    Yukon’s Next Copper Producer Corporate Presentation October 2026 TSX-V: SCMI | OTCQX: SKRKF | FRA: IO20 selkirkcopper.com

  2. Slide 2: Forward Looking Statement, Cautionary Notes and Technical Disclosure

    Forward Looking Statement, Cautionary Notes and Technical Disclosure Disclaimer Recipients of this corporate presentation (“Presentation”) who are considering acquiring securities of Selkirk Copper Mines Inc. (the “Company”) are cautioned that this Presentation is for information purposes only and i

  3. Slide 3: Forward Looking Statement, Cautionary Notes and Technical Disclosure

    Forward Looking Statement, Cautionary Notes and Technical Disclosure Industry and Market Data This Presentation includes market and industry data and forecasts that were obtained from third-party sources, industry publications and publicly available information. Third-party sources generally state t

  4. Slide 4: Corporate Overview

    Corporate Overview Cornerstone investment by the Selkirk First Nation Capitalization 38% Basic Shares Outstanding M 158.6 Retail / HNW Selkirk First Nation — 18% Options M 8.8 18% • Acquired 100% ownership of the Minto Warrants (avg C$0.50) M 3.7 Selkirk First Project through bankruptcy and vended i

  5. Slide 5: Located in Central Yukon with Established Infrastructure

    Located in Central Yukon with Established Infrastructure ▪ Location: West of the Yukon River, ~20 km WNW of Minto Port Access Landing and ~250 km by road from Whitehorse via Yukon direct access to port of Skagway Highway 2 ▪ Access: Chartered air service from Whitehorse to an on-site airstrip, plus

  6. Slide 6: Project Layout: C$330M of Infrastructure in Place

    Project Layout C$330M of Infrastructure in Place 6

  7. Slide 7: An Updated Approach for Minto

    An Updated Approach for Minto Boots on the Ground, Collaborative Selkirk First Nation Engagement, with a Planning Focus Boots on the Ground – this asset has been undermanaged for ~10 years – the Selkirk Copper Team is committed to changing that Social License – Selkirk Copper’s advancement of the Mi

  8. Slide 8: Preliminary Economic Assessment (PEA) Objectives

    Preliminary Economic Assessment (PEA) Objectives October 2025 Resource Drilling and PEA Study Objectives – Scorecard ✓ 2x Increase in Indicated & Inferred Resource – increased Indicated & Inferred by 280% ✓ 12-15 year mine life – delivered a 13 year mine life ✓ 4,100 tpd (1.5 Mtpa) mine and mill thr

  9. Slide 9: Minto PEA Results

    Minto PEA Results Established Infrastructure Drives Low Initial Capital Cost and Rapid Payback Payback (Years) 1.9 1.3 1.0 13 Years C$186M After-tax NPV (7%) Mine Life Initial Capex 96% IRR C$1.4B 78% NPV 1.5 Mtpa 7.9:1 C$1.0B Throughput LOM Open Pit Strip Ratio NPV 48% C$291M C$141M C$494M NPV Annu

  10. Slide 10: Minto PEA Production Profile

    Minto PEA Production Profile Platform to Extend Mine Life and Increase Annual Production by up to 20% LOM Payable Copper LOM Payable Gold LOM Payable Silver 377 Mlbs 225 Koz 1,387 Koz Opportunities to extend mine life from near mine expansion targets 80 Copper Gold (CuEq) Silver (CuEq) Payable CuEq

  11. Slide 11: Minto PEA Financial Metrics

    Minto PEA Financial Metrics Strong Leverage to Spot Copper Prices and to Increases in Gold & Silver Prices Initial Capital AVERAGE ANNUAL FREE CASH FLOW C$186M C$83M at Base Case | C$146M at Spot $300 $2,000 C$1.7B Annual Free Cash Flow After-Tax (C$M) Cumulative Free Cash Flow After-Tax (C$M) $225

  12. Slide 12: Minto Restart Initial Capital Cost Breakdown

    Minto Restart Initial Capital Cost Breakdown Classification Amount (C$) Site General Site General $2,393,739 Contingency Mining $77,599,853 Processing $12,007,668 Surface facilities $10,178,348 Mining Transportation $200,013 Indirect Costs Tailings Ponds & Disposal $6,571,396 Indirect costs $54,339,

  13. Slide 13: Exploration Driving Growth in Mineral Resources

    Exploration Driving Growth in Mineral Resources New Discoveries Proving Unrecognized Potential of the Minto Project Growth in Total Tonnes 2026 MRE: Significant Discoveries and Expansions Measured Indicated Inferred Expansion Discovery 47.5 202 Lens, Minto North 117 Lens, Minto Main • 238% expansion

  14. Slide 14: Growth in Known Lenses and New Discoveries

    Growth in Known Lenses and New Discoveries 280% Increase in Indicated & Inferred Resource Tonnage 14

  15. Slide 15: Exploration Opportunities

    Exploration Opportunities Developing a Target Pipeline for Resource Growth and New Discoveries Near Mine Objective Regional Objective Continue delineation of new resources to support the mine Make new discoveries by applying knowledge within highly restart decision prospective, under-explored distri

  16. Slide 16: 2026 Mineral Resource Estimate

    2026 Mineral Resource Estimate Grade Contained Metal Type Class Tonnage Cu(%) Au (g/t) Ag (g/t) Cu (Mlbs) Au (Koz) Ag (Koz) Open Indicated 21,779 0.59 0.17 1.8 283 122 1,294 Pit Inferred 7,052 0.55 0.13 1.6 85 30 354 Measured 348 0.92 0.39 3.3 7 4 36 Indicated 25,679 1.15 0.49 4.4 650 404 3,638 UG M

  17. Slide 17: Mine Design

    Mine Design Integrated Underground and Open Pit Mine Planning • Open pit and underground mining designed to extract copper-gold-silver mineralization defined in the 2026 MRE • Underground mining will be carried out in Minto North, Minto East, Copper Keel, and Area 118 deposits using long hole open s

  18. Slide 18: Process Flowsheet

    Process Flowsheet Investing in critical process equipment in a well-established flowsheet to improve throughput and recovery OVERVIEW • Conventional flowsheet comprising run-of-mine ore stockpile, three-stage crushing, SAG and ball mill grinding, gravity concentration, flotation, concentrate thicken

  19. Slide 19: Process Plant

    Process Plant Infrastructure with a Well-Established Operating History Existing Infrastructure Pre-Capex PEA (Capex) Scope • Buildings and mill infrastructure • Life safety pipework repairs (i.e. • HVAC repair is intact and structurally sound firewater line, shower/eyewash) • Crane hoist (high-speed

  20. Slide 20: Feasibility Study Objectives

    Feasibility Study Objectives Grade Improvement, Mining & Milling Rate, Metallurgical Recovery, and Metal Production • Resource Update – upgrade Indicated & Inferred Resources to Measured & Indicated, focus on grade improvement opportunities • Mine Life – maintain initial 13 year mine life, increase

  21. Slide 21: Appendix

    Appendix

  22. Slide 22: Leadership Team

    Leadership Team Colin Joudrie Josh Kierce, CPA Justin Stevens Scott Fulton Kevin McGinty Stacie Jones CEO, Director CFO VP Corporate VP Engineering VP Lands and VP Exploration Development • Professional engineer Environment • Professional Geologist • Over 30 years of • Nine years of • 10 years of ex

  23. Slide 23: Contact

    colin.joudrie@selkirkcopper.com 604-760-3157 justin.stevens@selkirkcopper.com 604-240-2959 23