Slide 1: Third Quarter 2017 Earnings Call Presentation
Third Quarter 2017 Earnings Call Presentation
Slide 2: Randall W. Atkins and Michael D. Bauersachs
Randall W. Atkins Michael D. Bauersachs Executive Chairman President & CEO
Slide 3: Elk Creek Plant – Clean Coal Stockpile
Elk Creek Plant – Clean Coal Stockpile
Slide 4: Elk Creek Plant – Drive Over Truck Dump Installed
Elk Creek Plant – Drive Over Truck Dump Installed
Slide 5: Elk Creek Plant – Initial Clean Coal
Elk Creek Plant – Initial Clean Coal
Slide 6: Elk Creek Plant – Loadout Reclaim Progress
Elk Creek Plant – Loadout Reclaim Progress
Slide 7: Elk Creek Plant – Continued Progress
Elk Creek Plant – Continued Progress
Slide 8: Elk Creek Plant – Raw Coal Feeding Silo
Elk Creek Plant – Raw Coal Feeding Silo
Slide 9: Elk Creek Plant – Temporary Refuse Stacker
Elk Creek Plant – Temporary Refuse Stacker
Slide 10: Elk Creek Plant – Coal Silos
CYRAMACO RESOURCES WWwW.ramacoresources.com
Slide 11: Berwind Breaker Installation – AEP Substation
Berwind Breaker Installation – AEP Substation
Slide 12: Berwind Canopy Installation
Berwind Canopy Installation
Slide 13: Berwind HV Power Lines Installed to Mine
Berwind HV Power Lines Installed to Mine
Slide 14: Berwind Mine and Haul Road
ToT tk ‘SRAMACO Berwind Mine and Haul Road WwWww.ramacoresources.com
Slide 15: Berwind Faceup
64 RAMACO RESOURCES Berwind Faceup WWwW.ramacoresources.com
Slide 16: Berwind Remaining Faceup Coal to Truck
Berwind Remaining Faceup Coal to Truck
Slide 17: Ram – Gas Mine Faceup Excavation
Ram – Gas Mine Faceup Excavation
Slide 18: Ram – Surface Coal Stockpiles
Ram – Surface Coal Stockpiles
Slide 19: StoneCoal Alma Mine and Stockpile
StoneCoal Alma Mine and Stockpile
Slide 20: Berwind Faceup Time Comparison
Berwind Faceup Time Comparison