Cascadia Minerals Ltd · TSXV:CAM

Cascadia Minerals — Investor Presentation (April 2026)

20 slides from Cascadia Minerals's investor presentation, Apr 27, 2026

  1. Slide 1: Corporate Presentation – April 27, 2026

    TSXV: CAM OTCQB: CAMNF Corporate Presentation – April 27, 2026

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements FORWARD-LOOKING STATEMENTS This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to the success of exploration activities. These statements are based on in

  3. Slide 3: Cascadia Corporate Overview

    Cascadia Corporate Overview 6-Month Stock Performance Capital Structure (Apr 27, 2026) (TSX-V: CAM) Shares Outstanding 206,824,466 Warrants ($0.15 - $0.45) 63,306,234 Options ($0.15 - $0.80) 6,678,750 Restricted Stock Units 463,334 Fully Diluted 277,272,784 Market Capitalization $65 million Working

  4. Slide 4: Exploring for Copper & Gold in Yukon, Canada

    Exploring for COPPER & GOLD in Yukon, Canada CARMACKS PROPERTY ✓ M&I Resource: 651 Mlbs Cu and 302 koz Au at 1% CuEq ✓ 2023 PEA: $330M Post-Tax NPV(5%) at US$4.25/lb Cu, US$2,000/oz Au ✓ District-scale discovery potential, 40 km from past- producing Minto Mine ✓ Road-Accessible, low cost of drilling

  5. Slide 5: Carmacks Property

    Carmacks Property ▸ Building Relationships: Traditional Territory of the Little Salmon Carmacks and Selkirk First Nations ▸ Robust Infrastructure: road-accessible, 10 km from power ▸ District Scale: 180 km2 land position in the Minto Copper Belt, 40 km southeast of the past-producing Minto Mine ▸ Ne

  6. Slide 6: Carmacks Deposit – 2023 PEA

    Carmacks Deposit – 2023 PEA Key Parameters • C$220M initial capital cost • Cu Recovery: 92% Sulfide, 55% Oxide • 9-year initial mine life • Au Recovery: 58% • 7,000 tonne per day mill • 34 M lbs CuEq/yr Base – $3.75 Cu, $1,800 Au, $22 Ag Case 1 – $4.25 Cu, $2,000 Au, $25 Ag ✓ $324M NPV5% pre-tax ✓ C

  7. Slide 7: Carmacks Deposit – Long Section & 2025 Drilling

    Carmacks Deposit – Long Section & 2025 Drilling Historic exploration focused on shallow copper oxide mineralization ▸ Historic resource focussed on shallow Copper Oxide 2025 ▸ 2025 Plan - 13 holes to test depth of drilling: sulphide 10 of 11 holes mineralization intersected and step sulphide out on

  8. Slide 8: Carmacks Property – 2025 Drilling

    Carmacks Property – 2025 Drilling 3,800 m expansion drill program completed in 2025 All zones remain open in multiple directions Numerous near-deposit targets for follow- up, including Zone 14 and the Gap Zone 8

  9. Slide 9: Carmacks Property – Zone 147, Section A

    Carmacks Property – Zone 147, Section A Mineralization remains open below the modeled resource Hole 37 returned a significant extension Zone 147 carries elevated of sulphide mineralization at depth copper and gold grades 9

  10. Slide 10: CD-25-033 Core Photos – Zone 147

    CD-25-033 Core Photos – Zone 147 10

  11. Slide 11: Carmacks Project – Near-Deposit IP Targets

    Carmacks Project – Near-Deposit IP Targets 2022 IP Survey identified numerous targets close to the deposit – minimal follow-up to date 11

  12. Slide 12: Minto Copper Belt – Untapped Regional Potential

    Minto Copper Belt – Untapped Regional Potential ▸ 180 km2, brownfields property covering large portion of the Minto Copper Belt towards Minto Mine ▸ Multiple near-deposit targets identified for follow-up, with four significant IP targets <1 km from current resource ▸ Goldspot completed digitization

  13. Slide 13: Carmacks Project Advancement

    Carmacks Project Advancement Rapid Advancement of a Near-Term Critical Minerals Project ✓ Acquisition of Granite Creek Copper closed in August 2025 ✓ 3,800 m resource expansion drill program completed in fall 2025 ❑ 15,000+ m fully-funded drill program commencing in April 2026 ❑ 2026 and 2027 drilli

  14. Slide 14: Agnico Eagle Strategic Exploration Alliance

    Agnico Eagle Strategic Exploration Alliance Multi-year Strategic Alliance focused on gold and copper exploration in Yukon’s Stikine Terrane Stikine Terrane extends into Yukon from BC’s Golden Triangle and is highly prospective for gold- copper porphyry mineralization Minimum of $500,000/yr of genera

  15. Slide 15: Corporate Strategy

    Corporate Strategy 1. Carmacks Project – 100% Owned Flagship Property  Fully-funded 15,000+ m drill program commencing in late April 2026  Approximately 10,000 m focused on step-outs to expand the existing deposit  Remaining 5,000 m will test near-deposit and regional targets outside the resource

  16. Slide 16: Thank you

    www.cascadiaminerals.com Thank you info@cascadiaminerals.com

  17. Slide 17: Other Properties

    @ Appendix Other Properties

  18. Slide 18: Rosy Property, Yukon

    Rosy Property, Yukon 61 km2 road accessible property located 77 km east of Whitehorse surrounding the Red Mountain Molybdenum deposit owned by Tintina Mines Ltd. Over 35 low sulphidation epithermal quartz- carbonate veins occur on the property Anomalous gold in soil over 3.8 x 2.5 km with untested h

  19. Slide 19: Idaho Creek Property, Yukon

    Idaho Creek Property, Yukon 14 km2 property located adjacent to Western Copper and Gold’s Casino Project, where Rio Tinto and Mitsubishi Materials are strategic investors 14 km east of the Casino Deposit, with Casino Suite aged intrusions mapped on property Casino Project proposed road route runs th

  20. Slide 20: Idaho Creek Property, Yukon

    Idaho Creek Property, Yukon 2006 drilling in the east portion of the property intersected 122 m of 0.12 g/t Au with 1.93 g/t Ag, ending in mineralization Rock samples have returned up to 10.08 g/t Au with 365 g/t Ag Large 5 x 1 km underexplored Au-Ag-Mo-Pb soil anomaly in the west portion of the pro

Cascadia Minerals — Investor Presentation (April 2026) on 6ix