  1. Slide 1: Berrima Colliery – Closure Working Group Meeting #16

    Click to edit Master title style Subheader Berrima Colliery – Closure Working Group Meeting #16 14 December 2022 DRAFT – Not for distribution

  2. Slide 2: Agenda

    Agenda 1. Welcome and Apologies - Introductions 2. Terms of Reference - Conduct of CWG Members 3. Review of minutes & actions 4. Water Quality Results update - Greg Johnson 5. Water treatment update- Greg Johnson/David Spears 6. Pit top treatment and pipeline REF update– Greg Johnson 7. Resource Reg

  3. Slide 3: Welcome and Apologies

    01 Welcome and Apologies

  4. Slide 4: CWG Representatives, Apologies & Guests

    CWG Representatives, Apologies & Guests ● Boral - Girish Yadwad (apology), Greg Johnson, David Spears, Kate Woodbridge (apology) ● Resource Regulator - Greg Kininmonth, Peter McMillan ● Environment Protection Authority – Greg Newman (apology), Andrew Couldridge, ● WaterNSW - Ravi Sundaram ● Wingecar

  5. Slide 5: Terms of Reference – Code of Conduct

    02 Terms of Reference – Code of Conduct

  6. Slide 6: Terms of Reference – Code of Conduct

    Terms of Reference – Code of Conduct 6

  7. Slide 7: Review of minutes and actions

    03 Review of minutes and actions

  8. Slide 8: Review of Minutes – suggested amendments

    Review of Minutes – suggested amendments 8

  9. Slide 9: Review of minutes - actions

    Review of minutes - actions Summary of Meeting Actions: Boral to include water quality testing from behind the bulkheads and report results at the next meeting. Extend a further invitation to Medway representative for the next meeting. Boral to provide a draft of the REF to WaterNSW and the Resource

  10. Slide 10: Water Quality Results Update

    04 Water Quality Results Update

  11. Slide 11: Surface Water Monitoring Update

    Surface Water Monitoring Update 11

  12. Slide 12: Water Quality Guidelines

    Water Quality Guidelines In order to interpret and give context to the water quality monitoring results from the Colliery we are now including details, where applicable, against the Australian Water Quality Guidelines for Freshwater Protection, Australian Water Quality Guidelines – Primary Industry

  13. Slide 13: Adit discharge update – Volume, pH & EC

    Adit discharge update – Volume, pH & EC Volume discharged – 1.9 ML per day (av.) pH – recent results more towards a neutral level by dosing EC – slight uptick above 1000uS/cm 13

  14. Slide 14: Adit discharge update – Iron & Manganese

    Adit discharge update – Iron & Manganese Iron –has settled back down. Manganese – has continued to trend down 14

  15. Slide 15: Adit discharge update – Nickel and Zinc

    Adit discharge update – Nickel and Zinc Nickel – Back to post bulkhead trend. Zinc – Back to post bulkhead trend Commentary – Recent spikes in metals have settled down. Increased lime dosage and aeration is key. Water quality will be easier to manage at the surface once the pit top treatment system

  16. Slide 16: River Quality Update

    River Quality Update BCRAL ©

  17. Slide 17: River quality update – pH & EC

    River quality update – pH & EC Similar results to last quarter. High stream flows continue. pH – No influence in river at Biloela (6km) EC – No influence in river at Biloela (6km) 17

  18. Slide 18: River quality update – iron & manganese

    River quality update – iron & manganese Iron – No influence on river. Manganese – Elevated levels in the stream are likely the result of high stream flow from rain events. 18

  19. Slide 19: River quality update – Nickel and Zinc

    River quality update – Nickel and Zinc Nickel – River is below 95% protection down stream. Zinc – Levels below 95% protection down stream. 19

  20. Slide 20: River quality update – Sulphate and commentary

    River quality update – Sulphate and commentary Copper – Below stock drinking levels. Other sources influencing. Sulphate –Well below any trigger points. 20

  21. Slide 21: Bulkhead Water Quality Results

    Bulkhead Water Quality Results The water behind the bulkheads remains poor. 21

  22. Slide 22: pH and Electrical Conductivity behind bulkheads

    pH BHA SHE Electrical Conductivity BH2 1350 BH2 BH4 BH4 BHS BHS BH7 = BH7 = 1250 e. 2 e = s a . = 1150 2 a ° 3 8 ° 5 a . a s a * 1050 a so | FPP FPF PPP Pr Pr PM Pr PP PP FP SP PPP PP PP PPP PP FP FF SF SF SH PF SF oS SM a ‘i ." \\ re” ew” Sh FHKE HF FP_F_F_F_HF_ LF F_F_F_F_ FFF

  23. Slide 23: Nickel and Zinc concentrations

    Concentration (mg/L) BHI BH2 BHa BHS BH7 Nickel (Total) Concentration (mg/L) as Zinc (Total) BHI BH2 BH4 BHS BH7

  24. Slide 24: Water Treatment Update

    OS Water Treatment Update eee

  25. Slide 25: Water treatment update

    Water treatment update • The mine water quality behind the bulkheads remains poor, the underground water treatment system remains in operation to manage the mine water discharge quality. • Volumes of waters discharging has been consistent at 1.9ML • The pH of water was within the licence conditions.

  26. Slide 26: Bulkhead water level update

    Bulkhead water level update The underground water level behind the bulkheads has been retained at a reasonably constant height as is indicated in the above graph. With mine water levels behind the bulkheads managed though the underground mine water treatment pumping system. The monitoring the surrou

  27. Slide 27: Pit Top Treatment & Pipeline EPL EIP & Review of Environmental Factors

    06 Pit Top Treatment & Pipeline EPL EIP & Review of Environmental Factors

  28. Slide 28: Tip Top Treatment and Pipeline – EPL EIP

    Tip Top Treatment and Pipeline – EPL EIP • The NSW EPA finalised the licence variation in December 2021. 28

  29. Slide 29: Review of Environmental Factors – Status

    Review of Environmental Factors – Status Rob Byrnes from IEC has now prepared a draft report. 29

  30. Slide 30: Draft REF – Proposed Pipeline Route

    Draft REF – Proposed Pipeline Route 30

  31. Slide 31: Draft REF – Project Outline

    Draft REF – Project Outline In summary, • Pumping water from the mine to a purpose built passive treatment at the pit top • Treatment system will involve aeration, pH correction and settlement via multi celled ponds. • Treated water can be discharged back into the mine Wingecarribee River via a new

  32. Slide 32: Draft REF – Summary of Impacts

    Draft REF – Summary of Impacts The project will results in the following impacts: • Increased traffic along Medway Road during first six months of construction, up to 10 trucks per day, averaging 2. (Dam construction materials/pipework, plant and equipment) • No additional traffic once operational.

  33. Slide 33: Draft REF – Summary of Benefits

    Draft REF – Summary of Benefits The project will result in the following benefits: • Reduction of environmental risks as a result of mine closure • Improved water quality within the Wingecarribee due to more consistent and effective water treatment capability • Better reuse of the water resource by

  34. Slide 34: DRAFT REF – Next Steps

    DRAFT REF – Next Steps Boral has met with the EPA. Following potential concerns for discharging upstream of the existing adit, Boral is proposing to discharge back into the mine to release via V-notch weir and the existing adit. Boral held a community day on Sat 26 November at Berrima Church hall. T

  35. Slide 35: Resources Regulator Update

    07 Resources Regulator Update

  36. Slide 36: Resources Regulator Activity Update

    Resources Regluator Activity Update The RR has issued Boral a directive to update the groundwater model and run long term closure scenarios. This modelling exercise and work will run until late April 2023. The outcome should finalise the closure option and the pit top treatment and pipeline proposal

  37. Slide 37: Medway Community Update

    08 Medway Community Update

  38. Slide 38: Medway Community update

    Medway Community update Welcome Guest – Lance Ward Vice President of the Medway Community Association Open discussion 38

  39. Slide 39: Communications Update

    9 Communications Update

  40. Slide 40: Community drop-in session and local issues

    • A community drop-in session was held in Berrima on Saturday 26th November to answer questions regarding the proposed pit top treatment and pipeline project from the colliery to the cement works. • We have been approached by a few residents at Medway about illegal dumping of garden waste and other

  41. Slide 41: General Business

    10 General Business

  42. Slide 42: Next Meeting

    11 Next Meeting Proposed 26 May 2023

  43. Slide 43: Thanks for your participation

    Thanks for your participation 43