  1. Slide 1: Presentation at Paydirt's 2010 South Australian Resources and Energy Investment Conference

    For personal use only Presentation at Paydirt’s 2010 South Australian Resources and Energy Investment Conference Adelaide, 3-4 May 2010 Havilah Resources Presentation Details Havilah Resources NL aims to become a significant producer of Havilah Resources NL (ASX:HAV) is please to attach a copper, go

  2. Slide 2: A large copper deposit in South Australia

    For personal use only A large copper deposit in South Australia SA Resources and Energy Investment Conference Presentation by Dr. Chris Giles Technical Director 3 May 2010

  3. Slide 3: Kalkaroo – a significant copper gold deposit

    Kalkaroo – a significant copper gold deposit For personal use only • Feasibility study completed – $14 million funded by Glencore International • Measured resource of 62 Mt @ 0.55% Cu & 0.44 g/t Au based on 353 drillholes and 31,000 assays • 320,000 t copper and 980,000 oz gold • Mine life 11.5 year

  4. Slide 4: Kalkaroo project – Curnamona Province

    For personal use only Kalkaroo project – Curnamona Province

  5. Slide 5: Kalkaroo deposit - origin

    Kalkaroo deposit - origin For personal use only • A large replacement deposit • Key elements – structural domes, major vertical faults, chemically reactive evaporitic horizon, granite • Mineralising solutions have migrated up faults and replaced a favourable chemically reactive evaporitic horizon

  6. Slide 6: Kalkaroo deposit – origin

    For personal use only Kalkaroo deposit – origin

  7. Slide 7: Kalkaroo – aeromagnetics shows mineralised horizon

    Kalkaroo – aeromagnetics shows mineralised horizon For personal use only 100m thick mineralised horizon clearly visible on high quality aeromagnetics – a good prospecting tool

  8. Slide 8: Orebody Geometry

    For personal use only Kalkaroo Orebody Geometry •Orebody forms a north dipping sheet •Truncated each end by a major major E‐W fault‐breccia zone •Shear displacement at western end

  9. Slide 9: Orebody Geometry

    For personal use only Kalkaroo Orebody Geometry

  10. Slide 10: Orebody Geometry

    For personal use only Kalkaroo Orebody Geometry $2 20 value triangulation Qz-carb b Vein/breccia Kalkaroo Main Dome Kalkaroo West Western Shear Base of Hangingwall sequenc ce To otwall sequence Top of Foo 3D view look king E showing major structural and stratigrraphic features and $2 20 value triang

  11. Slide 11: Kalkaroo – ore zonation

    For personal use only Kalkaroo – ore zonation • Ore shows vertical zonation and supergene enrichment due to oxidation of primary sulphides in upper part • Free gold and native copper in soft weathered rock • Primary sulphides (chalcopyrite) in fresh rock at depth Mineralisation type Cu % Au g/t SG T

  12. Slide 12: Main zone – ore zonation

    For personal use only Kalkaroo main zone– ore zonation Section D

  13. Slide 13: West Kalkaroo – ore zonation

    For personal use only West Kalkaroo – ore zonation Section KW 4

  14. Slide 14: Kalkaroo project – mining

    Kalkaroo project –mining For personal use only • Starter pit in far west, moving progressively eastward • Terrace mining, with in pit dumping of waste • At least half of ore body will require minimal or no blasting

  15. Slide 15: Kalkaroo project – financial model

    Kalkaroo project – financial model For personal use only • Mining models run at Cu price US$4,400 and US$5,500 / tonne, Au price US$1,000 /oz, AUD:USD 0.8, 4.5 Mtpa ore • At 85% current copper price, cash surplus (after capital repayment) approx A$605m over 11.5 year mine life • No account of molybd

  16. Slide 16: Kalkaroo project - capex

    Kalkaroo project - capex For personal use only Total capex for 4.5 Mtpa approx $250m, comprising : • Processing plant and related infrastructure $198m • Indirect costs associated with construction $49m • Further $53.5m if owner operated ‐ mining equipment

  17. Slide 17: Kalkaroo project – positive attributes

    Kalkaroo project – positive attributes For personal use only • Favourable logistics ‐ railway (50 km), Broken Hill (120 km) and 500km from Adelaide • Potentially good returns at present metal prices • Funded (subject to Glencore decision),HAV retains 86% • Good discovery potential for additional res

  18. Slide 18: Kalkaroo – next steps

    Kalkaroo – next steps For personal use only • Evaluation of Feasibility Study by Glencore and decision on future participation and funding • Refine processing flow sheet to better handle four ore types and improve recoveries • Investigate staged start up to reduce initial capital and risk, taking ad

  19. Slide 19: Disclaimer

    Disclaimer For personal use only • The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general and summary nature only. Havilah Resources NL (Havilah) nor any member of the Havilah Group of companies, gives no warra