Melbana Energy Limited · ASX:MAY

Melbana Energy — Shareholder Meeting (November 2024)

33 slides from Melbana Energy's shareholder meeting presentation, Nov 19, 2024

  1. Slide 1: 2024 AGM Chairman's address and the Company's presentation

    19 November 2024 ASX Announcement (ASX: MAY) 2024 AGM Chairman’s address and the Company’s presentation In accordance with ASX Listing rule 3.13.3, Melbana Energy Limited (MAY) attaches the Chairman’s address and the Company’s presentation to be delivered at the Annual General Meeting (AGM) today in

  2. Slide 2: Chairman's address - Andrew Purcell

    Chairman’s address - Andrew Purcell Ladies and Gentlemen, good morning and welcome the Annual General Meeting of Melbana Energy Limited. My name is Andrew Purcell and I am the Executive Chairman and the Chairman of today's Meeting. There are a number of items on the Agenda for this year’s AGM, which

  3. Slide 3: Chairman's address (continued)

    Significantly, Melbana was one of only a handful of companies to be offered new acreage for the first time in several years. Finally, I commend our team for their excellent technical work and diligent efforts towards the realisation of our goals. It has been a challenging year, but a significant rew

  4. Slide 4: Melbana Energy Limited Annual General Meeting

    Melbana Energy Limited ASX Code : MAY Annual General Meeting Tuesday, 19 November 2024 10:30am (AEDT)

  5. Slide 5: Disclaimer

    Disclaimer Summary of information: This presentation contains general and background information about Melbana will form the basis of any contract or commitment. This presentation is not a prospectus. Offers of securities in Energy’s activities current as at the date of the presentation and should n

  6. Slide 6: Company's Presentation

    Company’s Presentation 1. Corporate, finances & the year in review 2. Operations update ‣ Cuba ‣ Australia 3. HSE & community activities 4. Summary 7

  7. Slide 7: Corporate

    é Melbana Energy Corporate

  8. Slide 8: Corporate snapshot: an experienced team with a proven track record

    Corporate snapshot: an experienced team with a proven track record As of 30 September 2024 Company Information Andrew Purcell Michael Sandy Peter Stickland Uno Makotsvana Chris McKeown Executive Chairman Non-Executive Director Technical Director CFO & Co Secretary CCO Objective Melbana Energy Limite

  9. Slide 9: FY2024 progress since previous period

    FY2024 progress since previous period Cuba ‣ Alameda-2 Amistad Unit 1B reservoir well test produced at sustained rate of 1,235 bopd prior to shut-in, post shut-in flow rate reduced to 300 bopd. ‣ Alameda-3 drilled; studies post well-test nearing completion; results suggest near well bore damage prev

  10. Slide 10: More to come

    More to come Next six months ‣ Transition from explorer to producer. ‣ Close of non-dilutive financing facility for Block 9. ‣ Alameda-2 workover complete and left online as first producing well. ‣ Oil transport and storage options finalised and first oil export achieved. ‣ Additional development we

  11. Slide 11: Government approval received to update Block holding structure

    Government approval received to update Block 9 holding structure Oil trading and funding ‣ 100% Melbana owned, Spanish subsidiary: MAY ENERGIA ESPAÑA SL (Melbana Spain). ‣ Structure aids fundability of Block 9 development. ‣ Subsidiary will market and sell Block 9 oil production. ‣ Melbana Spain par

  12. Slide 12: Operations

    é Melbana Energy Operations

  13. Slide 13: Our projects

    Our projects Australia ‣ WA-544-P & NT/P87 Cuba ‣ AC/P70 ‣ WA-552-P ‣ WA-488-P (contingent cash/royalty interest) Cuba ‣ Block 9 14

  14. Slide 14: FY2024 report card: appraisal drilling

    FY2024 report card: appraisal drilling Maiden Contingent Resource of 46mmbbl achieved and 38% increase in Amistad Prospective Resources Results Production Resources ALAMEDA-2 • Reached TD • Unit 1B • Unit 1B1,2 • No complications • Peak flow of 1900 bbl/d • Contingent Resource 46 mmbbl3 • 19° API re

  15. Slide 15: Resources Update

    Maiden Contingent Resource and updated Prospective Resource for Unit 1B and Unit 1A reservoirs Resources Update Unit 1B in the eastern part of the Alameda structure ‣ Contingent Resource (Development Pending) . Unit 1B in the western part of the PSC ‣ Prospective Resource (Chance of Discovery of 70%

  16. Slide 16: Review of Alameda-3

    Review of Alameda-3 WHAT HAPPENED? ‣ Side track required 2908mMD due to hole stability issues. ‣ Tool stuck in hole caused delays, reached total depth. ‣ High quality logs and cores acquired in both reservoirs. ‣ Well logs showed good permeability and flow potential. ‣ Alameda and Marti reservoirs t

  17. Slide 17: Probable cause of unsuccessful wells tests in Alameda-3

    Probable cause of unsuccessful wells tests in Alameda-3 Possible causes ‣ Small Compartment Unlikely doesn’t support majority of findings (e.g. logs and FMI), would need to be extremely small compartment ‣ Oil Properties / bitumen blockage Unlikely can explain only some observations ‣ Reservoir perm

  18. Slide 18: Ongoing and future studies

    Ongoing and future studies ‣ Fluid-rock & fluid / fluid combability tests performed. ‣“Varadero-blend” of solvent and acid defined. ‣ Acid solubility tests of Unit-1B core samples completed. ‣ Routine Core Analyses (RCA) completed for Alameda-2 samples. ‣ Alameda-3 petrophysical properties similar t

  19. Slide 19: Field Development

    é Melbana Energy Field Development

  20. Slide 20: FY2024 Report card: field development preparations

    FY2024 Report card: field development preparations • Storage tank allocated to Melbana • Permission to export 100% of oil • Offtake/financing progressing • Fast oil shipping options explored • Joint oil marketing agreed • Partnered with Sonangol (70%) • Permitting for drill pads on track • Melbana S

  21. Slide 21: Next two wells to be focused on maximising Unit-1B intersection

    Next two wells to be focused on maximising Unit-1B intersection ‣ Amistad-2 is immediately up-dip from Alameda-2 (Amistad-1) 22

  22. Slide 22: Amistad Unit-1B field development program

    Amistad Unit-1B field development program SHORT TERM PRODUCTION PROGRAM ‣ Recommence production from Unit 1B. ‣ Export of first oil to test logistics, storage and commercial arrangements. ‣ Progressively construct offset well pads. ‣ Starting drilling new Unit 1B production wells. GOALS OF PHASED DE

  23. Slide 23: Alameda-2 workover

    Alameda-2 workover ‣ Key steps: ‣ Pull completion. ‣ Add and re-perforate. ‣ Perform solvent-acid pre-wash. ‣ Perform 15% HCl acid squeeze/soak. ‣ Re-complete. ‣ Clean-up and commence production. ‣ Chemicals and equipment procured and on way. 24

  24. Slide 24: Crude oil trucking

    Crude oil trucking ‣ Finalising agreement to truck crude. ‣ Turnkey trucking service. ‣ Trucks, Tankers, safety equipment, certified drivers, maintenance and operations management included. ‣ 5 trucks and tankers now in country. ‣ Minor modifications to tankers in progress. 25

  25. Slide 25: Fast first shipment investigations

    Fast first shipment investigations ‣ Melbana investigating “Fast First Shipment” solution. ‣ One concept includes following: ‣ Truck Block 9 oil to Cardenas Bay. ‣ Unload trucks at: ‣ Varadero Battery, or ‣ Barge loading location in Cardenas Bay (TBC). ‣ Barge oil from Cardenas Bay: ‣ To Matanzas Ba

  26. Slide 26: 3D seismic planning

    3D seismic planning ‣ Optimal placement of future development wells will benefit from improved 3D seismic data. ‣ Render process requires a visit of survey area by multiple tenderers to ensure accurate pricing. ‣ Upcoming scout survey trip to define mangrove areas, forestry, cropping, populated area

  27. Slide 27: Our Australian projects

    6 Melbana Eneray Our Australian projects

  28. Slide 28: Australia optionality

    Australia optionality WA-488-P WA-544-P & NT/P87 AC/P70 Beehive Prospect Hudson opportunity ‣ Up to ‣ Melbana retains 100% of 1.4 billion barrels adjacent Beehive- lookalike (Hudson of oil prospect* Prospect) with up to to be drilled in 2024/2025 ** 1.2 billion barrels ‣ Melbana retains contingent r

  29. Slide 29: Health Safety Environment & Community

    Health Safety Environment & Community 30

  30. Slide 30: Community connections and local support

    Melbana community connections long lived Knowledge and local support Supply of goods ‣ Topographic surveys of roads for ‣ Focus on local hiring, goods and maps for municipality. services, e.g., installation of ‣ Investment in natural channels / fences, control of bee populations and supply of food f

  31. Slide 31: Alameda-2 HSE summary

    Alameda-2 HSE summary ‣ No LTI. ‣ 1 environmental recordable Item Unit Weekly Total Item Unit Weekly Total Safety Induction No. Person 9 61 Man hours (Melbana) Hrs 2,856 17,700 incident (oil spillage <20 Job Safety Analysis (JSA) No. 16 132 Man hours (Sherritt) Hrs 4,728 31,692 litres). ‣ Timely dis

  32. Slide 32: Summary

    Summary ‣Melbana is making the transition from explorer to producer. ‣Alameda-2 proved project in the Upper reservoir. ‣Workover to increase production rates imminent. ‣Offtake/financing discussions progressing. ‣Field development plan complete: More production wells to be drilled in 2025. ‣Explorat

  33. Slide 33: Meeting Closure

    Meeting Closure Thank you for your attendance. Melbana Energy Limited ABN 43 066 447 952 Mezzanine Floor, 388 George Street Sydney NSW 2000 AUSTRALIA Contact Telephone: +61 (2) 8323 6600 Email: admin@melbana.com