Turquoise Hill Resources Ltd.

Turquoise Hill Resources — Ivanhoe Mines — Investor Presentation (March 2012)

22 slides from Turquoise Hill Resources's investor presentation, March 2012

  1. Slide 1: Corporate Presentation March 2012

    CORPORATE PRESENTATION MARCH 2012

  2. Slide 2: Forward-looking statements

    Forward-looking statements This presentation includes certain “forward-looking statements.” All statements, other than statements of historical fact, are forward-looking statements that involve various risks and uncertainties. There can be no assurances that such statements will prove accurate and a

  3. Slide 3: Oyu Tolgoi copper-gold-silver mining complex

    Oyu Tolgoi copper-gold-silver mining complex LLC 66% owned by Ivanhoe Mines Ivanhoe’s OYU TOLGOI discovery to rank among the copper world’s Big Three mines Annual output in each of Oyu Tolgoi’s first 10 years projected to average:  1.2 billion pounds (544,000 tonnes) of copper;  650,000 ounces of

  4. Slide 4: The Promise & Power of Oyu Tolgoi

    The Promise & Power of Oyu Tolgoi “Compared to the largest copper producing mines in the world…Oyu Tolgoi has the third-largest copper mineral resource and one of the lowest C1 life-of-mine cash costs, due to its large precious metals by-product credits.” “We expect Oyu Tolgoi to become the second-l

  5. Slide 5: Oyu Tolgoi just 80 km from China border

    Oyu Tolgoi just 80 km (50 miles) from China border When Ivanhoe’s geologists first looked out over Oyu Tolgoi 11 years ago, they could see… An outcropping of weathered copper mineralization (inspiring the name Turquoise Hill, or Oyu Tolgoi), which Bronze Age artisans collected for use in tools and w

  6. Slide 6: Hole 150 first major discovery at Oyu Tolgoi

    10 years ago, after a shallow-drilling program, the first deep hole produced Ivanhoe’s first major discovery at Oyu Tolgoi Hole 150 hit more than 500 metres of high-grade gold and copper mineralization. July 17, 2001: Ivanhoe Mines announced that the new zone contained “potentially significant porph

  7. Slide 7: Now, in 2012, we're counting down to start-up

    130,000 man-hours/day at 2011 peak Workforce of up to 15,000, including 9,000 Mongolians. February 2012 October 2010 Concentrator From foundations to 80% completion in 16 months Now, in 2012, we’re counting down to start-up Overall construction topped 73% completion at the end of February 2012. Init

  8. Slide 8: The planned mines at Oyu Tolgoi

    The planned mines at Oyu Tolgoi The Big Dig Blasting and excavation of open pit for phase-1 mining

  9. Slide 9: Primary ore crusher and overland conveyor

    Equipment installation at primary ore crusher, beside the open-pit mine Overland conveyor tranfers ore from primary crusher to coarse-ore stockpile

  10. Slide 10: Coarse-ore storage stockpile

    Conveyor feeds coarse-ore storage stockpile Scale of coarse-ore storage dwarfs workers

  11. Slide 11: Concentrator and pebble crusher

    View of concentrator and pebble crusher from roof of coarse-ore storage Two-line processing in concentrator • 100,000 tonnes ore per day (phase 1) • 160,000 tonnes ore per day ( phase 2) SAG mills Ball mills Flotation cells

  12. Slide 12: Ball-mill motor drive and SAG mill stators

    Ball-mill motor drive installation Stators that drive SAG grinding mills; each mill contains 66.4 tons of copper

  13. Slide 13: Installing stator on SAG mill

    Installing stator on SAG mill; each mill made with 66.4 tons of copper Bank of flotation cells in concentrator

  14. Slide 14: Concentrate storage and power station

    Concentrate storage building at end of production line Diesel-fuelled power station & electricity distribution system 220kV transmission towers at central substation

  15. Slide 15: 220kV power line and Shaft #2

    95 km of 220kV towers completed to Mongolia-China border 87-kilometre line underway in China. Electrical power to be supplied from China for first four years. Subject to final approvals, Chinese power is expected at Oyu Tolgoi in Q3 2012. Dedicated coal-fired power plant will be built in Mongolia fo

  16. Slide 16: 1,300 metres under the Gobi Desert

    1,300 metres under the Gobi Desert 10 km of access to Hugo underground built – 28 km to go to 2016 production

  17. Slide 17: Infrastructure for a world-scale mine

    Infrastructure for a world-scale mine New regional airport 100-passenger terminal Concrete runway to handle Boeing 737-sized aircraft. Control tower and hangar for passenger aircraft. Paved105-kilometre highway being built to Mongolia-China border Rock crusher conveyor installation for road construc

  18. Slide 18: Historic Mongolia-China summit pact

    Historic Mongolia-China summit pact covered resources & power supply Strategic partnership signed by Mongolian PM Batbold (left) and Chinese Premier Wen in 2011 signalled new era of “deepened” co-operation on:  development of mineral and energy projects;  building of connecting railways and highwa

  19. Slide 19: Expanding Oyu Tolgoi

    Main construction camp, Oyu Tolgoi Expanding Oyu Tolgoi Ongoing exploration extends mineralized system to over 26 km (16.2 miles)

  20. Slide 20: Creating value in subsidiaries

    Creating value in subsidiaries Ivanhoe net asset value summary Beneficial Discount After tax NAV NAV per Project interest rate (US$ million) share Oyu Tolgoi Oyu Tolgoi 66% 10% $13,292 $17.72 SouthGobi Resources Ovoot Tolgoi 58% 9% $1,123 $1.50 Ivanhoe Australia Merlin/Osborne 59% 9% $920 $1.23 Alty

  21. Slide 21: Ivanhoe in Asia Pacific

    Ivanhoe’s entire 66% stake in Oyu Tolgoi could supply 51% of Rio copper output by 2020 Source: Bank of America Merrill Lynch, February 2012 . Ivanhoe in Asia Pacific

  22. Slide 22: Thank you

    Thank you om i EX Beeg MORIZONS SouthGobi Resources

Ivanhoe Mines — Investor Presentation (March 2012) on 6ix