Kali Metals Limited · ASX:KM1

Kali Metals — Diggers & Dealers 2025

16 slides from Kali Metals's conference presentation, Aug 4, 2025

  1. Slide 1: Diggers & Dealers Presentation August 2025

    For personal use only Diggers & Dealers Presentation August 2025 ASX: KM1

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared by Kali Metals Limited (Kali) and contains information about This presentation may include forward-looking statements and opinion. Forward-looking Kali current as at the date of this presentation. The presentation is in summary form, has not been statem

  3. Slide 3: Kali Metals – Key Summary

    D & D Presentation, August 2025 Kali Metals – Key Summary For personal use only • Exploration tenure ~>4,000km2 in Substantial WA and NSW/Victoria land holding • Higginsville Lithium Tier 1 • Pilbara Gold and Lithium jurisdiction • Southern Lachlan Fold Belt Tin Pilbara Projects Funding • ~$5.0m cas

  4. Slide 4: Corporate Structure

    D & D Presentation, August 2025 Corporate Structure For personal use only Current (1 August 25) Share Price $0.12 Total shares on issue 150.7M Market Capitalisation $18.1M Cash1 $5.0M Enterprise Value $13.1M Major Shareholders Board and Management Westgold Resources 21.2% Luke Reinehr Non-Executive

  5. Slide 5: Gold at Marble Bar (Kali 100%-owned)

    D & D Presentation, August 2025 1 Gold at Marble Bar (Kali 100%-owned) • Previously within the SQM Australia Joint Venture For personal use only Focus turns from Lithium to Gold in October 2024 • Two principal Prospects identified in late 2024: – Tiger Prospect: – Sherman Prospect • Discovery rock c

  6. Slide 6: Strategic Acquisitions completed since March 2025

    D & D Presentation, August 2025 Strategic Acquisitions completed since March 2025 1. Florance Resources 3 – E45/4629 + 4630 For personal use only Florance Resources 1. $30,000 in Cash acquired March 2. $200,000 in KM1 shares 2025 2. Peggy Resources 4 – E45/6389 Peggy Resources acquired May 2025 1. $

  7. Slide 7: Exploration Chronology

    D & D Presentation, August 2025 Exploration Chronology: • Marble Bar tenement handed back to For personal use only Kali Metals 100% from SQM Australia lithium joint venture • October 2024 Reconnaissance at Tiger with rock chip assaying 2.95g/t Au • December 2024 - Kali reviews previous soil Geochem

  8. Slide 8: Current Prospects identified - Tiger, Churchill and Sherman Prospects

    D & D Presentation, August 2025 Current Prospects identified - Tiger, Churchill and Sherman Prospects now >3.0km strike 6 Mineralisation = Au+Ag+Te For personal use only Pathfinders = As+Mo+Sb+S±Pb Style = typical hydrothermal lode style veins Grades = up to 87.9 g/t Au Average grade of ALL rock chi

  9. Slide 9: Rock Chips at Marble Bar Gold Project

    D & D Presentation, August 2025 Rock Chips at Marble Bar Gold Project For personal use only Churchill Prospect – rock chip results >3.0 g/t Au Tiger Prospect – rock chip results >3.0 g/t Au Sherman Prospect – rock chip results >3.0 g/t Au 9 STRICTLY PRIVATE AND CONFIDENTIAL

  10. Slide 10: High resolution drone imagery & geophysics = efficient exploration

    D & D Presentation, August 2025 High resolution drone imagery & geophysics 7 = efficient exploration For personal use only • Use of drone imagery has vastly increased exploration efficiency • Resolution down to 3cm • Compare Gov’t (L) imagery with Drone (R) • Subtle changes in colour and recognition

  11. Slide 11: What's next? Maiden Drill Program for 2025

    D & D Presentation, August 2025 What’s next? Maiden Drill Program for 2025 Weathered host rock at Tiger Prospect For personal use only Aiming to initiate RC drilling by late August 2025 • Heritage surveys completed on all target areas • Access tracks monitors organised • Test all Prospects with at l

  12. Slide 12: Additional Exploration Plan for 2H 2025 and into 2026

    D & D Presentation, August 2025 Additional Exploration Plan for 2H 2025 and into 2026 8 • Completing mapping / sampling over For personal use only newly identified target areas • Completing the initial petrological and mineralogical study with Microanalysis Australia • Complete drone survey over E45

  13. Slide 13: Higginsville Lithium Project

    D & D Presentation, August 2025 Higginsville Lithium Project For personal use only • 3D modelling of pegmatite intersections at Spargoville and subsequent core review have identified LCT pegmatites with spodumene mineralisation9 • Key projects emerging at Spargoville, Widgiemooltha and Mt Henry Proj

  14. Slide 14: Higginsville Lithium Project Current (Q3 2025) soil sampling Program

    D & D Presentation, August 2025 Higginsville Lithium Project Current (Q3 2025) soil sampling Program For personal use only • ~7,400 soil samples underway across a substantial ~150km2 area10 • Area not previously explored for lithium • Designed to generate drill-ready lithium targets • Gyro Drilling

  15. Slide 15: Southern Lachlan Fold Belt – Sweetwater Project (Sn)

    D & D Presentation, August 2025 Southern Lachlan Fold Belt – Sweetwater Project (Sn) For personal use only • Assays confirm lithium mineralisation from pegmatites at the Jingellic Project at the Giant Pegmatite • Dominant Li mineral confirmed as Spodumene11 • Historical quartz vein rock chip sample

  16. Slide 16: Contact Us

    For personal use only CONTACT US Paul Adams Andrew Willis Managing Director Media & Investor Relations T: +61 8 6424 8880 T: +61 458 441 414 E: admin@kalimetals.com.au E: awillis@nwrcommunications.com.au ASX: KM1 www.kalimetals.com.au Kali Metals @kalimetals

Kali Metals — Diggers & Dealers 2025 on 6ix