  1. Slide 1: City of Cleveland Design Review

    30 November 2021 City of Cleveland Design Review PICKARD CHILTON | HGA | VOCON | WELTY-GILBANE J.V.

  2. Slide 2: Design Presentation Team

    Design Timothy Muckley The Sherwin-Williams Company, Director of Corporate Real Estate Presentation Julie Young Team The Sherwin-Williams Company Vice President, Global Corporate Communications William Chilton Nancy Clayton Pickard Chilton, Design Architect Matt Heisey Vocon, Interior Architect Jon

  3. Slide 3: Design Review

    Design 1. Overall Masterplan Review 2. Pavilion 30 November 2021 3. Tower & Podium 4. Exterior Lighting & Tower Signage 5. Garage 6. Landscape & Site Lighting BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  4. Slide 4: Joint Commission Meeting - Schematic Approval

    SCHEMATIC REVIEW MEETING REPORT Joint Commission Meeting - Schematic Approval Cleveland City Planning Commission & Cleveland Landmarks Commission Downtown | Flats Design Review Advisory Committee & Historic Downtown Cleveland Design Review Committee Meeting Motions - 14 Sept 2021 Motion 1 - Pavilion

  5. Slide 5: Garage Massing & Planning - Design Evolution

    Weston North Block Garage Massing & Planning - Design Evolution G1 G2 G3 G4 G5 G6 G7 G8 G9 G10 G11 G12 G13 G14 G15 305' - 8" 16' - 10" 22' - 8" 22' - 8" 22' - 8" 22' - 8" 22' - 8" 22' - 8" 22' - 8" 22' - 8" 22' - 8" 22' - 8" 22' - 8" 22' - 8" 16' - 10" GA 10' - 0" IDF GA.2 AIR SHAFT AIR SHAFT EXECUT

  6. Slide 6: Garage & Future Development Site - Design Evolution

    Weston North Block Garage & Future Development Site - Design Evolution ST CLAIR AVE ST CLAIR AVE 131’ 131 SURFACE 179 SURFACE 83’-3” SPACES SPACES 134’ 176’ WEST 6TH ST WEST 6TH ST WEST 3RD ST WEST 3RD ST 224’ 4-BAY GARAGE 3-BAY GARAGE 174’ 4 LEVELS + BASEMENT 5 LEVELS + BASEMENT 920 SPACES 925 SPAC

  7. Slide 7: Headquarters Campus Landscape Plan

    Headquarters Campus Headquarters Campus Landscape Plan LEGEND GILMAN BLDG. Sherwin-Williams HQ Sherwin-Williams Lobby N ±179 Spaces Garage PARKING GARAGE Exit W 3RD W 6TH RETAIL LINER ±920 Cars 5 Levels Above Grade 1 Level Below Grade 55 PUBLIC SQUARE Garage Entry Existing Curb line FRANKFORT AVE. G

  8. Slide 8: View from Southeast

    Headquarters Campus View from Southeast Garage Tower Pavilion Podium LEGEND Sherwin-Williams HQ N BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  9. Slide 9: View from the Southeast

    Cleveland Context Model View from the Southeast BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  10. Slide 10: Level 1

    pavilion and podium plans Level 1 1 2 3 4 5 6 TE.020 TE.021 TE.019 A TE.017 T01.ST01A TE.015 TE.016 A.1 TE.013 TE.001 BACK OF EL: 653' - 6" P11 P10 P9 P8 P7 P6 P5 P4 P3 P2 P1 HOUSE 1'-7 1/2" 30'-0" 20'-0" 20'-0" 40'-0" 20'-0" 20'-0" 20'-0" 20'-0" LOADING & TE.002 RECEIVING NM1 P-1676 1:8 P-1671 EL:

  11. Slide 11: Level 2

    pavilion and podium plans Level 2 1 2 3 4 5 6 A A.1 P11 P10 P9 P8 P7 P6 P5 P4 P3 P2 P1 2'-6" 10'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 2'-6" P-940 PA B 30'-0" P-1656 T02.835 PB C E OPEN TO RAC LOBBY BELOW LEARNING & T02.ST04B P-1708 TER 30'-0" T02.455 EL.A EL.B EL.C RESTR

  12. Slide 12: Level 3 | Pavilion Roof

    pavilion and podium plans Level 3 | Pavilion Roof 1 2 3 4 5 6 5' - 0" 70' - 6" 45' - 10" 37' - 8" 45' - 10" NON-OCCUPIED ROOF A 5' - 0" A.1 P11 P10 P9 P8 P7 P6 P5 P4 P3 P2 P1 30'-0" 20'-0" 20'-0" 40'-0" 20'-0" 20'-0" 20'-0" 20'-0" 27' - 8" PA B 2' - 1" B.1 30'-0" NON-OCCUPIED ROOF 27' - 11" PB NON-O

  13. Slide 13: Level 5-13 (Low-Rise) & Level 14 (Conference)

    TOWER PLANS Level 5-13 (Low-Rise) & Level 14 (Conference) 3 4 5 6 3 4 5 6 133'-6" 45'-10" 37'-8" 45'-10" 2'-1" 133'-6" 50'-0" 33'-6" 50'-0" 50'-0" 33'-6" 50'-0" 2'-1" 45'-10" 37'-8" 45'-10" 2'-1" 2'-1" 10'-0" TERRACE 15'-0" 15'-0" B B 2'-1" 2'-1" B.1 B.1 27'-11" 27'-11" 90' - 0" E E 90'-0" EL.A EL.B

  14. Slide 14: Pavilion viewed from Superior Ave. near Public Square

    Renderings Pavilion viewed from Superior Ave. near Public Square Note: refer to landscape renderings for sitework. BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  15. Slide 15: Pavilion Lobby viewed from Public Square

    Renderings Pavilion Lobby viewed from Public Square Aluminum coping trim band Aluminum soffit panels High-performance spandrel glass High-performance vision glass Glass guardrail at terrace Formed aluminum panel surround Aluminum accent band Clear vision glass Limestone-clad columns & spandrel Stain

  16. Slide 16: Aerial View of Pavilion Roof

    pavilion plans Aerial View of Pavilion Roof Aluminum coping trim band Precast concrete pavers Decorative roof ballast Aluminum panel roof cladding BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  17. Slide 17: Pavilion Lobby and Skybridge viewed from West 3rd St.

    Renderings Pavilion Lobby and Skybridge viewed from West 3rd St. Note: refer to landscape renderings for sitework. BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  18. Slide 18: Pavilion - East Elevation (with Tower Beyond)

    pavilion Elevations Pavilion - East Elevation (with Tower Beyond) Refer to enlarged Refer to enlarged elevation detail for elevation detail similar west lobby entrance Refer to enlarged elevation detail East Elevation - West Roadway BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Revie

  19. Slide 19: East Elevation with Terraces

    enlarged elevation plan & section details LEGEND East Elevation with Terraces 1. 2. High-performance vision glass High-performance spandrel glass 3. Formed aluminum coping band 4. Formed aluminum accent band 5. Limestone panels 3 6. Limestone clad columns 2 7. Aluminum return at stone panels at colu

  20. Slide 20: Pavilion - South Elevation

    pavilion Elevations Pavilion - South Elevation Refer to enlarged Refer to enlarged elevation detail elevation detail Refer to enlarged elevation detail South Elevation - West Superior Avenue BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  21. Slide 21: Pavilion - West Elevation

    pavilion Elevations Pavilion - West Elevation Refer to enlarged Refer to enlarged elevation detail of elevation detail similar north facade Refer to enlarged elevation detail Pedestrian Bridge West Elevation - West 3rd Street BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPE

  22. Slide 22: Pavilion - North Elevation

    pavilion Elevations Pavilion - North Elevation Aluminum panels at Refer to enlarged side of raised lobby elevation detail massing beyond Refer to enlarged elevation detail North Elevation - Frankfort Avenue BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-

  23. Slide 23: Typical Pavilion Facades

    enlarged elevation plan & section details LEGEND Typical Pavilion Facades 1. 2. High-performance vision glass High-performance spandrel glass 3. Formed aluminum coping band 4. Formed aluminum accent band 5. Limestone panels 3 6. Limestone clad columns 2 7. Aluminum return at stone panels at columns

  24. Slide 24: View from the South

    Cleveland Context Model View from the South BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  25. Slide 25: Skyline View - Including Tower Signage

    Renderings Skyline View - Including Tower Signage BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  26. Slide 26: Skyline View - Including Tower Signage

    Renderings Skyline View - Including Tower Signage BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  27. Slide 27: Pavilion and Tower viewed from Public Square - Including Tower Signage

    Renderings Pavilion and Tower viewed from Public Square - Including Tower Signage BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  28. Slide 28: Tower Elevations

    tower & podium Elevations Tower Elevations East Elevation South Elevation West Elevation North Elevation W 3rd St W Superior Ave Weston South Parking Vacated Frankfort BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  29. Slide 29: Tower Wall Types

    TOWER FACADE STRATEGIES Tower Wall Types 5’ -0 ” 5’ -0 ” ” -0 ” -0 5’ 5’ 19’ - 0” 19’ - 0” 14’ - 0” 14’ - 0” CW-01 : TYPICAL OFFICE CW-01A : 19FT TALL OFFICE FLOORS CW-01B : MECHANICAL FLOOR CW-01D : TERRACE CW-01C : CROWN AXON - SOUTHEAST (ROOF LINE AND ABOVE) ” ” -6 -0 7’ 5’ - 0” - 0” 5’ 5’ 10’ -

  30. Slide 30: Tower Lobby viewed from Superior Ave. near West 3rd St.

    Renderings Tower Lobby viewed from Superior Ave. near West 3rd St. Note: refer to landscape renderings for sitework. BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  31. Slide 31: Tower Lobby and Pavilion viewed from Superior Ave. near West Prospect Ave.

    Renderings Tower Lobby and Pavilion viewed from Superior Ave. near West Prospect Ave. Note: refer to landscape renderings for sitework. BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  32. Slide 32: East Elevation - Tower Lobby - West 3rd Street

    Tower & Podium Elevations East Elevation - Tower Lobby - West 3rd Street Refer to enlarged elevation detail Refer to enlarged elevation detail Stainless steel & glass entrance doors Stainless steel & glass Refer to enlarged entrance doors elevation detail in garage chapter Ped Bridge BUILDING OUR FU

  33. Slide 33: Glazing at Street Level

    Exterior Materials Glazing at Street Level Metal clad column cover Clear vision glass Structurally glazed mullions Akamai, 145 Broadway, Cambridge MA, Pickard Chilton Tower Lobby Enclosure Rendering Precedent Image - Clear Glazing BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review

  34. Slide 34: South Elevation - West Superior Avenue

    Tower & Podium Elevations South Elevation - West Superior Avenue Refer to enlarged elevation detail Refer to enlarged Refer to enlarged elevation detail elevation detail Refer to enlarged elevation detail in Podium chapter BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY

  35. Slide 35: Podium Facade at Tower Lobby - W Superior Ave

    enlarged elevation plan & section details LEGEND Podium Facade at Tower Lobby - W Superior Ave 1. 2. High-performance vision glass High-performance spandrel glass 3. Formed aluminum coping band 1 4. Formed aluminum accent band 5. Limestone panels 2 6. Limestone clad columns 7. Aluminum return at sto

  36. Slide 36: West Elevation - Weston South Parking Lot

    Tower & Podium Elevations West Elevation - Weston South Parking Lot Refer to enlarged elevation detail Refer to enlarged elevation detail of similar north facade Glass guardrail at roof terrace BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMP

  37. Slide 37: North Elevation - Vacated Frankfort Avenue

    Tower & Podium Elevations North Elevation - Vacated Frankfort Avenue Refer to enlarged elevation detail Aluminum louvers Overhead doors / grille at loading dock Refer to enlarged elevation detail Ped Bridge BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-

  38. Slide 38: Wall Stone & Aluminum Trim at Pavilion, Podium, & Retail Liner

    Exterior Materials Wall Stone & Aluminum Trim at Pavilion, Podium, & Retail Liner Sherwin-Williams Fluropon Continuum Finish, Silver color range, Mullions at glazing, and Aluminum return at stone panels at columns & spandrel Limestone panels and column cladding, honed finish Granite base, charcoal g

  39. Slide 39: Tower Facade Signage

    enlarged elevation plan & section details Tower Facade Signage BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  40. Slide 40: Skyline View - Building Lighting

    exterior lighting Skyline View - Building Lighting BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  41. Slide 41: Tower & Pavilion - Building Lighting

    exterior lighting Tower & Pavilion - Building Lighting BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  42. Slide 42: Special Event Lighting Concepts - Examples

    exterior lighting Special Event Lighting Concepts - Examples Sherwin-Williams Blue & Red Breast Cancer Awareness Veterans’ Day Pride BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  43. Slide 43: Pavilion - Building Lighting

    exterior lighting Pavilion - Building Lighting BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  44. Slide 44: West 3rd Street Lobby & Pedestrian Bridge - Building Lighting

    exterior lighting West 3rd Street Lobby & Pedestrian Bridge - Building Lighting BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  45. Slide 45: Garage Plans - Level Plan

    Garage Plans Level 1 Plan Surface Parking Garage Exit West 3rd Street Retail Liner Surface Parking Pedestrian Entry Garage Entry Vacated Frankfort Ave BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  46. Slide 46: East Elevation of Tower and Garage - West 3rd Street

    Garage Elevations East Elevation of Tower and Garage - West 3rd Street Refer to tower chapter Refer to enlarged elevation detail BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  47. Slide 47: View from Frankfort Ave. and West 3rd St. - Including Revised Garage Massing

    Renderings View from Frankfort Ave. and West 3rd St. - Including Revised Garage Massing Note: refer to landscape renderings for sitework. BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  48. Slide 48: East Elevation - West 3rd Street

    Garage Elevations East Elevation - West 3rd Street Note: refer to landscape renderings for sitework. BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  49. Slide 49: East Elevation - West 3rd Street

    Garage Elevations East Elevation - West 3rd Street High-performance vision glass Aluminum accent trim at mullions Aluminum coping trim band High-performance translucent glass Spandrel glass Clear vision glass Aluminum & glass entry doors Retail liner tenant space Limestone-clad columns & spandrel No

  50. Slide 50: Garage at Retail Liner at W 3rd Street

    enlarged elevation plan & section details LEGEND Garage at Retail Liner at W 3rd Street 1. 2. High-performance vision glass High-performance spandrel glass 3. Formed aluminum coping band 4. Formed aluminum accent band 5. Limestone panels 6. Limestone clad columns 17 7. Aluminum return at stone panel

  51. Slide 51: South Elevation - Vacated Frankfort Avenue

    Garage Elevations South Elevation - Vacated Frankfort Avenue Finished cast-in-place concrete column Aluminum trim expression at column Finished cast-in-place concrete Open air for ventilation Perforated metal panel (artwork TBD) Perforated metal panel Cast-in-place conc with formliner & profiles Alu

  52. Slide 52: Garage South Facade - Perforated Metal & Concrete

    Exterior Materials Garage South Facade - Perforated Metal & Concrete Fluted rib formed concrete with integral color Perforated metal panel with silver-colored aluminum mullion Smooth finished cast-in-place concrete Perforated metal panel with silver-colored aluminum mullion, with public art (artwork

  53. Slide 53: Garage West and North Facades - Tensile Cladding Scrim Precedents

    Exterior Materials Garage West and North Facades - Tensile Cladding Scrim Precedents Crocker Park, Westlake OHh View of scrim from the interior FBI Milwaukee, HGA Architects FBI Milwaukee, HGA Architects FBI San Diego, HGA Architects FBI San Diego, HGA Architects Garage Enclosure Rendering Precedent

  54. Slide 54: View From St. Clair Ave. at West 6th St. - Existing Conditions

    Garage Elevations View From St. Clair Ave. at West 6th St. - Existing Conditions BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  55. Slide 55: View From St. Clair Ave. at West 6th St. - Proposed

    Garage Elevations View From St. Clair Ave. at West 6th St. - Proposed BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  56. Slide 56: Headquarters Campus Landscape Plan

    LANDSCAPE Headquarters Campus Landscape Plan SAINT CLAIR AVE. LEGEND A EXISTING TREE TO REMAIN A B STREET TREES GARAGE PARCEL ‘A’ B W 3RD W 6TH VACATED FRANKFORT AVE. B FRANKFORT AVE. A B PAVILION PARCEL ‘C’ B OFFICE TOWER PARCEL ‘B’ A B Diagram North B W SUPERIOR AVE. BUILDING OUR FUTURE 30 Novembe

  57. Slide 57: Site Plan - North Block & Garage

    LANDSCAPE Site Plan - North Block & Garage LEGEND SAINT CLAIR AVE. K A A EXISTING TREE TO REMAIN B STREET TREES C SHADE TREE C D O R N A M E N TA L P L A N T I N G ( PA R K I N G L O T S C R E E N I N G ) W 6TH E N O T AT PA R C E L ‘ A’ A F N O T AT PA R C E L ‘ A’ C G N O T AT PA R C E L ‘ A’ W 3R

  58. Slide 58: Site Plan - South Block & Tower

    LANDSCAPE Site Plan - South Block & Tower LEGEND A EXISTING TREE TO REMAIN B STREET TREES I B VACATED FRANKFORT AVE. N I F C SHADE TREE L H D O R N A M E N TA L P L A N T I N G ( PA R K I N G L O T S C R E E N I N G ) A B E N O T AT PA R C E L ‘ B ’ C D F TRUCK PULL-UP ZONE C OFFICE TOWER G N O T AT

  59. Slide 59: Site Plan - Pavilion Block

    LANDSCAPE Site Plan - Pavilion Block LEGEND A EXISTING TREE TO REMAIN B STREET TREES C SHADE TREE B M D O R N A M E N TA L P L A N T I N G B B E COLOR GARDEN F N O T AT PA R C E L ‘ C ’ D PAVILION G ENTRY PLAZA PARCEL ‘C’ H LAWN I I A I S P E C I A L PAV I N G L G E A J L AY- B Y / D R O P O F F J A

  60. Slide 60: Site view - Pavilion Site Aerial View from the East

    LANDSCAPE Site view - Pavilion Site Aerial View from the East BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  61. Slide 61: Site view - Pavilion Entry Garden from West Roadway

    LANDSCAPE Site view - Pavilion Entry Garden from West Roadway BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  62. Slide 62: Site view - Pavilion Entry Garden Approach

    LANDSCAPE Site view - Pavilion Entry Garden Approach BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  63. Slide 63: Site view - Pavilion Entry Garden looking East

    LANDSCAPE Site view - Pavilion Entry Garden looking East BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  64. Slide 64: Site view - Pavilion View from W Superior and W Roadway

    LANDSCAPE Site view - Pavilion View from W Superior and W Roadway BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  65. Slide 65: Site view - Pavilion Block Sidewalk at W Superior Ave

    LANDSCAPE Site view - Pavilion Block Sidewalk at W Superior Ave BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  66. Slide 66: Site view - Tower View from W 3rd Street

    LANDSCAPE Site view - Tower View from W 3rd Street BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  67. Slide 67: Site view - Tower Lobby from W Superior Ave

    LANDSCAPE Site view - Tower Lobby from W Superior Ave BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  68. Slide 68: Site view - Vacated Frankfort looking East

    LANDSCAPE Site view - Vacated Frankfort looking East BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHERWIN-WILLIAMS COMPANY

  69. Slide 69: Tree Species Selection

    LANDSCAPE Tree Species Selection QR CV BN UD RED OAK Winter King Hawthorn River Birch Emerald Sunshine Elm Quercus rubra Crataegus viridis ‘Winter King’ Betula nigra ‘Heritage’ Ulmus davidiana ‘Emerald Sunshine’ BUILDING OUR FUTURE 30 November 2021 City of Cleveland Design Review PROPERTY OF THE SHE

  70. Slide 70: Planting Species Selections

    LANDSCAPE Planting Species Selections TC IV LS QR AT Foam Flower Blue Flag Blue Cardinal Flower Obedient Plant Lady Fern Tiarella cordifolia Iris versicolor Lobelia siphilitica Physostegia virginiana Athyrium thelypterioides LB VA SS ES CL Spice Bush Mapleleaf Viburnum Little Bluestem Purple Lovegra

  71. Slide 71: Site Lighting

    LANDSCAPE Sample Light Fixture Types Site Lighting Surface Sample LightParking FixtureLotTypes: Area Light +/~25' pole: Surface Parking Lot Area Light +/~25' pole: Frankfurt Avenue Street Light +/- 30' pole: Frankfurt Avenue Street Light +/- 30' pole: Typical Pedestrian Pathway Light Typical Pedestr

  72. Slide 72: Site Plan - Garage Shifted 5 ft, Planting Zone Increased

    LANDSCAPE Site Plan - Garage Shifted 5 ft, Planting Zone Increased SAINT CLAIR AVE. LEGEND A EXISTING TREE TO REMAIN A B STREET TREES GARAGE PARCEL ‘A’ B W 3RD W 6TH VACATED FRANKFORT AVE. B FRANKFORT AVE. A B PAVILION PARCEL ‘C’ B OFFICE TOWER PARCEL ‘B’ A B Diagram North B W SUPERIOR AVE. BUILDING

  73. Slide 73: Landscape Plan - Garage, Parcel 'A' - Garage Shifted 5 ft, Planting Zone Increased

    LANDSCAPE Landscape Plan - Garage, Parcel ‘A’ - Garage Shifted 5 ft, Planting Zone Increased LEGEND SAINT CLAIR AVE. K A A EXISTING TREE TO REMAIN B STREET TREES C SHADE TREE C D O R N A M E N TA L P L A N T I N G ( PA R K I N G L O T S C R E E N I N G ) W 6TH E N O T AT PA R C E L ‘ A’ A F N O T AT