  1. Slide 1: Lake Erie Works Community Liaison Committee Meeting Q3 2020

    Lake Erie Works Community Liaison Committee Meeting Q3 2020 4 November 2020

  2. Slide 2: Agenda

    Agenda 1. Introductions 2. General Update 3. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 4. Road Dust Management Update 5. Pig Iron Caster Project Update 6. Community Feedback 7. Proposed 2021 Meeting Dates 8. Adjournment

  3. Slide 3: Site-Specific Standard Order (Particulates): Performance Review – Daily

    Site-Specific Standard Order (Particulates): Performance Review – Daily During Rehabilitation Project (Jul – Sept 2020) Doors Lids Off-takes Date (% Leaks) (% Leaks) (% Leaks) 2015 Thresholds 54% 2% NA (July 2 start) 2016 Thresholds 32% 2% NA 2017-2019 Thresholds 10% 2% 5% 2020 Thresholds 5% 1% 4% J

  4. Slide 4: Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages

    Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages During Rehabilitation Project (Jul – Sept 2020) Charging Doors Lids Off-takes Date (sec) (% Leaks) (% Leaks) (% Leaks) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 20

  5. Slide 5: Site-Specific Standard Order (Particulates): Performance Review – Daily Observations

    Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – During Rehabilitation Project (Jul - Sept 2020) Pushing Emission Date (opacity %) 2015 Threshold ≥ 50% (July 2 start) 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% Jul 1 – Sept 30, 2020 0 – 70.00% Range (6.53%) (Average

  6. Slide 6: Site-Specific Standard Order (Particulates): Performance Review – Additional Items

    Site-Specific Standard Order (Particulates): Performance Review – Additional Items • There were no community complaints for the period of Q3 2020 related to the Site-Specific Standard • MECP to provide verbal comments

  7. Slide 7: Dust Management: In-Plant Roads

    Dust Management: In-Plant Roads In early 2020 Stelco purchased a Tymco Regenerative Sweeper Truck for year-round road dust control. The vacuum action of this unit requires no water, allowing for use in freezing temperatures that traditional sweepers cannot operate in.

  8. Slide 8: Pig Iron Caster

    Pig Iron Caster • Construction nearly complete on a new pig casting facility, which is anticipated to be operational by the end of 2020 • Broadens Stelco’s product mix and operational flexibility by allowing us to compete in the value-added pig iron market • Facility will be capable of producing ove

  9. Slide 9: Slide 9

  10. Slide 10: Source: https://www.economyindustrial.com/

    Source: https://www.economyindustrial.com/

  11. Slide 11: Community Feedback

    Community Feedback STELCO } +

  12. Slide 12: Proposed 2021 Meeting Dates

    Proposed 2021 Meeting Dates • Wed. Jan. 27, 2021 • Wed. Apr. 28, 2021 • Wed. July 28, 2021 • Wed. Oct. 27, 2021

  13. Slide 13: Thank You.

    | STELCO | 9 The Steel Company of Canada Thank You. stelco.com