  1. Slide 1: Victory Nickel Inc. Building Canada's Next Nickel Producer

    Victory Nickel Inc. Building Canada’s Next Nickel Producer Annual General Meeting June 22, 2010

  2. Slide 2: Disclaimer

    Disclaimer Some of the statements contained in the following material may be "forward-looking statements." All statements, other than statements of historical fact, that address activities, events or developments that Victory Nickel believes, expects or anticipates will or may occur in the future ar

  3. Slide 3: Share Price Comparison

    Share Price Comparison Jun July Aug Sep Oct Nov Dec Jan Feb Mar Apr May 3 2009 2010

  4. Slide 4: Strategy

    Strategy Goal: To become Canada’s next new nickel producer 1. Develop the Minago nickel mine World’s highest grade nickel concentrate Valuable frac sand by-product Mining friendly jurisdiction Low power costs 2. Evaluate and advance production potential at Mel and Lac Rocher on a low capex direct-sh

  5. Slide 5: Four Advanced Sulphide Nickel Projects

    Victory Nickel Inc. Four Advanced Sulphide Nickel Projects Over 900 million pounds of nickel in Measured and Indicated resources and 250 million pounds of Inferred resources, NI 43- 101 compliant 5

  6. Slide 6: Lynn Lake Project

    Lynn Lake Project Overview Purchased Minago royalty and Lynn Lake Mine from Independent Nickel in 2008 Optioned to Prophecy Resource Corp. (TSXV:PCY) in Oct. 2009 for $4M cash, $3M work commitment, 10% of PCY shares In addition to nickel at Lynn Lake, Prophecy owns interests in copper, coal and vana

  7. Slide 7: Mel Project

    Mel Project Overview Ongoing economic evaluation Metallurgical testing Entered JV partner Vale Inco’s option period Classification Tonnes Grade In-Situ Nickel (millions) (% Ni) (millions lb) Mel** Indicated 4.3 0.875 83 Inferred 1.0 0.839 19 **At 0.5% nickel cut-off 7

  8. Slide 8: Lac Rocher Project

    Lac Rocher Project Overview EIS submitted Access road complete Metallurgical testing Geophysical surveys Diamond drilling Classification Tonnes Grade In-Situ Nickel (millions) (% Ni) (millions lb) Lac Rocher** Measured 0.29 1.23 8 Indicated 0.51 1.05 12 Total M&I 0.80 1.12 20 Inferred 0.44 0.65 6 8

  9. Slide 9: Minago Project

    Minago Project Overview 100% owned, royalty-free Large resource Significant exploration upside: At depth and in North Limb Sulphide nickel: conventional processing, ~22% nickel concentrate (up to 35% Ni) Breakeven nickel price: US$4.65 Classification Tonnes Grade In-Situ Nickel (millions) (% Ni) (mi

  10. Slide 10: Minago Project Milestones

    Minago Project Milestones DFS completed 4.3 km access road built EIS filed ~10,000 m winter drilling program completed Electrical equipment procured 10

  11. Slide 11: Minago Project DFS Highlights

    Minago Project DFS Highlights Strip 11.7:1 (frac sand as overburden) Initial seven-year nickel production life (open pit only) Average annual ore production: 3.6 million tonnes Average annual nickel production in concentrate: ~11,000 tonnes Cash cost per lb nickel before by- Minago product credits:

  12. Slide 12: Minago Project Frac Sand

    Minago Project Frac Sand 11.2 million tonnes marketable frac sand resource, representing 182% tonnage increase over PEA Mining occurs over three years; sales over 10 years Selling price per tonne, net of freight = $63.02 Projected annual net revenue = $70 million Processing cost per tonne of frac sa

  13. Slide 13: Minago Summary Project Schedule

    Minago Project Summary Project Schedule Activity Start Quarter 2010 2011 2012 2013 2014 Road Construction Q1 EIS Submission Q2 Permitting Q3 Early Works Q4 Q1 Substation Installation Q1 Pit Dewatering Wells Q4 Q1 Dredging Overburden Q2 Mine Development Q1 Q1 Frac Sand Plant Construction and Commissi

  14. Slide 14: Minago Access Road Construction

    Minago Project Access Road Construction Access road (4.3 km) completed March 30, 2010 Installation of drainage system scheduled for July 2010 Construction contract awarded to a First Nations Contractor Access road constructed by three First Nations contractors and one non First Nations contractor Em

  15. Slide 15: Environment Act Proposal Submission

    Minago Project Environment Act Proposal Submission Environment Act Proposal (EAP) submitted to Manitoba Conservation on April 30, 2010 EAP is supported by a comprehensive Environmental Impact Statement (EIS) produced by Victory Nickel and Golder Associates, Roche, URS, Wardrop and GAIA The EAP and E

  16. Slide 16: Minago Winter Drill Program

    Minago Project Winter Drill Program Convert inferred to indicated within pit shell Obtain mineralized intercepts within “wedges” Extend higher grade mineralization which may raise overall grade Accurate modelling of granites may reduce low grade in pit shell 16

  17. Slide 17: Minago Optimization

    Minago Project Optimization Sourcing low-cost equipment Process Technology Interviewing engineering companies Interviewing potential new staff Reviewing and revising economic model 17

  18. Slide 18: Economic Summary (100% equity)

    Minago Project Economic Summary (100% equity) Minago Sulphide Nickel Project: Economic Summary Comparison Base Case Jun. 21, 20101 Base Case Dec. 14, 20091 ($million except % and years) ($million except % and years) Undiscounted cash flow 1,053.7 917.7 NPV @ 8% 367.1 293.8 NPV @ 6% 487.6 402.6 NPV @

  19. Slide 19: Objectives 2010/2011

    Objectives 2010/2011 Advance Minago financing Frac sand offtake Nickel concentrate offtake Complete mine permitting at Minago Begin detailed engineering at Minago Source and acquire low-cost equipment for Minago as available Begin full scale Minago development in early 2011 Continue to evaluate prod

  20. Slide 20: Summary

    Summary Solid platform for growth Four advanced sulphide nickel projects Committed management team Effective support staff Good relations with First Nations Committed stakeholder in Manitoba government 20