Noront Resources — Investor Presentation (March 2020)
14 slides from Noront Resources's investor presentation, March 2020
Slide 1: Critical Minerals and Battery Metals in the Ring of Fire
CRITICAL MINERALS AND BATTERY METALS IN THE RING OF FIRE Noront Resources Ltd. | March 2020 1
Slide 2: Cautionary Note Regarding Forward-Looking Information
CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation. Examples of such forward-looking information includes information regarding the timing, extent and success of explo
Slide 3: Consolidation of the Ring of Fire
CONSOLIDATION OF THE RING OF FIRE District Scale Comparison Ring of Fire Sudbury Basin Our properties are comparable in size to the Sudbury Basin Noront holds: • The majority of all claims in the Ring of Fire • 22 of the 26 significant mineral discoveries • 7 of the 9 NI 43-101 compliant resources •
Slide 4: Deep Project Pipeline
DEEP PROJECT PIPELINE A World-Class Nickel Deposit and Chromite Resource Critical Minerals and Battery Metals • In 2018, the U.S. published a list of 35 minerals critical to the U.S. economy and national security • Of these minerals, 6 are found in the Ring of Fire: – Chromite, Platinum, Palladium,
Slide 5: Nickel Outlook
NICKEL OUTLOOK Nickel in Electric Vehicle (EV) Batteries Changes the Market Place • Historically, 65-70% of nickel has been used in the manufacture of Stainless Steel • Nickel demand to increase hugely from Electric Vehicle batteries • Ni-Mn-Co (NMC) cathodes are emerging as the dominant choice due
Slide 6: Platinum and Palladium Outlook
PLATINUM AND PALLADIUM OUTLOOK • Platinum and Palladium are used in the manufacture of catalytic converters which “scrub” pollutants from Internal Combustion Engines • Demand for Platinum has moderated and is in balance due to the decline in sales of diesel cars and trucks • Implementation of strict
Slide 7: Ring of Fire's First Development: Eagle's Nest
RING OF FIRE’S FIRST DEVELOPMENT Eagle’s Nest Nickel-Copper-Platinum-Palladium Deposit Eagle’s Nest Mine Resource Model Feasibility Study • 2012 Positive Feasibility Study on Eagle’s Nest – After tax NPV (8%) of $C543Mm with 28% IRR1 – Resource development has potential to extend mine life from 11 t
Slide 8: Eagle's Nest Layout
EAGLE’S NEST LAYOUT Minimizing Surface Footprint • No surface tailings • No open pits • No waste rock piles • No surface quarry • Mine fits on existing site footprint 8
Slide 9: Ring of Fire Chromite Deposits
RING OF FIRE CHROMITE DEPOSITS A World-Class Chrome Resource Tonnes Tonnes Blackbird1 (millions) Cr2O3 (%) Black Thor1 (millions) Cr2O3 (%) Measured 9.3 37.44 Measured 107.6 32.2 Indicated 11.2 34.36 Indicated 30.2 28.9 Measured and Indicated 20.5 35.76 Measured and Indicated 137.7 31.5 Inferred 23.
Slide 10: Stainless Steel and Ferrochrome Production
STAINLESS STEEL AND FERROCHROME PRODUCTION • Since 2000, China has become the dominant producer and • Ferrochrome is a key ingredient of Stainless Steel consumer of Stainless Steel • All Stainless Steel contains 10% - 30% Chrome • In 2018 and 2019, Stainless Steel growth was 7% • Ferrochrome product
Slide 11: North American Stainless-Steel Production
NORTH AMERICAN STAINLESS-STEEL PRODUCTION • North American Stainless Steel market is small, representing roughly 6% of world production • There is no Ferrochrome production in North America; American Stainless plants depend on imports of Ferrochrome to feed their furnaces • The bulk of Ferrochrome i
Slide 12: Ferrochrome Production Facility (FPF)
FERROCHROME PRODUCTION FACILITY (FPF) FPF Key Aspects Sault Ste Marie FPF Site • Noront has partnered with Algoma Steel on the use of a brownfields site and associated logistical support in Sault Ste. Maria, Ontario Key factors include power and rail infrastructure, access to US market, and skilled
Slide 13: Regional Infrastructure
REGIONAL INFRASTRUCTURE Key to Development of the Ring of Fire Access Route Permitting Timeline • 2014: The Province of Ontario committed $1 billion for Ring of Fire infrastructure development • 2015-16: The province, communities and industry collaborate on various studies and analysis • 2017: Annou
Slide 14: Follow Us @NorontResources
FOLLOW US @NorontResources norontresources.com 14
Noront Resources — Investor Presentation (March 2020) on 6ix