Slide 1: Investor Presentation – Tin for an Electric Tomorrow
Investor Presentation TIN FOR AN ELECTRIC TOMORROW For personal use only Investor Presentation – Sharewise & ShareCafe Webinars 29 August 2024 ASX:ELT elementos.com.au
Slide 2: Cautionary statement
Cautionary statement For personal use only This Presentation provides general background information about Elementos Limited’s (“Company’s”) activities. That information is current at the date of this Of the Mineral Resources scheduled for extraction in the Study mine production plan, approximately
Slide 3: Elementos is building momentum in 2024
Elementos is building momentum in 2024 Projects Market For personal use only 1 2 3 4 5 Flagship Oropesa Tin Project Oropesa DFS to be Robledallano Tin Smelter 50% Tin and tungsten drilling has LME tin price smashed through (Spain) on track to be Europe’s completed by end of 2024 option gives clear p
Slide 4: Tomorrow's tin
Tomorrow’s tin Tin developer, with two mines in development and smelter stake For personal use only Elementos Limited (ASX:ELT) owns two world class tin projects with large resource bases and significant exploration potential in mature mining jurisdictions. Oropesa Tin Project Robledallano Smelter C
Slide 5: Driving additional value on top of solid foundations
Driving additional value on-top of solid foundations For personal use only Cleveland Scoping Study / Formalise PFS project scope Cleveland Mineral Resource Drill-out tin/copper, Expansion Drilling tungsten extensions Oropesa Exploration Explore mineralisation extensions and Drilling regional expansi
Slide 6: Tin is the metal most impacted by electrification and new green technologies
Tin is the metal most impacted by electrification and new green technologies. For personal use only Did you know? electric advanced renewable computers energy Others robotics energy & IT storage vehicles • Tin is a key electrical contact in Tin electronic circuits (solder), printed Lithium circuit b
Slide 7: Tin focussed with a critical portfolio
Tin focussed with a critical portfolio Tin, tungsten, zinc, copper, and fluorite are critical and strategic and in demand. The minerals in our portfolio are rated “Critical” or For personal use only “Strategic” by many major economies. • The international competition for critical minerals, including
Slide 8: Tin price in 2024 showing strength
Tin price in 2024 showing strength Tin demand growth returning whilst tin supply remains strained amid supply disruptions In 2024 the tin market looks significantly supply LME & SHFE Cash/Spot Tin Prices (US$/t) For personal use only challenged, which has led to stronger prices. US$40.0k • Despite m
Slide 9: Tin market entering material deficits
Tin market entering material deficits New tin supply >60,000t required by 2030 to meet base case demand Global tin base-case demand is forecast to increase For personal use only Refined Tin Supply, Demand & Defecits ~3%pa to service the technology revolution. 475 15.0 455 10.0 • ~2.8%pa forecast gro
Slide 10: Global tin supply grim after decades of underinvestment
Global tin supply grim after decades of underinvestment Limited security of supply from responsible sources for major technology economies For personal use only Limited Security of Supply for Europe, Aus & USA Current producers struggling to maintain production levels Major mine production by countr
Slide 11: Cleveland Tin Project
Cleveland Tin Project 100%-owned project located in mineral rich north-west Tasmania For personal use only Tin & Copper JORC Resources4 Tin & Copper Tailings JORC Reserve5 4 All resources calculated using a 0.35% Tin cut-off grade. This information was 5 This information was prepared and first first
Slide 12: Cleveland Tin Project drilling update
Cleveland Tin Project Tin, Copper & Tungsten drilling completed, and initial visual results now reported, large batch of assays still to be received & reported Recent Exploration Updates: For personal use only • Near Surface Drilling: • C-2123: 0.45m @ 9.7% Cu, 5.15g/t Au, 18g/t Ag & 1.35% Zn from 1
Slide 13: Cleveland Tin Project operational history
Cleveland Tin Project Tin, Copper and Tungsten Operational history: For personal use only • Operated as an underground tin mine for 27 years in two phases: • 1908 – 1917 (WWI) & 1968-1986 (by Aberfoyle) • Total ore mined: 5.65mt @ 0.68% Sn & 0.28% Cu. • Total metal produced: 23,519t of Sn and 9,691t
Slide 14: Oropesa Tin Project, Spain
Oropesa Tin Project, Spain Poised to be Europe’s first major tin mine For personal use only Greenfield, open-pit tin project in EU • Open-cut tin mining and processing operation producing tin concentrates for smelters in Europe, North America or Asia. • Responsible approach to mining, with strong lo
Slide 15: Smelter integration
Smelter integration Mine-to-metal production within Spain & the EU Elementos has signed an option term-sheet to For personal use only acquire up to 50% interest in Iberian Smelting S.L, the company which owns the Robledallano Tin Smelter, which is licenced and currently operating. • The smelter is l
Slide 16: Robledallano Smelting Facility
Robledallano Smelting Facility For personal use only • Current Ownership: The current smelter is • Audits & Compliance: The smelter is ISO-14001 owned by Iberian Smelting SL. 90% owned by certified and is in the process of being audited CRM Synergies and 10% owned by a private and registered as a Re
Slide 17: Oropesa 2023 Mineral Resource Estimate Update
Oropesa Tin Project, Spain 2023 Mineral Resource Estimate Update9 95% of 2023 MRE is classified either Measured or For personal use only Indicated Resources, totaling 18.5Mt at 0.39% Sn • 69,800m diamond drilling (356 holes) + 1,928m RC (12 holes) • 38% of 2023 MRE is classified as Measured Resource
Slide 18: Maiden Zinc Mineral Resource Estimate
Oropesa Tin Project, Spain Maiden Zinc Mineral Resource Estimate 2023 Oropesa Mineral Resource Estimate for Zinc For personal use only OROPESA 2023 MINERAL RESOURCE ESTIMATE - Zinc (0.05% Zn cut-off) at a 0.05% Zn cut-off (JORC 2012) Resource Classification Zn% Resource Tonnes Contained Zinc Metal (
Slide 19: Further extensions and exploration potential
Further extensions and 2023 exploration drilling intersected exploration potential semi-massive to massive sulphide Drill hole ADD_04 has returned two significant zones of polymetallic (Tin, Zinc and Copper) mineralisation12: Further polymetric mineralisation For personal use only ADD_04:- 19.7m @ 0
Slide 20: Optimisation Study (2022) & Basis of Environmental Submissions
Optimisation Study (2022) & Basis of Environmental Submissions High level layout and production target summary For personal use only Based on JORC Resources (November 2021) Mineral Resource (Nov 2021) Production Target (2022) 18.86Mt 82% conversion 15.50Mt 0.40% Sn [75.4kt Sn] US$30,000/t Pit Shell
Slide 21: Optimisation Study (2022) Summary
Optimisation Study (2022) Summary NPV = A$342m, 2.5yr payback For personal use only Life of mine Tonnage averages Annual ore mined Annual ore sorter feed Annual processing plant feed Annual tin concentrate (62%) Annual tin metal production 1,250,000t 1,250,000t 1,000,000t 5,400t 3,350t Annual waste
Slide 22: Approvals Update – new project layout modifications
Approvals Update – new project layout modifications supported by Andalucian Authorities The company recently announced a clear way-forward with For personal use only Elementos re-forecasts the following key project the Andalucian Administration following negotiations to development dates: modify the
Slide 23: Strong partners delivering DFS
Strong partners delivering DFS The project has partnered with over 50 experienced and qualified local companies For personal use only Study & Project Leads Technical Partnerships Engineering Partners Site & Laboratory Contractors Environmental, Survey and Local Partners University & Corporate Relati
Slide 24: Project materially de-risked
Project materially de-risked DFS to be re-optimised to capture agreed layout changes For personal use only Elementos has confirmed all critical DFS data for the project, with engineering of key elements markedly 01 Mineral Resource defined - 95% Measure & Indicated categories matured, significantly
Slide 25: Private Placement Raises $3.0m to advance tin projects
Private Placement Raises $3.0m to advance tin projects With Entitlement offer open to current ELT Shareholders For personal use only • Elementos received firm commitments to raise A$3.0 million via a Placement (before costs) & entitlement offer commitments • Elementos Chairman Andy Greig has committ
Slide 26: Focussed and experienced leadership
Focussed and experienced leadership For personal use only Our team has extensive experience in the mining and resources sector, including project acquisition, development and construction. Andy Greig Joe David Calvin Treacy Corey Nolan Non-Exec Chairman Managing Director Non-Exec Director Non-Exec D
Slide 27: Corporate overview
Corporate overview For personal use only Share price Market capitalisation Major Shareholder distribution (April 2024) $A0.087c A$18.2m JM FINANCIAL, 6.0% 28 August 2024 28 August 2024 52 week high $0.185, low $0.085 Andy Greig 13.4% GOM PROPERTIES Shares on issue Cash3,4 5.5% 209.6m A$0.5m MCCUSKER
Slide 28: Global Measured & Indicated Mineral Resources by Company
Global Measured & Indicated JORC/N43-101 Mineral Resources by Company1,2 Open-Pit | Underground FirstTin 75.9Mt M+I 115.3kt Contained Tin Legend Size of bubble - contained tin tonnes JSC TinOne 90 69.8Mt M+I (Mt) only 238kt Contained Tin In operation, open pit Not in operation, open pit ELT, in deve
Slide 29: Global Measured & Indicated Mineral Resources datatable
Global Measured & Indicated JORC/N43-101 Mineral Resources by company Datatable Measured Indicated Measured & Indicated Inferred Total Mineral Resource Classification % Resource Contained Contained Contained Contained Resource Resource Measured Indicated / M&Ind / Inferred / Project Tonnes Grade Ton
Slide 30: Disclaimer
Disclaimer For personal use only Forward-looking statements 14 – Maiden Zinc Mineral Resource at Oropesa Tin Project, 29 th Nov 2024 15 – High Grade Copper & Gold intersected at Cleveland Project, 18 th June 2024 This document may contain certain forward-looking statements. Such statements are only
Slide 31: Get in touch
Get in touch Joe David For personal use only Elementos Limited Level 7, 167 Eagle Street Managing Director Brisbane Queensland 4000 +61 (0)7 2111 1110 Phone: +61 7 3212 6299 jd@elementos.com.au elementos.com.au (ASX:ELT)