Silver Spruce Resources Inc. · TSXV:SSE
Silver Spruce Resources — Shareholder Meeting (April 2013)
24 slides from Silver Spruce Resources's shareholder meeting presentation, Apr 2, 2013
Slide 1: Annual General Meeting, Dartmouth, N.S., April 2, 2013
EXPERIENCE • VISION • VALUE ANNUAL GENERAL MEETING Dartmouth, N.S. APRIL 2, 2013 TSXV: SSE
Slide 2: Safe Harbour Statement
Safe Harbour Statement TSXV: SSE Investors are cautioned that, except for statements of historical fact, certain information contained in this document includes "forward-looking information” with respect to a performance expectation for SSE. Such forward-looking statements are based on current expec
Slide 3: Big Easy – Location
Big Easy – Location TSXV: SSE Island of Newfoundland - East Coast 2 hrs. from St. John’s / 20 minutes from Clarenville 5 km off Trans Canada Highway – Road accessible Power line passes through property QUEBEC Deer Deer Lake Lake Corner Corner TTC CHH Brook Brook Gander Gander Gra
Slide 4: Big Easy Prospect – Regional Model
Big Easy Prospect – Regional Model Northern extension of the 275 km Burin Peninsula high sulphidation belt BE Mineralization hosted in silicified sedimentary units near faults Growing Recognition as a Significant District Silver Spruce’s exploration and drilling work by NL Geological Survey
Slide 5: Big Easy – Gold Silver Prospect
Big Easy – Gold Silver Prospect Big System - pervasive alteration / mineralization 294 Claims - subject to 3% NSR (buyback of 1.5%) Classic epithermal style gold / silver prospect Core area -1.7 km strike x 300-500m wide Potential strike length of 5 km plus BE Sinter ET zone
Slide 6: Big Easy – Looking North
Big Easy – Looking North TSXV: SSE Trans Canada Hwy Power Line Grassy Pond 2012 Drilling Trench #6
Slide 7: Epithermal Model
Epithermal Model Big Easy Drilling (to date) 7
Slide 8: Big Easy – Exploration History
Big Easy – Exploration History 2010 Program Geology / Prospecting Trenching – 6 trenches Geophysics - IP 2011 - Phase I Drilling Program 7 holes / 1577m 1.2 km strike length Phase II Drilling – 2012 5 holes / 1080m 200 m strike length
Slide 9: Drill hole plan map with intercepts
BE-11.07 © © ° 208m N 1369 Au829T Ag 6m 19 Aub 64/7 Aa 24m ind T8QTALAIOQTAQ/IM nc DogT AUS SST AGIOS 348500 0.21 gIT Au & 8.207 Ag /6.3e ‘Incl, 0.14 gIT Au 8 96 g/T Ag! tm BE-11-.06 © © 7 360m North Bottle Pond South Bottle Pond Grassy Pond 13446M 5348000 17 9TAu8335 97 Ag/25m 16633M TE a nd, 4497
Slide 10: Big Easy – 2011 Drilling
Big Easy – 2011 Drilling 7 DDH - 1577m, 1.2 km strike length, max 365m / 276m TVD Test alteration, IP, surface geology / rock samples Best intersections deep – brecciated veins / silicified pyritic breccia 6 g/t Au / 174 g/t Ag over 1.5m 2.5 g/t Au / 74 g/t Ag over 7m 0.87 g/t Au / 33 g/
Slide 11: Big Easy – 2012 Drilling
Big Easy – 2012 Drilling 5 DDH - 1080m, 200m strike length, max - 230m / 199m TVD Test zone in area of best 2011 DD intersection in BE-11-3 Test structural input on vein orientation – drill west Structural and mineralogical information Abundant narrow quartz adularia (QA ) veins BE-12-9
Slide 12: Big Easy – DD Highlights
Big Easy – DD Highlights TSXV: SSE Hole # (TV Depth) Length m Au g/t Ag g/t BE 11-3 (231 m) 30.5 0.87 33 BE-11-3 incl 7.0 2.5 74 incl 1.5 6.1 174 incl 1.0 6.0 114 BE 11-5 (176 m) 6.5 0.16 32.2 incl 1.5 0.46 49 BE 11-7 (247 m) 6.0 1.4 2 incl 1.0 7.6 10 BE-12-9 BE 12-9 (199 m) 2.3 0.42 49.8 incl 0.25
Slide 13: Big Easy – Drilling Highlights
Big Easy – Drilling Highlights TSXV: SSE BE-12-11 Hole # (TV Depth) Length m Au g/t Ag g/t BE-12-10 (209m) 4.6 0.62 18.4 incl 0.2 2.11 191 incl 0.3 4.1 90 and 11.3 0.8 3.8 BE-12-11 (177m) 2.5 1.7 33.5 incl 0.4 4.39 69 BE-12-12 (202m) 8.7 1.3 36.7 BE-12-12 incl 2.2 4.6 101 incl 1.2 7.9 130 Notes: BE-
Slide 14: Holes Plotted
HOLES PLOTTED u w rm 8 S BE-12-9 S BE-12-10 TOTAL 2 - BE-12-10 BE-12-9 SARGRAPHS LR COL RANGE - 100 RL 100RL Silica Alteration Full 2 ; ‘Au (ppb) R Min 100 Mate Dye siltstone oRU ORL Conglomerate MM rat SECTION SPECS: REF. PT. E,N 709920 m 6347810 m EXTENTS 266.2m (260m SECTION TOP, BOT 136m 124m TO
Slide 15: Big Easy Model
Big Easy Model Trench 6 Big Easy Drilling Level 7 Adapted from Standard Epithermal Model
Slide 16: Colloform banded vein with blades (boiling textures)
Colloform banded vein w/ blades (boiling textures) BE-12-10 - 25.85 - 3.4 g/T Au, 68 g/T Ag 5 mm
Slide 17: Bladed textures (Boiling) in quartz-adularia bands
BE-12-10 - 25.85 - 3.4 g/T Au, 68 g/T Ag Bladed textures (Boiling) in quartz-adularia bands (also location of next two slides)
Slide 18: Electrum (Au), Ag, Ag-S-Se
BE-12-10 - 25.85 - 3.4 g/T Au, 68 g/T Ag V. pure native Ag; Au rich electrum Electrum (Au) Ag Ag-S-Se py
Slide 19: Acanthite, Ag mineralogy
BE-12-10 - 25.85 - 3.4 g/T Au, 68 g/T Ag V. pure native Ag; acanthite; Se peaks - mixed phase ? acn acn(Cu) Ag
Slide 20: DDH BE-11-3 pyrite grain breccia fragment
DDH BE-11-3; 242.13-242.24m Pyrite grain breccia fragment veined / mineralized from below ???
Slide 21: Pyrite, Ag, electrum, acanthite in BE-11-3
DDH BE-11-3 - 242.13-242.24m py Pyrite grain breccia fragment veined / mineralized from below ??? Ag electrum(Au) acn py py electrum
Slide 22: Big Easy Zone – look S
<1800 Lago» algo “LATO oy Sted Tinisca % Ponds ET zone SILVER SPRUCE
Slide 23: Big Easy – 2012 / 2013
Big Easy – 2012 / 2013 2012: Airborne Survey - High Resolution Magnetic / VLF-EM 3D Compilation - Caracle Creek Int. Consulting Mineralogical Studies - Research partnership – MUN / GSNL Proposed 2013: Deep Penetration Ground Geophysics - $300,000 IP / MT Survey – Titan 24 Phase 3 drill p
Slide 24: Thanks to: Memorial University of NL, RDC NL
Thanks to: Memorial University of NL, RDC NL, Dr. Graham Layne, Matthew Clarke TSXV: SSE www.silverspruceresources.com
Silver Spruce Resources — Shareholder Meeting (April 2013) on 6ix