Mandalay Resources — Technical Presentation (February 2015)
62 slides from Mandalay Resources's technical presentation, February 2015
Slide 1: Adding value through geology and exploration
FEBRUARY 2015 Adding value through geology and exploration The story behind Mandalay’s December 31, 2014, Mineral Resources and Reserves update.
Slide 2: Forward-looking Statements; Quality Control and Assurance
Forward-looking Statements This presentation contains "forward-looking statements" within the meaning of applicable securities laws, including statements relating to life of mine production plans and exploration plans and the growth and strategy of Mandalay. Readers are cautioned not to place undue
Slide 3: Mandalay vision
Mandalay vision To create exceptional shareholder value through the acquisition of undervalued assets that can rapidly become cash generative, self-fund exploration, establish and maintain high operating margins and return cash to shareholders within a planned period of time. Mandalay is committed t
Slide 4: Some reasons for undervalued mines – what we look for in an acquisition
Some reasons for undervalued mines– what we look for in an acquisition – Non-existent or non-compliant resource & reserve estimations – Poor reconciliations between reserves and production – Poor communications between geologists and engineers – Short mine lives or poor capacity utilization based on
Slide 5: Mandalay approach
Mandalay approach – Secure the base case with an independent, Ni 43-101-compliant resource and reserve estimation • Reduce risk with annual independent updates • Regular and rigorous reconciliations – Invest in basic geology & ore-forming hypotheses to support exploration • Radical reinterpretations
Slide 6: Three producing mines and a feasibility project, with two non-core projects in the process of sale
Three producing mines and a feasibility project, with two non-core projects in the process of sale X Lupin, Canada Bjorkdal, Sweden X Past Au Producer; Producing Au sale in process La Quebrada, Chile X Challacollo, Chile Feasibility Ag-Au Costerfield, Australia X Producing Au-Sb Cu-Ag resource; X sa
Slide 7: Resources and reserves grew faster than production
Resources and reserves grew faster than production 2014 2013 Resources1 (1) The end-of-year 2014 Mineral Resources summarized Au Ag Sb Au Ag Sb Cu here refer to the Mandalay press release dated February 17, 2015, based on independent estimates by Roscoe (cont. oz) (cont. oz) (cont. t) (cont. oz) (co
Slide 8: Resource and reserves growth
Resource and reserves growth Inferred Resources(1) Ag (cont. oz) Au (cont. oz) Sb (cont. t) 40,000,000 250,000 30,000 200,000 30,000,000 150,000 20,000 20,000,000 100,000 10,000,000 10,000 50,000 0 0 0 2010 2011 2012 2013 2014 2010 2011 2012 2013 2014 2010 2011 2012 2013 2014 M&I Resources(1) Ag (co
Slide 9: Björkdal gold mine, Sweden
Björkdal gold mine, Sweden Skellefteӓ Storheden Nylands Rönberget Björkdal Open pit and 9underground mine 2km
Slide 10: Björkdal Resources 2014 M&I 637,000 oz Au
See appendix for Tonnes Gold Gold footnotes to table (t) (g/t) (cont. oz) Björkdal Resources Open Pit 2014 M&I(1) Measured Indicated 2,481,000 1.65 132,000 637,000 oz Au Measured + 2,481,000 1.65 132,000 Indicated Inferred 790,000 1.1 29,000 • Eliminated all Measured– Underground Measured - - - QA/Q
Slide 11: Björkdal Reserves
Björkdal Reserves See appendix for footnotes to table 2014 P&P1 432,000 oz Au Historical • Eliminated all P&P Proven 324,000 oz • More Probable-- Au better mine plan • Grades higher Bjorkdal Historical Tonnes Grade Open-Pit Reserves Ounces (1,000’s) (g/t) Proven 49.6 1.48 2,366 Probable 5,454.4 1.04
Slide 12: Shift from unconstrained search ellipses to constrained wireframe resource model
Shift from generalized unconstrained search ellipses to highly constrained wireframe resource model 104 open pit wireframes 275 underground wireframes 12
Slide 13: Björkdal – previous concepts before MND
Björkdal-- previous concepts before MND Coarse free gold in sheeted quartz veins In footwall of major folded thrust putting ductile marble and meta- volcanic and sedimentary rocks over brittle granodiorite 70+ veins Veins mineralized down dip for 80m below thrust Open down-plunge BUT– mine
Slide 14: Björkdal – Initial MND findings after 4 months
Björkdal– Initial MND findings after 4 months • Evidence for a significant thrust is not compelling; in some underground exposures is non-existent. • Some rock logged and mapped as “granodiorite” is actually metasomatised sedimentary rock– bedding, cross-bedding, turbidites, microfossils? • Early op
Slide 15: Björkdal – emerging new thinking
Björkdal– emerging new thinking 15
Slide 16: Björkdal – exploration implications
Björkdal– exploration implications Mafic intrusive Sedimentary succession Open-pit outline N (mudstone and sandstone) Volcanics Volcano-clastics Björkdal mine B ‘Marble’ A’ Volcano- A clastics Granitic instrusive B’Granitic instrusive Metasomatised country-rock 5 km
Slide 17: Working hypotheses for gold distribution
Working hypotheses for gold distribution • Datamine™ iso-shell grade modelling has enabled identification of high-grade gold concentrations that are not defined by actual vein orientations • Indicates that high-Au endowments are likely within the current mine footprint Strike of high- grade trends S
Slide 18: 2015 Geology and exploration strategy
2015 Geology and exploration strategy • Complete independent NI 43-101 R&R estimates-- DONE • Improve sampling and mapping techniques plus integration and interpretation of existing data-sets to build more effective grade control model and exploration hypotheses (in progress) • Construct local assay
Slide 19: Ore Systems Analysis Programme (OSA)
Ore Systems Analysis Programme (OSA) • Analyse grade distribution • Identify grade orientations and unlock puzzles of near- mine exploration • ‘Test drilling’ recently commenced – High density diamond drilling programme; includes the use of fully oriented core and multi- element geochemical assaying
Slide 20: Cerro Bayo Ag-Au mine, Aysen, Chile
Cerro Bayo Chile Argentina Ag-Au mine, Aysen, Chile CB Plant Chile Chile Argentina Laguna Verde Consessions Boundary Chile Chico CB Plant Cerro Bayo 10 KM Scale 20
Slide 21: Cerro Bayo December 31, 2014
CERRO BAYO December 31, 2014 See appendix for full Resources(1) footnotes to tables Reserves(2) Tonnes Au Grade Ag Grade Au Ag (t) (g/t) (g/t) (cont. oz) (cont. oz) Measured 310,000 2.63 316 26,000 3,143,000 Indicated 1,685,000 3.28 323 178,000 17,525,000 Measured + 1,995,000 3.18 322 204,000 20,668
Slide 22: Cerro Bayo key breakthroughs
Cerro Bayo key breakthroughs • 2011 – Initial “inherited” reserves on developed veins approx. doubled due to (a) recognition of overly-conservative manual oreshoot boundaries in previous owner’s estimate, and (b) 61,500 m of additional drilling by MND. • 2011-2013 – MND drilling further increases ex
Slide 23: Cerro Bayo District – Target-rich land package
Cerro Bayo District– Target-rich land package 23
Slide 24: Existing & emerging veins around & under L. Verde
Existing & emerging veins around & under L. Verde 24
Slide 25: Long section of Coyita vein
Long section of Coyita vein Drilling 2014; see Appendix for assay data 25
Slide 26: Long section of Yasna vein
Long section of Yasna vein Drilling 2014; see Appendix for assay data 26
Slide 27: Long section of Irene vein
Long section of Irene vein Drilling 2014; see appendix for assay data 27
Slide 28: Long section of Kasia vein
Long section of Kasia vein Drilling 2014; see appendix for assay data 28
Slide 29: Long section of Dagny vein
Long section of Dagny vein Laguna Verde postmen. — omega im = IX MANDALAY RESOURCES TA erty see ts CIA. MINERA CERRO BAYO LTDA. 29 /X\ MANDALAY RESOURCES
Slide 30: Long section of Fabiola vein
Long section of Fabiola vein 30
Slide 31: Long section of Delia NW vein
Long section of Delia NW vein 31
Slide 32: Long section of Delia SE vein
Long section of Delia SE vein 32
Slide 33: Long section of Dalila vein
Long section of Dalila vein 33
Slide 34: Long section of Trinidad vein
Long section of Trinidad vein 34
Slide 35: Long section of Marcela Sur vein
Long section of Marcela Sur vein 35
Slide 36: Long section of Raul vein
Long section of Raul vein LITHOLOGY POST-MINERAL ] Gravels PRE-MINERAL. Dacitic Lithic Tuffs (Coigues unit ) IMM Cineritic (Coighes unit ) Rhyoltc Lithic and Crystal Tufts ( Temer Unit ) SX Post Mineral Fault DRILL ‘Symbology Assay color legend February, 2014 , @ > 200 gt Ageg @ Historic Drillholes
Slide 37: Major goals of 2015 exploration program
Major goals of 2015 exploration program • Complete infill drilling of Coyita, Yasna and other veins under Laguna Verde, northwest of Falla Peninsular, to convert to reserves • Extend Coyita, Yasna, and other veins under Laguna Verde southeast of Falla Peninsular to add new resource; convert if succe
Slide 38: Costerfield Operations – Recent Tenement Map
Costerfield Operations FEBRUARY 2015 Adding value through Recent Tenement Map geology and exploration The story behind Mandalay’s December 31, 2014, Mineral Resources and Reserves update.
Slide 39: Growing M&I resources while growing production rate
Growing M&I resourcesSeewhile growing production rate appendix for full footnotes to tables Au Sb Au Sb Resource(1) Tonnes Au Sb Reserve(2) Tonnes Au Sb Grade Grade Grade Grade Category (t) (oz) (t) Category (t) (oz) (t) (g/t) (%) (g/t) (%) Measured 213,000 9.8 4.5 67,000 9,600 Proven 98,000 10.4 4.
Slide 40: Key Breakthroughs
Key Breakthroughs 2010 • Establishment of an exploration team with more emphasis placed on increasing geological knowledge and understanding through re-interpretation of all available data. 2011 • Identification of mineralised panels that are off-set by flat faults - leads to discovery of the Cuffle
Slide 41: Costerfield District
Costerfield District Current Resource and Reserves with resource expansion of Cuffley continuing in 2015. Prospective regional targets within our exploration tenements Comparison Costerfield Augusta + to Known West Cuffley Geochem High Au-Sb High Sb-Au anomaly Strike Length 1500m 1700m AuEq Oz 700,0
Slide 42: Cuffley lode – exploration potential above and below King Cobra fault
Cuffley lode– exploration potential remains above and below King Cobra fault Intercept of potentially economic tenor below King Cobra fault 42
Slide 43: N-lode – untested potential below King Cobra fault
N- lode– exploration complete above King Cobra fault; untested potential remains below King Cobra fault 43
Slide 44: W-lode
W- lode– • No exploration potential remains above King Cobra fault and is about mined out there; • Untested potential below King Cobra fault 44
Slide 45: Near-mine expansion – Western Corridor
Near-mine expansion – “Western Corridor” Untested potential Mineralisation Identified in 2014 – Below King Cobra Untested potential to the west of current mining operations between major regional faults and below the King Cobra Fault. 45
Slide 46: 2015 Exploration Strategy
2015 Exploration Strategy • Infill drilling for more reserves - Complete infill drilling of Cuffley inferred resource (June 2015) • Extension Drilling - Test Cuffley and N-lode offset extension below the King Cobra Fault and in the Adder Fault ‘panels’ • Corridor Drilling – Test the high potential f
Slide 47: Challacollo Silver-Gold Project
CHALLACOLLO Iquique Silver-Gold Project PICA Antofagasta 10 Km 47
Slide 48: Challacollo Mineral Resources as of January 26, 2015
Challacollo Mineral Resources(1) as of January 26, 2015 Category Tonnes Au Grade Ag Grade Au Ag See appendix for full (t) (g/t) (g/t) (cont. oz) (cont. oz) footnotes to tables Measured - - - - - Indicated 4,700,000 0.32 200 49,000 30,097,000 Measured + 4,700,000 0.32 200 49,000 30,097,000 Indicated
Slide 49: Challacollo key breakthroughs
Challacollo key breakthroughs • 2014 – In-fill drilling converted Lolon resources from Inferred to Indicated and intersected parallel vein with similar grades and widths (Lolon East). Lolon resource still open at depth although vein narrows to 2-3 m true thickness. – Detailed mapping, sampling and s
Slide 50: Challacollo project – Lolon vein infilled and open
Challacollo project– Lolon vein infilled and open OPEN OPEN Short Hole OPEN Fault Gap 200 m 50
Slide 51: Challacollo emerging extensions and new vein targets
Challacollo emerging extensions and new vein targets Detailed Mapping Lucy Vein Millsite Vein 51
Slide 52: Next phase of exploration
Next phase of exploration • Extend Lolon drilling 150 m below Indicated Resource (target: add 2.0 Moz Ag to Indicated Resource). • Lolon Sur - Extend Lolon drilling 600m south of indicated resource (target: add 1.6 Moz Ag to Indicated Resource). • Lolon East - Deepen Lolon RC holes to intersect east
Slide 53: Appendix
APPENDIX 53
Slide 54: Björkdal Resource and Reserve Table Footnotes
Björkdal Resource Table Footnotes 1. Mineral Resources estimated as of December 31, 2014, and depleted for production through December 31, 2014. 2. Canadian Institute of Mining (“CIM”) standards were followed for estimating Mineral Resources. 3. Mineral Resources are inclusive of Mineral Reserves. 4
Slide 55: Cerro Bayo Resource and Reserve Table Footnotes
Cerro Bayo Resource Table Footnotes 1. Mineral Resources estimated as of December 31, 2014, and depleted for production through December 31, 2014. 2. Canadian Institute of Mining (“CIM”) standards were followed for estimating Mineral Resources. 3. Mineral Resources are inclusive of Mineral Reserves.
Slide 56: H2-2014 Coyita vein intercepts
H2-2014 Coyita vein intercepts Hole Intercept Intercept Intercept Gold Silver Hole Compl. Total Intercept Intercept From To True Hole_ID Elevation Length Grade Grade Date Depth UTM_E UTM_N m) (m) Width (m) (m) (g/t) (g/t) (m) (m) DLV15-001 1/14/2015 318.20 272297.29 4840678.9 10.09 288.15 289.95 1.8
Slide 57: H2-2014 Yasna, Irene and Kasia vein intercepts
H2-2014 Yasna vein intercepts Hole Intercept Intercept Intercept Gold Silver Hole Compl. Total Intercept Intercept From To True Hole_ID Elevation Length Grade Grade Date Depth UTM_E UTM_N m) (m) Width (m) (m) (g/t) (g/t) (m) (m) DLV14-022 17-06-2014 465.05 272054.5 4840617.3 -17.33 386.92 387.54 0.6
Slide 58: Costerfield Resource and Reserve Table Footnotes
Costerfield Resource Table Footnotes 1. Mineral Resources estimated as of December 31, 2014, and depleted for production through December 31, 2014. 2. Mineral Resources stated according to CIM guidelines and include Mineral Reserves. 3. Tonnes and contained gold (oz) are rounded to the nearest thous
Slide 59: Costerfield Drill Intercepts (July – December 2014)
Costerfield Drill Intercepts (July – December 2014) Hole Gold Grade Antimony Lode Hole ID Hole Depth (m) Completion Easting Northing RL True Width (m) (g/t) Grade (%) Date AD102 159.6 25/08/2014 15163 4586 984 0.27 1.6 0.0 AD103 159.1 28/08/2014 15174 4655 1000 0.14 1.7 0.0 AD104 171.2 19/09/2014 15
Slide 60: Challacollo Resource Table Footnotes
Challacollo Resource Table Footnotes 1. Mineral Resources estimated as of 31 December, 2014. 2. Mineral Resources stated according to CIM guidelines. 3. Totals may appear different from the sum of their components due to rounding. 4. Mineral Resources are estimated at a cut-off grade of 60 g/t Ag as
Slide 61: Challacollo Project – Lolon vein 2014 in-fill intercepts
Challacollo Project– Lolon vein- 2014 in-fill intercepts 61
Slide 62: Challacollo – New target testing – 2014 intercepts
Challacollo-- New target testing – 2014 intercepts 62