Samuel Sekuritas 1,150 Buy 12 Oct 2016 2 Theodorus Ariel Lautandhana Securindo 1,400 Buy 23 Aug 2016 3 Maria Renata UOB Kayhian 1,300 Buy 30 Jul 2016 4 Bob Setiadi Mandiri Sekuritas 1,125 Buy 27 Mei 2016 5 Ar

  35. Slide 35: Stock Performance

    Slide 35: Stock Performance

    STOCK PERFORMANCE PRICE VOLUME (IDR) (Million) Revenue 2015 891,272 37

  36. Slide 36: Company Updates: New Mobile Factory - North Sumatera

    Slide 36: Company Updates: New Mobile Factory - North Sumatera

    COMPANY UPDATES A. NEW MOBILE FACTORY – NORTH SUMATERA Revenue 2015 891,272 38

  37. Slide 37: Company Updates: Kavling Project - Cawang Jakarta

    Slide 37: Company Updates: Kavling Project - Cawang Jakarta

    COMPANY UPDATES B. KAVLING 2 PROJECT – CAWANG JAKARTA Revenue 2015 891,272 39

  38. Slide 38: Company Updates: MRT Project

    Slide 38: Company Updates: MRT Project

    COMPANY UPDATES C. MRT PROJECT Revenue 2015 891,272 40

  39. Slide 39: Company Updates: Trans Sulawesi Railway Project

    Slide 39: Company Updates: Trans Sulawesi Railway Project

    COMPANY UPDATES D. TRANS SULAWESI RAILWAY PROJECT Revenue 2015 891,272 41

  40. Slide 40: Company Updates: JLNT Seskoal Project

    Slide 40: Company Updates: JLNT Seskoal Project

    COMPANY UPDATES E. JLNT SESKOAL PROJECT Revenue 2015 891,272 42

  41. Slide 41: Company Updates: Soekarno Hatta Airport Access Project

    Slide 41: Company Updates: Soekarno Hatta Airport Access Project

    COMPANY UPDATES F. SOEKARNO HATTA AIRPORT ACCESS PROJECT, JAKARTA Revenue 2015 891,272 43

  42. Slide 42: Company Updates: Teluk Lamong Project, East Java

    Slide 42: Company Updates: Teluk Lamong Project, East Java

    COMPANY UPDATES G. TELUK LAMONG PROJECT, EAST JAVA Revenue 2015 891,272 44

  43. Slide 43: Company Updates: Quarry Cigudeg - West Java

    Slide 43: Company Updates: Quarry Cigudeg - West Java

    COMPANY UPDATES H. QUARRY CIGUDEG – WEST JAVA • Land area 36,7 Ha • Project’s working time 6 months • Prod Capacity 350 ton per hour • Starting operation on 29 Jan 2015 • Initial Investment : Rp 113bn Revenue 2015 891,272 45

  44. Slide 44: Company Updates: South Lampung Factory (1/2)

    Slide 44: Company Updates: South Lampung Factory (1/2)

    COMPANY UPDATES I. SOUTH LAMPUNG FACTORY (1/2) • Land area 67 Ha - Quarry 41 Ha - Plant Area 26 Ha • Project Progress : - Machinery Instalation & Jetty expansion in progress • Production : Cylinder Pile dia up to 2 meters, Lenght up to 100 meters. • 1st phase : 2 Plant for Cylinder Pile • 2nd phase

  45. Slide 45: Company Updates: South Lampung Factory (2/2)

    Slide 45: Company Updates: South Lampung Factory (2/2)

    COMPANY UPDATES J. SOUTH LAMPUNG FACTORY (2/2) Revenue 2015 891,272 47

  46. Slide 46: Company Updates: Surabaya - Mojokerto Toll Road

    Slide 46: Company Updates: Surabaya - Mojokerto Toll Road

    COMPANY UPDATES K. SURABAYA – MOJOKERTO TOLL ROAD Revenue 2015 891,272 48

  47. Slide 47: Company Updates: Section IV Toll Road - Makassar

    Slide 47: Company Updates: Section IV Toll Road - Makassar

    COMPANY UPDATES L. SECTION IV TOLL ROAD - MAKASSAR Revenue 2015 891,272 49

  48. Slide 48: Company Updates: Carolus Hospital Project

    Slide 48: Company Updates: Carolus Hospital Project

    COMPANY UPDATES M. CAROLUS HOSPITAL PROJECT Revenue 2015 891,272 50

  49. Slide 49: Company Updates: Carolus Hospital Project (2/2)

    Slide 49: Company Updates: Carolus Hospital Project (2/2)

    COMPANY UPDATES M. CAROLUS HOSPITAL PROJECT (2/2) Revenue 2015 891,272 51

  50. Slide 50: Company Updates: North Jakarta Coastal Protection Project

    Slide 50: Company Updates: North Jakarta Coastal Protection Project

    COMPANY UPDATES N. NORTH JAKARTA COASTAL PROTECTION PROJECT Revenue 2015 891,272 52

  51. Slide 51: Company Updates: Manado Interchange Project

    Slide 51: Company Updates: Manado Interchange Project

    COMPANY UPDATES O. MANADO INTERCHANGE PROJECT Revenue 2015 891,272 53

  52. Slide 52: Company Updates: Holtecamp Bridge Project - Jayapura

    Slide 52: Company Updates: Holtecamp Bridge Project - Jayapura

    COMPANY UPDATES P. HOLTECAMP BRIDGE PROJECT - JAYAPURA Revenue 2015 891,272 54

  53. Slide 53: Company Updates: Extraordinary General Meeting 20 July 2016

    Slide 53: Company Updates: Extraordinary General Meeting 20 July 2016

    COMPANY UPDATES Q. EXTRAORDINARY GENERAL MEETING OF SHAREHOLDERS, 20 July 2016 55

  54. Slide 54: Awards & Achievement (1/2)

    Slide 54: Awards & Achievement (1/2)

    AWARDS & ACHIEVEMENT (1/2) Best Employers 2015 from AON Hewitt Indonesia Best in Building and Managing Corporate Image Category Precast Concrete Product Manufacture from Frontier Consulting Group 2015\ Fastest Growing Issuer 2016 - Cement Category from Majalah Warta Ekonomi Indonesia Revenue 2015 89

  55. Slide 55: Awards & Achievement (2/2)

    Slide 55: Awards & Achievement (2/2)

    AWARDS & ACHIEVEMENT (2/2) Rating History : July 2013 idA+/Stable July 2014 idA+/Stable July 2015 idA+/Stable July 2016 idA+/Stable for corporate and MTN Morgan Stanley Capital Index Revenue Started on 07 Nov 2014 - now August 2015 – January 2016 2015 891,272 57

  56. Slide 56: End of Presentation

    Slide 56: End of Presentation

    WiABETON END OF PRESENTATION

  57. Slide 57: PT Wijaya Karya Beton Tbk

    Slide 57: PT Wijaya Karya Beton Tbk

    PT WIJAYA KARYA BETON Tbk Head Office \. Raya Jatiwaringin no. 54 Pondok Gede-Bekasi 17411 Contact Information Phone (+6221) 84973363 Fax (+6221) 84973391, 84973392 Email wbcc@wika-beton.co.id marketing@wika-beton.co.id By)

Source: company website