Stellar Africagold, Inc. · TSXV:SPX

Stellar Africagold — Investor Presentation (April 2025)

25 slides from Stellar Africagold's investor presentation, April 2025

  1. Slide 1: Stellar AfricaGold Inc.

    STELLAR AFRICAGOLD INC. Exploring For Gold In Morocco And Côte D’Ivoire - Africa TSX-V : SPX April 2025

  2. Slide 2: Legal Disclaimer and Qualifying Person

    LEGAL DISCLAIMER AND QUALIFYING PERSON The technical content of this presentation has been reviewed and approved by Mr.Yassine Belkabir, MScDIC, Ceng, MIMMM, a Stellar director and a Qualified Person as defined in NI 43-101. All information included in this presentation, including any information as

  3. Slide 3: Stellar AfricaGold at a Glance

    STELLAR AFRICAGOLD AT A GLANCE Advancing a New Gold Discovery in Morocco and Greenfields Exploration in Côte D’Ivoire New Gold Discovery in Morocco: Trenches and a limited RC drill program has returned results Notable Mining Operators in of 3.5 g/t Au over 155.7m, 4.67 g/t Au over 14m, 4.55 g/t Au o

  4. Slide 4: Management and Directors

    MANAGEMENT AND DIRECTORS A Team with Extensive Experience in Africa JOHN CUMMING | EXECUTIVE CHAIRMAN YASSINE BELKABIR | DIRECTOR • Former Executiv e Vice- Pre si de nt and CFO of Merrex Gold Inc. with 30+ • Founder and managing partner of Africa n Bureau of Mini ng Consu lta nt s years in the minin

  5. Slide 5: Corporate Snapshot

    CORPORATE SNAPSHOT CAPITAL STRUCTURE SHARE OWNERSHIP Capitalization Insider 19% Basic Shares Outstanding As of April 12, 2025 41.00M Options - 1.2M @$0.065 (exp. Sep 17, 2029) 1.2M Options - 1.92M @$0.07 (exp. Jul 31, 2029) 0.92M Warrants - 12M @$0.08 (exp. Sep 17, 2024) - C$96K Total Redemption 12.

  6. Slide 6: Morocco

    Mining Corporate Tax 32% MOROCCO Free Carried Interest NIL Royalties 0% A Mining Friendly Jurisdiction at the Crossroads of Global Trade Mining Permit (Renewable) 10 yrs Strong Mining Industry Growing Interest in & Export Contributor Gold Exploration  Mining GDP reach ~US$3B in 2023, 52% increase s

  7. Slide 7: Morocco – Tichka Est Gold Project

    MOROCCO – TICHKA EST GOLD PROJECT Partnering with ONYHM to Develop a New Discovery • Earn-in agreement with ONHYM for Tichka Est property (Occidental High Atlas Region) signed on August 18, 2020; and renewed on January 28, 2025. Exploration requirement US$2.39M (C$3.5M) over three years to earn 85%.

  8. Slide 8: Three Gold Bearing Zones Identified Already with Regional Upside

    MOROCCO – TICHKA EST GOLD PROJECT Three Gold Bearing Zones Identified Already with Regional Upside • Zone A: N350° trending gold structure extending over 450 meters along strike • Lies along shear zone at the contact of a dolerite dyke and a schist unit and is injected by quartz-ankerite veins and v

  9. Slide 9: Excellent First Pass Trenching and Drilling Results

    MOROCCO – TICHKA EST GOLD PROJECT ZONE B Excellent First Pass Trenching and Drilling Results • In the first 2022 campaign, 20 RC holes totalling 1,182 meters were completed • Five holes contained significant intersections. Highlights include: • 3.71 g/t Au over 9 meters • 3.03 g/t Au over 6 meters •

  10. Slide 10: Takeaways from First Drill Campaign

    MOROCCO – TICHKA EST TAKEAWAYS FROM FIRST DRILL CAMPAIGN Better Understanding of Geology to Lead to Further Growth Conclusions: • As a result of ongoing exploration, the geological model was revised, & most holes were drilled sub-parallel to the newly interpreted mineralized structure associated wit

  11. Slide 11: Côte d'Ivoire

    Mining Corporate Tax 25% CÔTE D’IVOIRE Free Carried Interest 10% Mining Royalties 3-6% of Sales The Hottest Jurisdiction in Africa for Gold Discoveries Mining Permit (Renewable) 10 yrs Significant Growth & Stable & Secure Opportunities in Mining Environment for Mining  Recent discovery of a signifi

  12. Slide 12: Côte d'Ivoire – Zuénoula Gold Project

    CÔTE D’IVOIRE – ZUÉNOULA GOLD PROJECT A Newly Granted License Along Major Gold Bearing Regional Structure • Zuénoula was granted in Q2 2024 and is valid for 4 years • This can be extended a further 3 + 3 years with renewals • The permit is along the same structural trend that hosts Zhaojin’s (Previo

  13. Slide 13: Stellar AfricaGold Inc. Contact

    STELLAR AFRICAGOLD INC. 4908 Pine Crescent For More Information Contact: Vancouver, British Columbia J. Francois Lalonde V6M 3P6 e: lalondejf@stellarafricagold.com e:cumming@stellarafricagold.com TSX-V : SPX StellarAfricaGold.com

  14. Slide 14: Appendix

    STELLAR AFRICAGOLD INC. APPENDIX The technical content of this presentation has been reviewed and approved by Yassine Belkabir, MScDIC, CEng, MIMMM, a Stellar director and a Qualified Person as defined in NI 43- 101.

  15. Slide 15: Stream Sediment Anomalism

    MOROCCO – TICHKA EST STREAM SEDIMENT ANOMALISM Several Zones of Metal Anomalism That Require Follow-up Metal anomalism in stream sediments across the project and location of identified and sampled main “structures” thus far. StellarAfricaGold.com TSX-V : SPX 15

  16. Slide 16: Highlight Trenching Results

    MOROCCO – TICHKA EST HIGHLIGHT TRENCHING RESULTS Excellent Grades and Widths From Initial Trenching ⎼Trench 1A: 0.97 g/t Au over 1 meters ⎼Trench 2A: 3.36 g/t Au over 10 meters Zone A ⎼Trench 3A: 1.18 g/t Au over 6 meters Highlights ⎼Trench 4A: 1.80 g/t Au over 4 meters ⎼Trench 5A: 1.85 g/t Au over

  17. Slide 17: Trenching and Drilling Results

    MOROCCO – TICHKA EST TRENCHING AND DRILLING RESULTS 545 g*m Mechanical Surface Trench That is Open For Expansion PHOTO OF THE mechanical trench GRADING 3.5 G/T OVER 155.7 METERS Légende Mineralisation Piste Sondage Tranchée Tranchée a faire et a cartographier si non faite avec l'accès aux sondages 1

  18. Slide 18: First Drill Campaign Limitations

    MOROCCO – TICHKA EST FIRST DRILL COMPAIGN LIMITATIONS New Geological Understanding and Drill Campaign Limitations Means Best Surface Mineralization Remains Open for Expansion • Mis-interpreted geological model: at the beginning of the campaign, geologist interpreted a NE-SW gold mineralization along

  19. Slide 19: Regional Exploration

    MOROCCO – TICHKA EST REGIONAL EXPLORATION Regional Upside Away from the Initial Three Structures Discovery in 2022/2023 Following completion of stream sediment, Stellar interpreted multiple occurrences of gold structures subsequently verified by a team of geologists StellarAfricaGold.com TSX-V : SPX

  20. Slide 20: Zone 1 Rock Sampling

    MOROCCO – TICHKA EST ZONE 1 ROCK SAMPLING 20 samples were collected from primary structures, dykes, faults and oxidized zones. Four families : • Brechified primary structure with copper sulfide (chalcopyrite), copper oxide (malachite) and iron oxide (Figure A) – openning at depth. • Ankerite-filled

  21. Slide 21: Zone 2 Rock Sampling

    MOROCCO – TICHKA EST ZONE 2 ROCK SAMPLING Four families of structures: • Primary structures filled with Calcite, Ankerite and Iron Oxides, (Figure A) • Andesitic Dykes with openings of Quartz, Ankerite, Traces of Sulfides; Pyrite and Iron Oxides. • Copper sulfides and oxides. This family is parallel

  22. Slide 22: Zone 3 and 4 Rock Sampling

    MOROCCO – TICHKA EST ZONE 3 AND 4 ROCK SAMPLING Zone 3 comprises Two families of structures Zone 4 comprises Three families of structures • Quartz and calcite structures with traces of galena. It is • Primary structure in a crushed zone (eastern extension oriented N20 with an almost vertical dip and

  23. Slide 23: Zone 5 Rock Sampling

    MOROCCO – TICHKA EST ZONE 5 ROCK SAMPLING Zone 5 corresponds to the corridor of structure C. It comprises Two families of structures: • Opening structures filled with Quartz and Iron oxides hosted in siltstones (Figure A). • Ankerite and iron oxide structure to the South of structure C, this structu

  24. Slide 24: Zone 6 Rock Sampling

    MOROCCO – TICHKA EST ZONE 6 ROCK SAMPLING Three families of structures: • Structures with ankerite, quartz, sulphides (pyrite and arsenopyrite) and iron oxide in a siltstone wall (Figure A). • Quartz and iron oxide openings in the siltstones (Figure B). • Zones of crushed faults filled with quartz,

  25. Slide 25: Interpretation and Discussion

    MOROCCO – TICHKA EST INTERPRETATION AND DISCUSSION • The results of Stream sediment and rock sampling led to the discovery of several mineralized structures, generally oriented E-W with a steep dip towards the north. These structures are embedded in Cambrian carbonate siltstones. These ore bodies ar

Stellar AfricaGold — Investor Presentation (April 2025) on 6ix