Harvest Natural Resources Inc

Harvest Natural Resources — Proxy Contest (December 2006)

21 slides from Harvest Natural Resources's proxy contest presentation, Dec 1, 2006

  1. Slide 1: Proxy Discussion December 2006

    NYSE: HNR www.harvestnr.com PROXY DISCUSSION December 2006

  2. Slide 2: Forward-looking statements and cautionary note

    Certain statements in this presentation are forward-looking and are based upon Harvest's current belief as to the outcome and timing of future events. All statements other than statements of historical facts including capital expenditures, increases in oil and gas production, Harvest's outlook on oi

  3. Slide 3: Harvest Venezuela

    HARVEST VENEZUELA

  4. Slide 4: Background

    BACKGROUND 1992 Harvest Vinccler (HVSCA) awarded SMU operating service agreement through July 2012 Service fee based oil pricing January 2005 Drilling program suspended by PDVSA March 2006 HVSCA signs MOU for conversion to mixed company (Petrodelta) HNR 32%, Vinccler 8%, CVP 60% 20-year contract Mar

  5. Slide 5: Summary of Harvest Venezuela

    SUMMARY OF HARVEST VENEZUELA Successful re-development of South Monagas Unit (SMU) Operated by Harvest since 1992 1992 proved reserves of 18 MMBbls Produced 113 MMBbls, 124 MMBoe since 1992 Proved reserves of 105 MMBbls, 128 MMBoe remain Applied current technologies to improve recovery Created skill

  6. Slide 6: South Monagas Fields

    SOUTH MONAGAS FIELDS Uracoa, Bombal and Tucupita fields Operating organization of 200 employees, 99% Venezuelan 60,000 Bbl/d oil plant (UM2) and 90 Mcf/d gas treating 30,000 Bbl/d oil plant (Tucupita) Oil and gas export pipelines connected to PDVSA network This map highlights the South Monagas Unit.

  7. Slide 7: History of Harvest in Venezuela

    HISTORY OF HARVEST IN VENEZUELA Successful re-development of South Monagas Unit (SMU) Fields abandoned by Majors and PDVSA Discovered in 1937 through 1962 Abandoned in 1987 15 degree API crude Harvest designed and built new infrastructure for 60,000 Bbl/d and 90 MMcf/d based on Harvest Field Redevel

  8. Slide 8: Isleno, Temblador and El Salto fields

    Isleno, Temblador and El Salto fields Same geology and reservoirs as SMU Oil gravity from 8° to 23° API Minimal development activity in last 20 years Similar to South Monagas in 1992 NEW FIELDS TO BE AWARDED This map highlights the South Monagas Unit and the three new properties. The field comprisin

  9. Slide 9: Harvest Studies on New Fields

    HARVEST STUDIES ON NEW FIELDS Extensive work by Harvest Studies began in 1997 on Isleno and Temblador fields Signed MOU in 2003 with PDVSA for study of Temblador and El Salto fields Presented formal development proposals to PDVSA Studies Isleno Temblador El Salto Duration 1997 - present 1997 - prese

  10. Slide 10: Reserves Comparison

    RESERVES COMPARISON Unrisked (MMBoe) Unrisked (MMBoe) Unrisked (MMBoe) Proved Probable Possible Operating Service Agreement Reserves at April 1st (includes proved undeveloped reserves) 90 - - Net to Harvest 72 - - Petrodelta Mixed Company Unrisked reserves at April 1st (gross) 210 145 344 Net to Har

  11. Slide 11: SMU

    SMU HVSCA acquired the rights to SMU in 1992 Operating service agreement (1992-2012) 18 MMBbls proved reserves in 1992 Oil price averaged 47% of WTI Historical performance Produced 124 MMBoe to April 1st 128 MMBoe proved reserves remain Improved recovery Horizontal drilling Effective well completion

  12. Slide 12: Isleno

    ISLENO Discovered in 1953 2-D seismic available over a portion of the fields 7 appraisal wells drilled confirming commercial oil deposits Located 7 km from existing SMU infrastructure Unrisked probable reserves of 20 MMBoe, 4 MMBoe net to Harvest Unrisked possible reserves of 30 MMBoe, 6 MMBoe net t

  13. Slide 13: Temblador

    TEMBLADOR Discovered in 1936 Developed in 1940s and 1950s Produced 129 MMBoe 3-D seismic available Unrisked proved reserves of 14 MMBoe, 3 MMBoe net to Harvest Unrisked probable reserves of 17 MMBoe, 4 MMBoe net to Harvest Unrisked possible reserves of 117 MMBoe, 25 MMBoe net to Harvest Based on Ryd

  14. Slide 14: El Salto

    EL SALTO Discovered in 1936 31 appraisal wells identified 9 productive structures 6 producing formations 3-D seismic available over 1/3 of the field Unrisked proved reserves of 68 MMBoe, 15 MMBoe net to Harvest Unrisked probable reserves of 108 MMBoe, 23 MMBoe net to Harvest Unrisked possible reserv

  15. Slide 15: 2007 Petrodelta Development Plan

    2007 PETRODELTA DEVELOPMENT PLAN Objectives Rapidly increase production at SMU in 2007 New field appraisal program Use benefits of Petrodelta scale to maximize capital efficiency Drilling programs 25 drilling locations identified at SMU 3 drilling rigs for Petrodelta 2 at SMU 1 for new field apprais

  16. Slide 16: Scale - Petrodelta

    SCALE - PETRODELTA Unrisked reserves (gross) Proved 210 MMBoe Probable 145 MMBoe Possible 344 MMBoe Exploration potential Apply modern technologies to improve recoveries Known and proven approach Capital efficiency opportunities Optimize development plan Maximize drilling efficiency Maximize operati

  17. Slide 17: Remaining Steps

    REMAINING STEPS Stockholder approval Meeting scheduled for December 18th Venezuelan government approvals Sign definitive agreements Form Petrodelta

  18. Slide 18: Cash Position

    CASH POSITION September 30 cash $227 Q4 Bolivar borrowing, net 51 Q4 SENIAT payments (30) Projected Q4 cash expenses (12) 236 Bolivar cash balance (16) USD cash balance 220 Restricted cash USD (80) Unrestricted USD 140 Proceeds Payment of operating advance (January) 27

  19. Slide 19: Stockholder Proposal

    STOCKHOLDER PROPOSAL Approve transfer of assets to Petrodelta Harvest to contribute its right to the SMU assets to Petrodelta Requires affirmative vote of a majority of the outstanding shares Board recommends a affirmative vote Conversion to the mixed company is our best available alternative If sto

  20. Slide 20: Board Considerations for FOR Recommendations

    BOARD CONSIDERATIONS "FOR" RECOMMENDATIONS Harvest's share of unrisked reserves and exposure to exploration upside is greater in Petrodelta compared with the existing OSA Petrodelta will deliver oil to PDVSA at market based prices equal to about 70% of WTI instead of the service fee received under t

  21. Slide 21: Board Recommendation

    BOARD RECOMMENDATION Board of Directors Recommends a Vote "FOR" Graphical representation of a map on page 6 of the investor presentation highlighting the South Monagas Unit. The South Monagas Unit is comprised of the Uracoa, Bombal and Tucupita fields. Graphical representation of a map on page 8 of

Harvest Natural Resources — Proxy Contest (December 2006) on 6ix