Tennessee Valley Authority · NYSE:TVC

Tennessee Valley Authority — Corporate Update (November 2016)

22 slides from Tennessee Valley Authority's corporate update, Nov 30, 2016

  1. Slide 1: Renewable Energy Solutions 2017 Program Roll-out

    Renewable Energy Solutions 2017 Program Roll-out November 30th, 2016

  2. Slide 2: Agenda

    Agenda • Overview of 2017 Renewable Programs • Green Power Providers (GPP) • Distributed Solar Solutions (DSS) Pilot • Questions | 3

  3. Slide 3: Overview of 2017 Renewable Programs

    Overview of 2017 Renewable Programs 4

  4. Slide 4: TVA Renewables

    TVA Renewables PUBLIC Renewables Negotiated (Utility-Scale) Proposals > 2MW COMMUNITY Renewables Distributed (Distribution-Scale) Solar Solutions 50kW – 2MW PRIVATE Renewables Green Power (Small-Scale) Providers Up to 50kW Dispersed Power Program up to 80MW (not exclusive to renewable generation) PL

  5. Slide 5: Green Power Providers (GPP)

    Green Power Providers (GPP) | 6

  6. Slide 6: 2016 GPP Highlights

    2016 GPP Highlights Capacity • 10 MW split 50/50 (Res/Non-res), which was combined in July. • Approximately 3MW capacity remaining Qualification • ‘Fast Track’ now requires minimum of 1,000 kWh/year Financials • Price set at Retail Rate • $1000 Residential Marketing Incentive Payment no longer avail

  7. Slide 7: 2017 GPP Program Parameters

    2017 GPP Program Parameters A program that supports Valley homeowners and businesses to install and operate their own renewable energy systems. • Size limits: 50 kW or less • Capacity: 10 MW (50 residential / 50 non-residential) • Price: Retail • 1000 kWh minimum usage • Offering Timeframe: January

  8. Slide 8: NABCEP PV Certification Changes

    NABCEP PV Certification Changes • GPP is updating the guidelines to align with a recent change by NABCEP: • Entry Level Certification has been removed • Associate Level Certification has been added • Process to transfer existing Entry Level is simple • Requires CEUs or re-exam every 3-years • TVA wi

  9. Slide 9: Contact GPP

    Contact GPP Email GPP at greenpowerswitch@tva.gov Call GPP Question Line at 866-673-4340 | 10

  10. Slide 10: Distributed Solar Solutions (DSS) Pilot

    Distributed Solar Solutions (DSS) Pilot | 11

  11. Slide 11: 2016 Distributed Solar Solutions (DSS) - Overview

    2016 Distributed Solar Solutions (DSS) - Overview Pilot Goals Pilot details are determined • Implementing “Closer to the Customer” by the guidelines which are • Partnerships subject to adjustment or • Knowledge Sharing with other LPCs modification as needed. Pilot Offering • 10MW (initial offering)

  12. Slide 12: 2016 DSS – Application Process

    2016 DSS – Application Process Selection DSS Criteria is critical to Process ensure that: 1. TVA receives value for the premium paid LPC Initial 2. LPCs progress in Screen moving renewables of Projects closer to the customer 13

  13. Slide 13: 2016 Distributed Solar Solutions

    2016 Distributed Solar Solutions 16.7 MW | 14

  14. Slide 14: 2017 DSS Program Parameters

    2017 DSS Program Parameters • Capacity: 10 MWs • Price: Avoided Cost + Premium of 2.73 cents/kWh • Comparing the simple average of the 20-year rate (base + premium), the 2017 average is 16% lower than the 2016 average • Reduce max project size from 5 MW to 2 MW to focus on Community Solar (matches D

  15. Slide 15: 2017 DSS Base Rates

    2017 DSS Base Rates FY18 sPSP Rate FY18 sPSP Months Time of Day (CPT) Draft SMV Draft SMV (¢/kWh) 3% Escalation 5% Escalation 3% (2018 Start) (2018 Start) Escalation (¢/kWh) (¢/kWh) Mon-Fri 12pm-8pm 4.613 3.935 July & August Mon-Fri 6am-12pm and 8pm-12am; Sat & Sun 6am-12am 3.199 2.729 Everyday 12am

  16. Slide 16: 2017 DSS Criteria Considerations

    2017 DSS Criteria Considerations LPC Business Models LPC Technical Innovations • Financing Models • Targeted Deployment • Customer Engagement • Grid Management 2016 • Financing Models • Targeted Deployment • Customer Engagement • Volt/var support, loss • Traditional Community load, etc Solar • Grid

  17. Slide 17: 2017 DSS Criteria Focus Areas

    2017 DSS Criteria Focus Areas The matrix is designed to assist in targeting renewable opportunities for LPCs Small to Medium Medium to Large Medium to Large Traditional Cooperative Cooperative Small to Medium Municipal Community Energy Authority Municipal Solar EPA – (1) 1.3MW AEC EPA – 1.3MW EPB DS

  18. Slide 18: DSS Application Timeline

    DSS Application Timeline • The 2017 contract, guidelines, and selection process will be available on the external website by January 11, 2017. • Applications will be accepted starting Wednesday, March 1, 2017 until Wednesday, March 15, 2017 as part of an initial review period • The Application revie

  19. Slide 19: Contact DSS

    Contact DSS Email DSS at DSS@tva.gov | 20

  20. Slide 20: Glossary

    Glossary Links provided to the respective sites for more information • LPC- Local Power Company • NABCEP- North American Board of Energy Practitioners • PURPA- Public Utility Regulatory Policies Act • GPP- Green Power Providers • DPP- Dispersed Power Production • DSS- Distributed Solar Solutions • G

  21. Slide 21: Questions / Discussion

    Questions / Discussion | 22

  22. Slide 22: Slide 22

Tennessee Valley Authority — Corporate Update (November 2016) on 6ix