Galp Energia, Sgps S.a. Class B · EURONEXT:GALP

Galp Energia, Sgps S.a. Class B — Galp Energia — Investor Day (October 2007)

90 slides from Galp Energia, Sgps S.a. Class B's investor day presentation, Oct 22, 2007

  1. Slide 1: Investor Day

    INVESTOR DAY Lisbon, 22 October 2007

  2. Slide 2: Disclaimer

    DISCLAIMER Matters discussed in this presentation may constitute forward-looking statements. Forward-looking statements are statements other than in respect of historical facts. The words “believe,” “expect,” “anticipate,” “intends,” “estimate,” “will,” “may,” "continue," “should” and similar expres

  3. Slide 3: Strategy Overview

    STRATEGY OVERVIEW Lisbon, 22 October 2007 Manuel Ferreira De Oliveira, CEO

  4. Slide 4: A Focused Management Team

    A FOCUSED MANAGEMENT TEAM Chief Executive Officer Manuel Ferreira De Oliveira Head of Refining, Head of Power Head of E&P and Head of Oil Marketing CFO Head of Natural Gas Supply and Logistics André Freire de International Oil João Pedro Francesco Massimo José António Almeida Palmeiro Fernando Manue

  5. Slide 5: A Total Return of 102% in One Year

    A TOTAL RETURN OF 102% IN ONE YEAR +97% +21% +10% 23-Oct 23-Nov 23-Dec 23-Jan 23-Feb 23-Mar 23-Apr 23-May 23-Jun 23-Jul 23-Aug 23-Sep Galp Energia PSI20 Index DJ Euro Stoxx Oil & Gas Source: Bloomberg 5 Investor Day

  6. Slide 6: Proven Track Record on Implementation

    PROVEN TRACK RECORD ON IMPLEMENTATION Conversion Project 9 Oporto Cogeneration Facility 9 Oporto Cogeneration Facility 9 Wind Farms 9 Wind Farms 9 CCGT 2 9 CCGT 2 9 Strategic plan CCGT 1 9 CCGT 1 9 CCGT 1 9 under execution 9 9 9 9 Sines Sines Sines Sines Cogeneration Cogeneration Cogeneration Cogene

  7. Slide 7: Growing with a More Balanced Portfolio

    GROWING WITH A MORE BALANCED PORTFOLIO R&M Target 50% G&P 25% E&P 25% 1H2007 G&P 26% R&M 57% E&P 17% 481 M€ 2006 G&P 33% R&M E&P 59% 8% 958 M€ 2005 G&P EBITDA 32% R&M adjusted 63% E&P Breakdown 5% 877 M€ 7 Investor Day

  8. Slide 8: Towards a More Integrated Oil Business

    TOWARDS A MORE INTEGRATED OIL BUSINESS E&P 150 Kbbl/d Building an E&P Portfolio Improving refining Refining 300 Kbbl/d competitiveness Marketing 300 Kbbl/d Distributing refining throughput To be achieved 8 Investor Day

  9. Slide 9: Towards a More Integrated Gas & Power Portfolio

    TOWARDS A MORE INTEGRATED GAS & POWER PORTFOLIO New businesses New sources New sourcing Gas to contracts Power Midstream Trading Supply Spain Trading Sourcing Sourcing Supply contracts Supply contracts Portugal Portugal Current Target 9 Investor Day

  10. Slide 10: Carefully Managing the Environmental Risk

    CAREFULLY MANAGING THE ENVIRONMENTAL RISK Galp CO2 emissions balance (Mton) • Licenses for 2008-2012 period on PNALE’s1 EU approval • Expected reduction in CO2 3.4 0.2 emissions in line with estimated PNALE reduction 3.3 • New projects consider CO2 cost • Actively developing clean energy projects Bi

  11. Slide 11: Biofuels Is a Natural Core Business to Galp

    BIOFUELS IS A NATURAL CORE BUSINESS TO GALP Oil value Mineral oil Logistics Refining Logistics Distribution production chain Biofuels Vegetableoil Vegetable oil value production production Logistics Biorefining Logistics Distribution chain No additional Focus on Biodiesel II much investment Negotiat

  12. Slide 12: Strategic Presence in African Downstream

    STRATEGIC PRESENCE IN AFRICAN DOWNSTREAM Galp presence in Africa • GDP growth of 15% in Angola in 2006 (35%-2007E) • Positive EBITDA contribution (10M€) Cape Verde • Leverage on Galp’s access to oil & gas upstream and biodiesel feedstock Guinea-Bissau Angola An option to grow Mozambique 12 Investor

  13. Slide 13: To Become an Integrated Energy Company

    TO BECOME AN INTEGRATED ENERGY COMPANY The right assets Integrated Sustained The right expansion value strengths focusing on creation return The right opportunities 13 Investor Day

  14. Slide 14: Exploration & Production

    EXPLORATION & PRODUCTION Lisbon, 22 October 2007 Fernando Gomes

  15. Slide 15: Long Term Peak Oil Production Expected at 80 Kbbl/d

    LONG TERM PEAK OIL PRODUCTION ON CURRENT PORTFOLIO EXPECTED AT 80 KBBL/D • 4 blocks offshore Working production evolution 34.0 Angola 2X • 10 blocks offshore • 3 areas onshore1 Brazil 17.0 12.4 9.5 • 7 blocks offshore 5.1 5.0 6.2 Portugal 3.5 1.9 1.8 • 5 blocks offshore 2004 2005 2006 2007E 2012E To

  16. Slide 16: Gaining Scale in E&P with Limited Risk Profile

    GAINING SCALE IN E&P WITH LIMITED RISK PROFILE Working Production Rationale Strengths target (Kbbl/d) • Building an E&P • Flag carrier, with portfolio strong ties with Portuguese speaking 150 • Attractive 14% IRR countries assuming 35 Usd/bbl • Ability to exploit • Balancing political geopolitical a

  17. Slide 17: Evaluating New Opportunities to Support Further Growth

    EVALUATING NEW OPPORTUNITIES TO SUPPORT FURTHER GROWTH • 9th round: 312 blocks being auctioned, onshore and offshore • Galp already present in some of the basins Brazil • Partnership with Petrobras • MoU signed with PDVSA to study the development of several projects (short, medium and long term) Ven

  18. Slide 18: Contingent Resources' Evolution Confirms Quality of Angola Assets

    CONTINGENT RESOURCES’ EVOLUTION CONFIRMS QUALITY OF EXPLORATION ASSETS IN ANGOLA (BLOCKS 14, 14K AND 32) Million bbl June 30, 2006 Dec 31, 2006 Reference crude price (Usd/bbl) 62.5 65.0 Proved (P1)2 35.6 35.7 +0% Net entitlement1 Proved + Probable (P2)2 41.4 50.4 +22% Working Contingent Resources3 4

  19. Slide 19: Block 14 – Significant Discoveries in 2007

    BLOCK 14 – SIGNIFICANT DISCOVERIES IN 2007 Key highlights Location • 11 commercial discoveries • 2 recent discoveries: Lucapa-1 and Malange-1 • More than 50 prospects identified • 16 exploration and 16 appraisal wells drilled • Exploration period expired on February 2007 Next steps • Appraisal wells

  20. Slide 20: Block 32 – Favourable Prospects

    BLOCK 32 – FAVOURABLE PROSPECTS Key highlights Location • 12 commercial discoveries • Two 3D seismic acquisitions covering whole block • More than 20 prospects identified • 16 exploration wells drilled • 2 appraisal wells drilled Next steps • Full screening of potential development plans • Appraisal

  21. Slide 21: BM-S-11 – Key Asset

    BM-S-11 – KEY ASSET Key highlights Location • Tupi discovery • Opening of a new hydrocarbon play • Hydrocarbons in place: 1.7 to 10 billion boe • Tupi Sul appraisal well proved the southern extension of Tupi discovery, located 9.5 km away • Iara Area in 3rd Exploration Phase Next steps Area: 2,600 k

  22. Slide 22: Appendix

    APPENDIX ©E savverersia

  23. Slide 23: Understanding a Production Sharing Agreement

    UNDERSTANDING A PRODUCTION SHARING AGREEMENT Working Production Total Production Fraction of Shared production between the that is contractor and allocated to Cost Oil Profit Oil the recovering Concessionaire the at the terms contractor's Equity agreed in the costs, Production contract. between Vari

  24. Slide 24: Working Production to Double on Block 14

    WORKING PRODUCTION TO DOUBLE ON BLOCK 14 Working Production 34.0 • Tômbua - Lândana production from CPT to start in 2010 2X • Increase weight of light oil in working production 17.0 12.4 • Natural production decline of Kuito 9.5 field 5.1 5.0 6.2 3.5 • Increase of BBLT contribution in 1.9 1.8 produc

  25. Slide 25: Block 14 – Strong Growth in Production Expected

    BLOCK 14 – STRONG GROWTH IN PRODUCTION EXPECTED Key highlights Location • Producing fields: Kuito, BBLT, TL • Kuito works for development definition after FPSO contract finished • Optimization works to lift BBLT production above nominal capacity Next steps • Pursue TL EPCI1 • Pursue Negage pre-devel

  26. Slide 26: Block 14K – Pre-Development Studies Under Way

    BLOCK 14K – PRE-DEVELOPMENT STUDIES UNDER WAY Key highlights Location • 2 commercial discoveries • 3 prospects identified • 3 exploration wells drilled • 1 appraisal well drilled in 2007 • Date of Lianzi Commercial Discovery effective since May 2006 Next steps • Pursue Pre-Development Studies Area:

  27. Slide 27: Block 33 – New Operator to Be Appointed

    BLOCK 33 – NEW OPERATOR TO BE APPOINTED Key highlights Location • 3D seismic survey covering whole block • 1 discovery • 5 exploration wells drilled • Calulú Provisional Development Area approved by concessionaire • Initial Exploration Phase expired on May 2005 Next steps • Waiting for concessionair

  28. Slide 28: Santos Basin – Drilling Campaign Just Starting

    SANTOS BASIN (BLOCKS 8, 21, 24) – DRILLING CAMPAIGN JUST STARTING Key highlights Location • 3 blocks: BM-S-8, BM-S-21 and BM-S-24 • 3D seismic survey completed • More than 10 prospects identified • 2 exploration wells being drilled Next steps • Geologic & Geochemical studies under way • Exploration

  29. Slide 29: Espírito Santo – Positive Signs from Seismic Survey

    ESPÍRITO SANTO – POSITIVE SIGNS FROM SEISMIC SURVEY Key highlights Location • Galp operator in 5 blocks • 3D seismic surveys covering all blocks completed • More than 20 leads identified • 8 mature prospects ready to be drilled Next steps • Finish seismic and geological evaluation Area: 378 km2 • 5

  30. Slide 30: Portiguar Basin – Oil Discoveries Under Evaluation

    PORTIGUAR BASIN – OIL DISCOVERIES UNDER EVALUATION Key highlights Location • Galp operator in 20 blocks • 2D and 3D seismic surveys completed • More than 30 Leads identified • More than 12 Prospects identified • 10 operated exploration wells drilled in 2007 • 3 oil discoveries Next steps • Finish se

  31. Slide 31: Sergipe/Alagoas – Exploration Works in an Early Phase

    SERGIPE/ ALAGOAS – EXPLORATION WORKS IN AN EARLY PHASE Key highlights Location • 2D and 3D seismic surveys completed • 5 leads identified • 2 prospects identified • 1 exploration well planned Next steps • Finish seismic and geological evaluation • Drill 3 exploration wells • Identify more leads and

  32. Slide 32: Espírito Santo Offshore – Exploration Work Just Beginning

    ESPÍRITO SANTO OFFSHORE – EXPLORATION WORK JUST BEGINNING Key highlights Location • 3D seismic survey • 3 leads identified • 3D Seismic reprocessing on-going Next steps • Finish seismic and geological studies • Identify more leads and prospects • 1 exploration well to be drilled up to 2010 Area: 722

  33. Slide 33: Potiguar Offshore – First Exploration Well in 2012

    POTIGUAR OFFSHORE – FIRST EXPLORATION WELL IN 2012 Key highlights Location • 3D seismic survey • More than 10 leads identified • 3D seismic reprocessing on-going Next steps • Finish seismic and geological studies • Identify more leads and prospects • BM-POT-16/BM-POT-17: 1 exploration well each, to

  34. Slide 34: Peniche – New Frontier Area

    PENICHE – NEW FRONTIER AREA Key highlights Location • Concession contract signed on May 2007 • Exploration Period: 8 years • Whole area being new frontier • More than 10 leads identified Next steps • Geological studies and seismic reprocessing under way • 2D and 3D seismic acquisition planned for 20

  35. Slide 35: Alentejo – New Frontier Area

    ALENTEJO – NEW FRONTIER AREA Key highlights Location • Concession contract signed on February 2007 • Exploration Period: 8 years • Whole area is new frontier • Seismic and geological studies under way Next steps • 3,000 km 2D seismic acquisition and processing during 2008 • Commitment exploration we

  36. Slide 36: More than 12 Leads Already Identified

    MORE THAN 12 LEADS ALREADY IDENTIFIED Key highlights Location • Farm-in Agreement signed in 2007 • Exploration period: 3+2+2 years • More than 12 leads identified • Intensive 2007/2008 seismic acquisition program on-going (more than 8,400 km2 3D seismic plus 3,100 km 2D seismic) Next steps • Seismic

  37. Slide 37: An Unexploited Area

    AN UNEXPLOITED AREA Key highlights Location • New frontier area • Exploration period: 4+2+2 years • Production period: 30 years • 1 main lead identified • Geological studies under way Area: 17,000 km2 Water depths: up to 2,600 m Next steps Galp Energia share: 10% Operator: ENI • Acquisition of 2,000

  38. Slide 38: Refining, Supply and Logistics

    REFINING, SUPPLY AND LOGISTICS Lisbon, 22 October 2007 Marques Gonçalves

  39. Slide 39: Strong Position in Iberia

    STRONG POSITION IN IBERIA Refining and Logistics Infrastructure Key Highlights • 100% of Portuguese or 20% of Iberian refining Coruña Somorrostro (220 kbpd) capacity (120 kbpd) • 69% of production corresponds to gasoline (25%) and middle distillates (44%) Porto Tarragona • Ownership interest in key

  40. Slide 40: Sines Is One of the Most Recent Refineries in Europe

    SINES IS ONE OF THE MOST RECENT REFINERIES IN EUROPE Asset Description Sines refinery diagram • Sines (1979), includes the following units: • Topping • 2 vacuum distillation • Fluid catalytic cracking • Visbreaker • 2 diesel hydrodesulphurization • Sines refinery is producing reformulated gasoline f

  41. Slide 41: A Specialities Refinery in Porto

    A SPECIALITIES REFINERY IN PORTO Asset Description Porto refinery diagram • The Porto refinery complex, built in 1969, includes: • Hydroskimming fuel plant • Aromatics plant • Base oil plant • Lubricants blending plant • Producer of paraxylene, ortoxylene, toluene and benzene for Portuguese and expo

  42. Slide 42: Enhancing Value Opportunity from Existing Portfolio

    ENHANCING VALUE OPPORTUNITY FROM EXISTING PORTFOLIO Rationale Strengths Refining margin target (Usd/bbl) +65% 8.9 • Market conditions • Integrated refining favour diesel vs fuel and marketing operations +3.5 • Dieselization of Iberian market • Financial capabilities to support investment • Improveme

  43. Slide 43: Potential Efficiency Gains in Refinery Operations

    POTENTIAL EFFICIENCY GAINS IN REFINERY OPERATIONS Sines Refinery Porto Refinery Maintenance Personnel cost efficiency efficiency Personnel, Maintenance, work hr/1000 Usd/EDC EDC Refining margin Maintenance, improvement Personnel, Process Usd/EDC work hr/1000 efficiency Process EDC utilization, % Pro

  44. Slide 44: Optimizing Refining System

    OPTIMIZING REFINING SYSTEM 9 Pre-Flash 6.9 7.9 9 Vacuum distillation 9 Visbreaker Porto 9 Vacuum Flash 9 Starting operations: 2010 Naphtha and fuel VGO Fully oil integrated 9 Hydrocracker refining system 9 Vacuum distillation 9 Vacuum Flash Sines 9 Starting operations: 2011 5.3 6.8 Nelson complexity

  45. Slide 45: Towards One Refining System

    TOWARDS ONE REFINING SYSTEM LPG LPG Gasoline focus Naphtha Gasoline T KERO FCC LCO+SLURRY O CRUDE P LPG P I Diesel N G VGO Diesel focus Naphtha HDC VGO Sines Diesel AR Vac. Vac. HGO HGO Dist. Dist. Res. oils Porto RV RV VB VB Porto Flux. RVB RVB F. Oil 45 Investor Day

  46. Slide 46: Improving Refining Portfolio Competitiveness

    IMPROVING REFINING PORTFOLIO COMPETITIVENESS Product Yield (M ton; %) Crude Processed (M bbl; %) 13.6 14.8 98.5 109.7 11% 11% Others Heavy/Medium 25% 19% Gasoline 59% Light Middle Distillates 75% Fuel 44% 57% 41% 20% 25% 13% Current After Current After Conversion Conversion Adjust production mix to

  47. Slide 47: Refining's EBITDA Fuelled by Conversion and Upgrading Investments

    REFINING’S EBITDA FUELLED BY CONVERSION AND OTHER UPGRADING INVESTMENTS Conversion Economics Perfomance Improvement Economics Estimated Capex 1,000 M€ Estimated Capex Starting Cogeneration plants 1502 M€ operations Energy efficiency program 100 M€ Porto 2010 Environmental compliance 174 M€ Sines 201

  48. Slide 48: Extracting Further Value from Existing Assets

    EXTRACTING FURTHER VALUE FROM EXISTING ASSETS Impact on Gross Margin (M Usd) 100 345 2 Current Refining margin Volume effect Total 1 effect 1 Assuming refining margin increment of 3.5 Usd/bbl times 98.5 M bbl. 2 Assuming refining margin of 8.9 Usd/bbl times incremental crude processed of 11.2 M bbl.

  49. Slide 49: Oil Marketing

    OIL MARKETING Lisbon, 22 October 2007 João Pedro Brito

  50. Slide 50: Galp Focusing in Iberia

    GALP FOCUSING IN IBERIA 2006 Sales to final clients (M ton) Market Portugal Share 1.7 9.0 Spain 0.4 3.6% 4.4 46% 2.5 Retail Wholesale LPG Special Clients Total Space to grow in the Spanish market 50 Investor Day

  51. Slide 51: Increase Retail Activity Efficiency and Effectiveness

    INCREASE RETAIL ACTIVITY EFFICIENCY AND EFFECTIVENESS Business Overview Key areas GALICIA • 1,041 service stations: 818 in Portugal and 5.5% CASTILLA-LEÓN 223 in Spain 1.5% ARAGÓN 0.8% CATALUÑA 2.9% • In the past 3 years there was a significant MADRID 4,2% expansion growth in C-stores business, over

  52. Slide 52: Wholesale as a Relevant Distributor of Refining Throughput

    WHOLESALE AS A RELEVANT DISTRIBUTOR OF REFINING THROUGHPUT Business Overview Main business segments’ clients 2006 Transports Manufacturing • 52% market share in Portugal 615 741 • Represents over 32% Resellers Aviation 772 168 of refining throughput Construction Marine • Aviation and marine segments

  53. Slide 53: An Innovative Approach to a Mature LPG Market

    AN INNOVATIVE APPROACH TO A MATURE LPG MARKET Business Overview • Stable market share in Portugal of 44% • Deliveries consistently high levels of profitability • Over 20 thousand points of sale • Market to stabilize at current levels • Launch of new products to capitalize on Galp Energia brand (cook

  54. Slide 54: Volume Growth Impacted by GDP Evolution

    VOLUME GROWTH IMPACTED BY GDP EVOLUTION Sales Volume (%) Sales Volume (%) 140% 140% Diesel 120% 120% Total Diesel 100% 100% Total 80% 80% Gasoline Gasoline Portugal 60% 60% Spain 2000 2001 2002 2003 2004 2005 2006 2000 2001 2002 2003 2004 2005 2006 GDP Growth (%) GDP Growth (%) 6 6 4 4 2 2 0 0 2000

  55. Slide 55: Extracting and Expanding Value in Iberia

    EXTRACTING AND EXPANDING VALUE IN IBERIA Rationale Strengths Galp Iberian Market (M ton) • Sustain market • Long position in leadership in Portugal refining • Extract further value • Strong brand from existing assets awareness 13.6 • Develop non-fuel • Logistic assets in 11.6 business place to suppo

  56. Slide 56: A More Efficient and Effective Retail Activity in Portugal

    A MORE EFFICIENT AND EFFECTIVE RETAIL ACTIVITY IN PORTUGAL Galp Sales Volume (M ton) 37% 37% 37% • Strong market share of 37% 2.1 2.0 2.0 • Increase penetration of premium products, from 7% to 15% • More than 120 million transactions per year 2004 2005 2006 Galp retail market share Number of Service

  57. Slide 57: Delivering on Spanish Strategy

    DELIVERING ON SPANISH STRATEGY Sales Volume (M ton) Galp market share • Boosting Galp presence in Spain 7% 5.3 • Market share in Spain increased to 7% 2% 3% 4% • No geographic overlapping 1.7 2.5 2.7 • Increasing refining and marketing integration • More than doubling volumes 2004 2005 2006 After Ag

  58. Slide 58: Highly Complementary Retail Network

    HIGHLY COMPLEMENTARY RETAIL NETWORK Galp Current Galp + AGIP GIJON ASTÚRIAS CANTABRIA PAIS BASCO GALICIA 10.5% GALICIA 3.5% 3.0% NAVARRA 5.5% 5.5% CASTILLA-LEÓN 7.3% CASTILLA- LA RIOJA ARAGÓN CATALUÑA LEÓN ARAGÓN 1.0% CATALUÑA 1.5% 4.9% 0.8% 2.9% 4.4% 9.7% BARCELONA MADRID MADRID 4,2% 5.5% CASTILLA-

  59. Slide 59: Geographical Diversification Achieved

    GEOGRAPHICAL DIVERSIFICATION ACHIEVED Sales Galp + AGIP (M ton) Breakdown Portugal 11.6 by Country 1.7 Spain 0.4 5.9 45% 3.6 55% Retail Wholesale LPG Special Clients Total 12% Iberian market share 59 Investor Day

  60. Slide 60: Further Integration to Reduce Risk Enhances Value

    FURTHER INTEGRATION TO REDUCE RISK ENHANCES VALUE Sales volumes (M ton) 13.6 13.6 11.6 +2.0 9.0 +2.6 100% To hedge 100% of refining throughput Galp 85% Energia needs to get 66% additional 2 M ton in Spain while diversifies geographical exposure Refining Current After LT target throughput volumes AGI

  61. Slide 61: Natural Gas

    NATURAL GAS Lisbon, 22 October 2007 Massimo Rivara

  62. Slide 62: Strong Competitiveness of Existing Contracts

    STRONG COMPETITIVENESS OF EXISTING CONTRACTS Sourcing Contracts Sales volumes (bcm) 4.6 4.2 • 5.7 bcm secured 4.0 • High flexibility • Maturity 2020/2026 • Option to deliver in any point in Iberia NG supply sources 2006 2004 2005 2006 Portuguese market Trading Algeria 45% Nigeria 55% Leverage on gas

  63. Slide 63: Seeking for New Sources

    SEEKING FOR NEW SOURCES Rationale Strengths Iberian market (bcm) 52.4 +40% • Strong growth • Competitive gas prospects sourcing 37.5 • Geographical expansion • Strong costumer base into Spain • Developing power • Defend current market projects share in Iberia • Access to critical 15% • Access to sou

  64. Slide 64: Guaranteed Access to Critical Infrastructure

    GUARANTEED ACCESS TO CRITICAL INFRASTRUCTURE Regasification Terminal Regasification Terminal Bilbao Irún – Larrau Mugardos Pipeline (In construction) 52% 100% 80% • Regasification capacity available for Iberian needs Regasification Terminal Barcelona 58% • Galp Energia has an important stake in Rega

  65. Slide 65: Galp Storage Assets Key for Opportunistic Trading

    GALP STORAGE ASSETS KEY FOR OPPORTUNISTIC TRADING Galp Storage Rationale • Location : Carriço • Stable return • Underground storage capacity: • Equivalent to a LNG vessel • 1st cavern already in operation (40 Mm3) • Ability to exploit trading opportunities • 2nd cavern to start operations in • One o

  66. Slide 66: Stable Return with Growth Potential

    STABLE RETURN WITH GROWTH POTENTIAL Infrastructure Liberalization • Unbundling of commercialization activities for companies with more than 100 thousand clients • Over 800 thousand clients • Others will have to present separate accounts Regulation • Actual regulated asset base of 853 M€ • Expected r

  67. Slide 67: Strong Growth Prospects in Iberian Natural Gas Market

    STRONG GROWTH PROSPECTS IN IBERIAN NATURAL GAS MARKET NG Market – Portugal (bcm) NG Market – Spain (bcm) 7.6 44.8 0.9 CAGR 5% CAGR 11% 33.5 12.4 2.7 10.5 4.0 0.7 18.1 1.5 14.3 4.0 14.3 1.8 8.6 2006 2012E 2006 2012E NG in Primary 15% 22% 22% 25% Energy Electric Industrial Residential and others 67 In

  68. Slide 68: Higher Margin Volumes Kept at Galp

    HIGHER MARGIN VOLUMES KEPT AT GALP Liberalization calendar > 10 k m3/y Remaining To be regulated > 1 Mm3/y from 1st July 2008 Not Electric regulated 2007 2008E 2009E 2010E Regulated and electric volumes to be maintained at Galp 68 Investor Day

  69. Slide 69: Growth Coming from Own Consumption and Geographical Expansion

    GROWTH COMING FROM OWN CONSUMPTION AND GEOGRAPHICAL EXPANSION Galp Energia NG Sales (bcm) Includes Trading and other liberalized sales +1.6 6.2 from LDC’s 0.3 0.6 4.6 LDC’s regulated sales 0.6 2.8 0.7 Includes incremental consumption from two 1.5 new cogens and Spanish market 2.5 1.8 Maximum level o

  70. Slide 70: Power

    POWER Lisbon, 22 October 2007 André Ribeiro

  71. Slide 71: A Gas to Power Portfolio

    A GAS TO POWER PORTFOLIO 800 1,200 MW CO2 Wind io mitigation t fol o r a p n g opi el CCGT v De CCGT Gas to 160 Power 160 Wind 80 New Cogens Cogen Cogens Special Regime Producers Market 71 Investor Day

  72. Slide 72: CCGT Projects with Sound Fundamentals

    CCGT PROJECTS WITH SOUND FUNDAMENTALS CCGT load factor and Spanish pool price Projected Installed Capacity (MW) cent€/ KWh 63% 7 61% 6 400 50% 52% 46% 47% 5 39% 40% 4 800 3 2 400 1 0 2003 2004 2005 2006 3Q 2010E 4Q 2010E Gas Portuguese CCGT load factor 600 Mm3 consumption Spanish CCGT load factor Sp

  73. Slide 73: Cogeneration Business with Positive Impact on Galp's Value Chain

    COGENERATION BUSINESS WITH POSITIVE IMPACT ON GALP’S VALUE CHAIN Regulation Projected installed capacity (MW) 244 • Granted tariff for a period of 15 years 82 • Tariff covers avoided costs in - 82 80 • Investment in alternative baseload technology • O&M and fuel costs 2007 2008E 2009E 2010E Total Na

  74. Slide 74: Galp Energia Delivering on Wind Project

    GALP ENERGIA DELIVERING ON WIND PROJECT Regulation Projected installed capacity (MW) 1 • Average regulated tariff of 73.6 €/MWh, +144 +8 80 to be adjusted with CPI from start of +76 operations +64 400 +108 • Granted tariff for a minimum of 15 years or 33 GWh/MW and option to pass to 2009E 2010E 2011

  75. Slide 75: Moving into Power Business

    MOVING INTO POWER BUSINESS Rationale Strengths Target installed capacity (MW) • Value accretive Gas & • Efficient gas sourcing Power integrated contracts Hydro approach 1,200 • Opportunity to • Attractive electricity develop competitive market growth generation mix • Opportunity in green • Strong cu

  76. Slide 76: Gas & Power Approach Reduces Overall Business Risk

    GAS & POWER APPROACH REDUCES OVERALL BUSINESS RISK Galp Energia planned Natural Gas generation mix Demand (bcm) 160 Cogens 2.1 Additional Galp Energia incremental demand 0.4 1.1 Galp Energia own 800 CCGT consumption 4.0 Portuguese market 2006 160 Wind Galp Energia Market 2012E Own consumption increa

  77. Slide 77: Call Option Profile of Integrated Gas and Electricity Approach

    CALL OPTION PROFILE OF INTEGRATED GAS AND ELECTRICITY APPROACH Additional flexibility gain from CCGT project Gas margin Gas cost Spark spread CCGT project will allow to arbitrage between gas trading and power margins 77 Investor Day

  78. Slide 78: Portfolio's Competitiveness to Be Complemented by Hydro

    PORTFOLIO’S COMPETITIVENESS TO BE COMPLEMENTED BY HYDRO Indicative cost structure by generation type (MWh) CCGT and Hydro usage Nuclear Hydro CO2 free Available technologies Gas Coal Fuel Capital O&M Fuel CO2 Source: BCG 78 Investor Day

  79. Slide 79: Hydro Incremental Capacity Is an Opportunity to Diversify

    HYDRO INCREMENTAL CAPACITY IS AN OPPORTUNITY TO DIVERSIFY New hydro capacity to be licensed Project Installed capacity (MW) Production (GWh) Ribeiradio 70 110 Foz Tua 234 340 Fridão 163 299 Padroselos 113 102 Gouvães 112 153 Daivões 109 148 Vidago 90 114 Almourol 78 209 Pinhosão 77 106 Girabolhos 72

  80. Slide 80: To Become the Alternative Player in Portugal

    TO BECOME THE ALTERNATIVE PLAYER IN PORTUGAL 1 SRP 1 SRP Fuel oil Coal CCGT More efficient generation mix than average CCGT Nuclear Hydro Hydro Iberia 2010E Galp target portfolio 1 SRP – Special Regime Production 80 Investor Day

  81. Slide 81: Lock in Value in Electricity

    LOCK IN VALUE IN ELECTRICITY Sales Mix Base Case Sales Mix Target Pending on supply margin’s evolution Galp electricity Final clients Pool Galp electricity Final clients Pool production production Leverage on oil and gas customer base 81 Investor Day

  82. Slide 82: Financial Overview

    FINANCIAL OVERVIEW Lisbon, 22 October 2007 Francesco Antonietti, CFO

  83. Slide 83: Galp's Businesses in Different Momentums

    GALP’S BUSINESSES IN DIFFERENT MOMENTUMS EBITDA IFRS (M€) EBITDA Adjusted (M€) 1,241 0.5x 958 627 0.5x 587 581 560 481 425 0.4x 320 272 1.0x 118 125 79 80 79 80 E&P R&M G&P Consolidated E&P R&M G&P Consolidated 2006 1H2007 2006 1H2007 1H07/06 • E&P confirming growth in production • R&M stable even w

  84. Slide 84: Adjusted EPS Increased by 71% to €0.34

    ADJUSTED EPS INCREASED BY 71% TO €0.34 IFRS Adjusted H106 H107 % Ch. € Million H106 H107 % Ch. 6,130 5,894 (3.9%) Sales 6,054 5,890 (3.0%) 615 627 2.0% EBITDA 404 481 19.2% 475 498 4.8% EBIT 264 360 36.4% 19 31 59.4% Income from Associates 19 31 59.4% 354 401 13.4% Net Income 167 285 71.0% 0.43 0.48

  85. Slide 85: Controlled Operating Costs

    CONTROLLED OPERATING COSTS External Supplies & Services 2006 (M€) Operating costs1 2006 (M€) Variable costs 2006 13 Fixed costs 2006 79 24% 0% 3% 4% 221 208 19 693 130 858 270 347 17 69% 71% 66% E&P R&M G&P Consolidated 87% Employees (#) 31% 29% 34% 12 (77) 13% (194) 2 (38) E&P R&M G&P Consolidated

  86. Slide 86: Capital Expenditures Supporting Growth

    CAPITAL EXPENDITURES SUPPORTING GROWTH Breakdown by segment: M€ Maintenance (%) Expansion (%) Total Capex Comments Maintenance and environmental investments in both refineries, 70 construction of new service stations in R&M1) 50 50 145 131 Portugal and in Spain, construction of 30 strategic storage

  87. Slide 87: Low Debt Level at 0.4x Debt to Equity

    LOW DEBT LEVEL AT 0.4x DEBT TO EQUITY 30 June 2007 M€ Short Term Long Term Debt exposure to interest rates Fixed rate Bonds - 226 25% Bank debt 325 273 Variable rate 75% Commercial 275 - Paper Debt reimbursement plan (M€) Cash (182) - 245 Net Debt 918 68 36 38 37 26 20 Average life - 3.98 years 2007

  88. Slide 88: Strong Cash Flow Generation Allowed Debt Reduction

    STRONG CASH FLOW GENERATION FROM OPERATING ACTIVITIES ALLOWED DEBT REDUCTION M€ 1,192 38 918 319 1,280 1,606 305 Net debt 2005 Operating cash Investment Dividends paid Net interests Others Net debt flow cash flow net and taxes 1H2007 of subsidies 88 Investor Day

  89. Slide 89: Off Balance Sheet Responsibilities

    OFF BALANCE SHEET RESPONSABILITIES Total responsibilities Coverage Type of benefits 2006 • Pension Fund: 370 M€ Pensions 397 M€ (95% funded) Pre and early • Provisions: 213 M€ retirements 81 M€ • Accumulated deviation1: 106 M€ • 64 M€ within the corridor Health and life insurance 211 M€ • 42 M€ outs

  90. Slide 90: Stable and Clear Dividend Policy

    STABLE AND CLEAR DIVIDEND POLICY Annual Dividend of year n Net income IFRS 50% payout @ replacement x ratio Annual Dividend cost 2006 dividend of 0.304 €/share (paid in June 19, Interim Dividend of year n+1 2007) Annual 50% x dividend of Interim dividend year n • Subject to approval of all related p