Ev Resources Limited · ASX:EVR
Ev Resources — Corporate Update (February 2024)
19 slides from Ev Resources's corporate update, Feb 6, 2024
Slide 1: Update on the Parag Project drill programme, Peru
February 6, 2024 Update on the Parag Project drill programme, Peru For US Investor Meetings Feb 2024 ASX: EVR
Slide 2: Disclaimer
Disclaimer This presentation has been prepared by EV Resources Limited (“EVR”). The information contained in this presentation is a Compliance Statement professional opinion only and is given in good faith. The material in this presentation (“material”) is not and does not This presentation contains
Slide 3: Exploring for a Copper Porphyry at the Parag Project
Exploring for a Copper Porphyry at the Parag Project • In December 2023, EVR obtained the permits and agreements needed to commence drilling at Parag, its high grade copper-molybdenum project in Huauru province in central Peru. • AK Drilling International were appointed as drilling contractor. • Roa
Slide 4: Drilling commences: first hole finished at 479.4 metres
Drilling commences: first hole finished at 479.4 metres • First core from drilling in the breccia zone from surface is being prepared for assaying in Lima. The first hole APG-001 finished at a depth of 479.4 metres on 5th February 2024 and the second hole APG-001 started the same day. Core from dril
Slide 5: EVR's Multi-Staged Exploration Approach for Parag
EVR’s Multi-Staged Exploration Approach for Parag Ongoing exploration for a copper-molybdenum porphyry system In 2024, the Company’s plan is to move Near term focus on molybdenum rich breccia rapidly towards defining a shallow resource on the breccias whilst developing a deeper, longer-term, Drillin
Slide 6: Panoramic View of the Parag Project
Panoramic View of the Parag Project Hole APG-001 finished 5/02/2024 at 479.4m • The blue polygon corresponds to the Viento mining right, which is where Phase 1 of drilling will be carried out (EV Resources). • Red polygons of the 3 additional mining concessions that are part of the Parag/Viento Proj
Slide 7: Parag Project Location – 145km from Lima
Parag Project Location – 145km from Lima
Slide 8: Parag overlies a Substantial Intrusive System
Parag overlies a Substantial Intrusive System
Slide 9: Large Mining Companies drawn to this intrusive belt
Large Mining Companies drawn to this intrusive belt
Slide 10: 76 Historic Holes (56 unreported) guide our Campaign
76 Historic Holes (56 unreported) guide our Campaign Hole APG-001 finished 5/02/2024 at 479.4m Vie-01
Slide 11: The Parag Project - Numerous Undrilled Breccia Outcrops
The Parag Project - Numerous Undrilled Breccia Outcrops • Areas marked in red show areas of outcropping breccia with reported drilling Hole APG-001 • Areas shown in orange finished 5/02/2024 at 479.4m correspond to areas of mineralized breccia that have not yet been evaluated or explored – and are c
Slide 12: Location of the 2024 Drill Pads
Location of the 2024 Drill Pads Hole APG-001 finished 5/02/2024 at 479.4m
Slide 13: EVR current drill campaign image gallery
EVR current drill campaign image gallery Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding imp
Slide 14: EVR current drill campaign image gallery
EVR current drill campaign image gallery Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding imp
Slide 15: Cross Section Copper Grades
Cross Section Copper Grades Hole APG-001 finished 5/02/2024 at 479.4m
Slide 16: Cross Section Molybdenum Grades
Cross Section Molybdenum Grades Hole APG-001 finished 5/02/2024 at 479.4m
Slide 17: Cross Section Copper (Equivalent) Grades
Cross Section Copper (Equivalent) Grades Hole APG-001 finished 5/02/2024 at 479.4m
Slide 18: Copper Equivalent Grades – Plan View
Copper Equivalent Grades – Plan View Hole APG-001 finished 5/02/2024 at 479.4m
Slide 19: Further Information
ASX: EVR FURTHER INFORMATION Luke Martino Non-Executive Chairman Tel: +61 8 6489 0600 E: luke@evresources.com.au Hugh Callaghan Managing Director Tel: +61 8 6489 0600 E: hugh@evresources.com.au