Fresnillo Plc · LSE:FRES

Fresnillo — FY2023 Earnings Presentation

43 slides from Fresnillo's earnings presentation, Mar 5, 2024

  1. Slide 1: Full Year Preliminary Results

    FULL YEAR P R E L I M I N A RY R E S U LT S 05 MARCH 2024 LSE: FRES BMV: FRES www.fresnilloplc.com

  2. Slide 2: Disclaimer

    DISCLAIMER 2 This document includes statements that are, or may be deemed to be, “forward-looking A number of factors could cause results and developments to differ materially from those statements”. These forward-looking statements can be identified by the use of forward- expressed or implied by th

  3. Slide 3: Agenda

    AGENDA 3 01 Highlights 02 HSECR 03 Operational & projects performance 04 Reserves, resources & exploration update 05 Financial performance 06 2024 outlook

  4. Slide 4: Highlights

    HIGHLIGHTS OCTAVIO ALVÍDREZ

  5. Slide 5: Delivering Long-Term Value

    2 0 2 3 P R E L I M I N A RY R E S U LT S – I N V E S T M E N T P R O P O S I T I O N 5 DELIVERING LONG-TERM VALUE WORLD’S #1 SILVER SUBSTANTIAL GOLD HIGH QUALITY PRODUCER PRODUCTION MINING ASSETS 56.3 Moz 610.6 koz 2.2 Boz 37.9Moz of silver in 2023 of gold in 2023 Silver Resources Gold Resources HE

  6. Slide 6: Preliminary Financial Performance Highlights

    2 0 2 3 P R E L I M I N A R Y R E S U LT S – F I N A N C I A L P E R F O R M A N C E H I G H L I G H T S 6 TOTAL REVENUE (US$) ADJUSTED EPS* (US CENTS PER SHARE) 2,705.1M 31.0US¢ per share OPERATING PROFIT (US$) EBITDA MARGIN 142.5M 24.2% EBITDA (US$) CASH ON HAND AT 31 DEC 2023 (US$) 655.7M 534.6M

  7. Slide 7: HSECR

    HSECR OCTAVIO ALVÍDREZ

  8. Slide 8: HSECR: Sustainability Is Core to Our Purpose

    2 0 2 3 P R E L I M I N A RY R E S U LT S – H S E C R 8 S U S TA I N A B I L I T Y I S C O R E T O O U R P U R P O S E : “ T O C O N T R I B U T E T O T H E W E L L B E I N G O F P E O P L E T H R O U G H T H E S U S TA I N A B L E M I N I N G O F S I LV E R A N D G O L D ” HEALTH ENVIRONMENT COMMUN

  9. Slide 9: Operational & Projects Performance

    O P E R AT I O N A L & PROJECTS PERFORMANCE TOMÁS ITURRIAGA

  10. Slide 10: Operations: Fresnillo

    2 0 2 3 P R E L I M I N A RY R E S U LT S – O P E R AT I O N S 10 FRESNILLO Production Grade KEY ACTIONS 16 350 Million Ounces 14 • Deepening of the San Carlos shaft concluded. 300 12 • Permits to tie in the Pyrites Plant at Fresnillo were granted in 2Q23 with Grams/tonne 10 250 commissioning and ra

  11. Slide 11: Operations: Saucito

    2 0 2 3 P R E L I M I N A RY R E S U LT S – O P E R AT I O N S 11 SAUCITO Production Grade 20 350 Million Ounces 18 16 300 14 Grams/tonne 12 250 10 8 200 6 4 150 2 0 100 KEY ACTIONS 2019 2020 2021 2022 2023 2024e • Volume of ore processed increased, however it was impacted by equipment KEY OPERATING

  12. Slide 12: Operations: Juanicipio

    2 0 2 3 P R E L I M I N A RY R E S U LT S – O P E R AT I O N S 12 J U A N I C I P I O ( J V W I T H M A G S I LV E R . F R E S N I L L O : 5 6 % ) KEY OPERATING HIGHLIGHTS FY23 Silver production – moz 9,415 Gold production – koz 20.6 Cost per tonne - US$ 114.8 Cash cost - US$/oz of Ag 6.8 AISC – US$

  13. Slide 13: Operations: Herradura

    2 0 2 3 P R E L I M I N A RY R E S U LT S – O P E R AT I O N S 13 HERRADURA Gold Production Production Gold Ore Grade Grade KEY ACTIONS 6 0.8 • Annual gold production increased year-on-year as a result of the higher ore grade 0.75 5 in the sulphides and positive variations with the geological model

  14. Slide 14: Operations: Other Operations

    2 0 2 3 P R E L I M I N A RY R E S U LT S – O P E R AT I O N S 14 O T H E R O P E R AT I O N S SAN JULIÁN • Exploration continued in the area however no additional resources were discovered at San Julián DOB, which is entering its final year of operation. • The recovery of ore panels under paste fil

  15. Slide 15: 2024 Focus – Northern Region

    2024 FOCUS – NORTHERN REGION 15 HERRADURA • Operational turnaround initiative launched • Mine redesign study • Maintenance efficiency programme • Metallurgical recovery optimisation opportunities (Leach Pads) • Consolidation of Herradura District to maximise return over installed capacity • Herradur

  16. Slide 16: Reserves, Resources & Exploration Update

    RESERVES, RESOURCES & E X P L O R AT I O N U P D AT E GUILLERMO GASTÉLUM

  17. Slide 17: Strong Silver Resource & Reserves Bases

    RESERVES & RESOURCES 17 S T R O N G S I LV E R R E S O U R C E & R E S E R V E S B A S E S SILVER RESOURCES RESOURCES CHANGE 2,219Moz Total silver resources 2023 2,219,713 2022** 2,203,872 Koz +15,841 % +0.7% • Positive exploration results at the Guanajuato greenfields project and at San Julián vein

  18. Slide 18: Strong Gold Resource & Reserve Bases

    RESERVES & RESOURCES 18 STRONG GOLD RESOURCE & RESERVE BASES CHANGE RESOURCES GOLD RESOURCES 2023 2022** Koz % 37.9Moz Total gold resources 37,937 39,109 -1,172 -3.1% • Positive exploration results at the Guanajuato greenfields project and at Centauro Profundo. • Gold in consolidated overall mineral

  19. Slide 19: Projects: Orisyvo, Rodeo & Guanajuato

    2 0 2 3 P R E L I M I N A RY R E S U LT S – P R O J E C T S 19 S T R O N G P R O J E C T S F O R T H E F U T U R E - O R I S Y V O , R O D E O & G U A N A J U AT O ORISYVO (GOLD) RODEO (GOLD) GUANAJUATO (SILVER / GOLD) TAJITOS (GOLD) • Several pre-feasibility level studies are • Continued to strengt

  20. Slide 20: Exploration Update

    2 0 2 3 P R E L I M I N A RY R E S U LT S – E X P L O R AT I O N U P D AT E 20 2024 Budget: US$190 m 2023 Highlights: 42% ▪ Invested US$185.9 million of risk capital in exploration during the year. Mine Good exploration results at Fresnillo, San Julian, and Guanajuato. Operations ▪ Pre-feasibility l

  21. Slide 21: Financial Performance

    FINANCIAL PERFORMANCE MARIO ARREGUÍN

  22. Slide 22: Income Statement (IFRS)

    2 0 2 3 P R E L I M I N A R Y R E S U LT S – I N C O M E S TAT E M E N T ( I F R S ) 22 (MILLION USD) ACCUM DECEMBER CHANGE CONCEPT 2023 % 2022 % $ % ADJUSTED REVENUES 2,869.1 2,597.2 271.9 10.5 HEDGING (METALS) 0.0 (3.8) 3.8 N/A TREATMENT AND REFINING CHARGES (164.0) (160.5) (3.5) (2.2) REVENUES 2,

  23. Slide 23: Adjusted Production Cost Analysis

    2 0 2 3 P R E L I M I N A R Y R E S U LT S – A D J U S T E D P R O D U C T I O N C O S T A N A LY S I S 23 ( C O N S O L I D AT E D ) CHANGE YTD 23 YTD 22 $ % Adjusted Production Cost 1,624.1 1,445.8 +178.2* +12.3 Change in inventories and others 78.5 -59.0 +137.5 N/A Depreciation 497.3 500.6 -3.3 -

  24. Slide 24: Gross Profit Analysis

    ( C O N S O L I D AT E D ) 0.0 75.0 150.0 225.0 300.0 375.0 450.0 525.0 (75.0) Higher volume of ore processed at USD MILLION 1 Juanicipio 206.2 (Ramp-up and plant start-up) Higher Metal Prices 2 (Au +9.1% and Ag +8.1%) 192.9 Gold Inventory Adjustment at Herradura Gross Profit 3 (+30,700.4 oz) 30.9 L

  25. Slide 25: Cash Flow (IFRS)

    2 0 2 3 P R E L I M I N A R Y R E S U LT S – C A S H F L O W ( I F R S ) 25 (MILLION USD) YEAR TO DATE CHANGE CONCEPT 2023 2022 $ % CASH GENERATED BY OPERATIONS BEFORE CHANGES IN WORKING CAPITAL 649.3 743.1 (93.7) (12.6) WORKING CAPITAL 20.6 (66.1) 86.8 N/A INCOME TAX AND PROFIT SHARING PAID (244.0)

  26. Slide 26: Balance Sheet (IFRS)

    2 0 2 3 P R E L I M I N A R Y R E S U LT S – B A L A N C E S H E E T ( I F R S ) 26 (MILLION USD) Change Concept 31-DEC-23 31-DEC-22 % Assets Cash and Investments 534.6 969.1 (44.8) Trade and Other Receivables 482.4 404.5 19.3 Inventories 532.7 587.4 (9.3) Prepaid Expenses 23.2 34.4 (32.7) Silverstr

  27. Slide 27: 2024 Outlook

    2024 OUTLOOK OCTAVIO ALVÍDREZ

  28. Slide 28: Expected Attributable Production Profile

    2 0 2 3 P R E L I M I N A R Y R E S U LT S – E X P E C T E D AT T R I B U TA B L E P R O D U C T I O N 28 PROFILE Production guidance range +/- 5% Million Oz Silver* Thousand Oz Gold 80 700 70 600 60 500 50 4 400 40 300 30 200 20 10 100 0 0 2023 2024 2025 2026 2023 2024 2025 2026 Thousand Tons Lead

  29. Slide 29: Capex Spend Expectations

    2 0 2 3 P R E L I M I N A R Y R E S U LT S – C A P E X S P E N D E X P E C TAT I O N S 29 Million Usd 700 600 • Total sustaining capex for 20244 for all of the 485 490 500 mines, along with a small part for new 500 440 projects approved, is expected to be 400 US$440m 300 • Projects not approved are

  30. Slide 30: Consolidated Outlook

    1 2 2 0 2 3 P R E L I M I N A R Y R E S U LT S – C O N S O L I D AT E D O U T L O O K 30 1 Greenfield project development to be complemented with brownfield growth possibilities at the Herradura and Guanajuato Centro Districts. (1) Total annual average production Subject to pre-feasability and feasa

  31. Slide 31: Concluding Remarks

    2 0 2 3 P R E L I M I N A RY R E S U LT S – C O N C L U D I N G R E M A R K S 31 PRIORITISE SAFETY FOCUS ON CAPITAL ALLOCATION CONTINUED CONFIDENCE IN THE CULTURE ACROSS OPERATIONAL DISCIPLINE ACROSS PROGRESS AT OUR LONG-TERM OUR SITES FOR BOTH EFFICIENCIES AND CURRENT ADVANCED STRENGTH AND EMPLOYEE

  32. Slide 32: Appendix

    APPENDIX

  33. Slide 33: Grade Expectations

    G R A D E E X P E C TAT I O N S F O R 2 0 2 4 33 GOLD (G/T) MINE MINE TYPE FY 2024e FY 2023 Fresnillo Underground silver 0.60-0.70 0.61 Saucito Underground silver 1.10-1.30 1.34 Juanicipio Underground silver - 1.27 San Julián (veins) Underground silver & gold 1.00-1.20 1.17 San Julián (disseminated)

  34. Slide 34: Operations: San Julián

    2 0 2 3 P R E L I M I N A RY R E S U LT S – O P E R AT I O N S 34 SAN JULIÁN (VEIN SYSTEM) S A N J U L I Á N ( D I S S E M I N AT E D O R E B O D Y ) KEY OPERATING HIGHLIGHTS 2023 2022 KEY OPERATING HIGHLIGHTS 2023 2022 Gold production – koz 41.0 43.4 Gold production – koz 3.5 3.3 Silver production

  35. Slide 35: Operations: Ciénega

    2 0 2 3 P R E L I M I N A RY R E S U LT S – O P E R AT I O N S 35 CIÉNEGA KEY ACTIONS • Several initiatives were implemented to decrease personnel rotation, with the impact expected to materialise in 2024. • The contractor base was optimised and the productivity of unionised personnel increased. • S

  36. Slide 36: Operations: Noche Buena

    2 0 2 3 P R E L I M I N A RY R E S U LT S – O P E R AT I O N S 36 NOCHE BUENA KEY ACTIONS • The mine closure plan commenced. • Ore extraction ended in 2Q 2023 but gold recovery from the leaching pads continued. KEY OPERATING HIGHLIGHTS 2023 2022 Silver production – koz 10 20 Gold production – koz 42

  37. Slide 37: Contribution to Adjusted Revenues by Metal

    2 0 2 3 P R E L I M I N A R Y R E S U LT S – C O N T R I B U T I O N B Y M I N E A N D B Y M E TA L 37 TO ADJUSTED REVENUES 2023 2023 ADJUSTED REVENUES : US$2,869.1M ACCUM DECEMBER CHANGE BY: P R O D U C T (Million USD) 2023 2022 VOLUME PRICE TOTAL GOLD 1,186.2 1,114.2 (27.8) 99.8 72.0 SILVER 1,310.

  38. Slide 38: Contribution to Adjusted Revenues by Mine and Metal

    2 0 2 3 P R E L I M I N A R Y R E S U LT S – C O N T R I B U T I O N B Y M I N E A N D B Y M E TA L 38 TO ADJUSTED REVENUES 2023 2023 ADJUSTED REVENUES 1 : US$2,869.1M By mine By metal Fresnillo Saucito Ciénega Herradura Silver Gold Noche Buena San Julián DOB San Julián Veins Juanicipio Lead Zinc Fr

  39. Slide 39: Exploration Expenditure by Area

    2 0 2 3 P R E L I M I N A R Y R E S U LT S – I N C O M E S TAT E M E N T ( I F R S ) 39 (MILLION USD) ACCUM DIC 2023 (Million USD) Operating Units  Fresnillo 22.9  Saucito 13.5  Ciénega 6.7  San Julián 19.6  Herradura 5.7  Noche Buena 0.7  Juanicipio 7.3  76.4  Projects Guanajuato 18.6  V

  40. Slide 40: Cash Flow (IFRS)

    2 0 2 3 P R E L I M I N A R Y R E S U LT S – C A S H F L O W ( I F R S ) 40 • Decrease in inventories +US$54.6 million (MILLION USD) • Decrease in prepayments and other assets +US$10.4 million • Increase in trade and other accounts receivables YEAR TO DATEreceivables from related parties • (-US$45.6

  41. Slide 41: Consolidated Cost Inflation 2023

    2 0 2 3 P R E L I M I N A R Y R E S U LT S – C O N S O L I D AT E D C O S T I N F L AT I O N 2 0 2 3 41 (USD BASED) Consolidated Unit Price Weighted Increase % Weight (*) Average Labour Unionized Personnel 22.8% 8.8% 2.0% Employees 21.8% 4.2% 0.9% Weighted 22.5% Operating Materials 3.8% 16.6% 0.6% E

  42. Slide 42: Adjusted Production Cost 2023

    2 0 2 3 P R E L I M I N A R Y R E S U LT S – A D J U S T E D P R O D U C T I O N C O S T - 2 0 2 3 42 2023 ADJUSTED PRODUCTION COST : US$1,622.0M Operating Materials Costs from Contractors = 24% = US$385.4 M 24% Own 18% Ctrt. 6% Maintenance & repairs 20% Own 18 % Energy 17% Ctrt. 2% Own 16% Ctrt. 1%

  43. Slide 43: Notes

    NOTES 43 4