Lindian Resources Limited · ASX:LIN

Lindian Resources — Africa Down Under Conference 2023

32 slides from Lindian Resources's conference presentation, Sep 8, 2023

  1. Slide 1: Kangankunde "The King" - Africa Down Under Conference

    For personal use only KANGANKUNDE “THE KING” Africa Down Under Conference Rare Earths | Bauxite September 2023

  2. Slide 2: Disclaimer

    DISCLAIMER The material in this presentation has been prepared by Lindian Resources Limited (“Company”). This presentation may not be reproduced, redistributed or passed on, directly or indirectly, to any other person, or published, in whole or in part, for any purpose without prior written approval

  3. Slide 3: Corporate Overview

    CORPORATE OVERVIEW Company ASX Code LIN Share Price ~A$0.30 For personal use only Ordinary Shares on Issue 1.139B Substantial Shareholders Performance Rights 29m Kabunga Holdings Pty Ltd 11.0% Options on Issue : Conversion value A$20.6M ~97M Bonacare Pty Ltd / Topwei Pty Ltd / Wei & Zhang 10.8% Mark

  4. Slide 4: Board & Management

    BOARD & MANAGEMENT • Tanzanian born Australian entrepreneur Asimwe • The visionary behind the company’s strategy Kabunga • Major shareholder Executive Chairman • Commercially astute and strategic investor • 36-year mining industry veteran, ~20 years in critical minerals • For personal use only 35-ye

  5. Slide 5: Kangankunde Rare Earths Project

    For personal use only KANGANKUNDE RARE EARTHS PROJECT ASX: LIN 5

  6. Slide 6: Regional Location

    For personal use only REGIONAL LOCATION ASX: LIN 6

  7. Slide 7: Mineral Resource Statement

    MINERAL RESOURCE STATEMENT “THE KING” 15 core or RC/core drill holes, 76 RC drill holes for 15,831 metres of drilling Inferred Category1 Million tonnes Grade TREO % TREO Tonne NdPr tonne For personal use only Domain 1 58 1.8 1.0 mt 0.2 mt Domain 2 72 1.9 1.4 mt 0.3 mt Domain 3 23 3.2 0.7 mt 0.14 mt

  8. Slide 8: Project Geology and MRE

    For personal use only PROJECT GEOLOGY AND MRE RESOURCE EXTENSION POTENTIAL Refer www.lindianresources.com.au for information on results of drilling ASX: LIN 8

  9. Slide 9: MRE Cross Sections

    MRE CROSS SECTIONS Geology, Block Model & Drill Holes For personal use only MINERALISATION EXTENDS INDICATED RESOURCE (INFILL) DRILL BELOW MRE PROGRAM UNDERWAY RCDD074 Refer ASX:LIN release dated 31st July 2023 for information on results of drilling Refer www.lindianresources.com.au ASX: LIN 9

  10. Slide 10: Regional Geology

    REGIONAL GEOLOGY Prospective Regional Targets MINERALISATION POTENTIAL IN THE NORTH For personal use only ASSESSMENT IN PROGRESS MINERALISATION POTENTIAL SURROUNDING THE MRE ASSESSMENT IN PROGRESS MINERALISATION POTENTIAL IN THE SOUTH ASSESSMENT LATER Refer www.lindianresources.com.au for informatio

  11. Slide 11: Product Quality

    PRODUCT QUALITY 1 Concentrate NdPr Kangankunde Recovery Radiation2 Price $US/Kg (% TREO) (% of TREO) For personal use only Metallurgy results1 70% 66% 20.2 No To be negotiated Enhances downstream Significantly lowers Should attract a significant Water only separation Adds significant value Implicati

  12. Slide 12: Stage Processing Plant

    STAGE 1 PROCESSING PLANT Proposed staged strategic development objectives For personal use only Engineering 3D Plant Model of Stage 1 Processing Facility ASX: LIN 12

  13. Slide 13: Technical Works Programs 2023/24

    Technical Works Programs 2023/24 August September October November December Deliverables 2023 2023 2023 2023 2023 For personal use only MRE Inferred Mineral Resource Estimate Indicated + Inferred Infill Drill Program Mine Design Mine Plan & Schedule Metallurgy Metallurgy Report Plant Design Engineer

  14. Slide 14: NdPr The Key to Magnets

    NdPr THE KEY TO MAGNETS The supply chain for NdPr needs to be resolved to NdPr is 90% of the REO Market Value unlock the supply chain to TbDy use only 100 100 90 90 80 80 70 70 60 For personal 60 %age %age 50 50 40 40 30 30 20 20 10 10 0 Batteries + Metallurgy Phosphors Magnets 0 Catalysts Category

  15. Slide 15: NdPr Essential to Wind Turbines

    For personal use only NdPr ESSENTIAL TO WIND TURBINES Source REIA weekly newsletter 5th September 2023 ASX: LIN 15

  16. Slide 16: Rare Earths Market Dynamics

    For personal use only RARE EARTHS MARKET DYNAMICS Current Market Dynamics ASX: LIN 16

  17. Slide 17: Rare Earths Market Metal & Magnet Producers

    RARE EARTHS MARKET METAL & MAGNET PRODUCERS For personal use only 1. Modified from Goldman Sachs ASX: LIN 17

  18. Slide 18: Kangankunde - Pathway to Carbon Neutral

    For personal use only KANGANKUNDE - Pathway to Carbon Neutral Water Sustainable Environmental Community Sustainable Preservation Power Care Mining • Water based • Hydroelectric grid • Reforestation • Assistance • Electric Mining recovery process power programs programs Fleet • Water recycling • Sust

  19. Slide 19: The Kangankunde Community

    THE KANGANKUNDE COMMUNITY Assistance to Police Station construction Government For personal use only Geologist Insert photos from site and community montage assisting development Ministerial and Dignitaries site visit Australian Government hosted event Local community information forums ASX: LIN 191

  20. Slide 20: Project Summary

    PROJECT SUMMARY KANGANKUNDE “THE KING” TENURE METALLURGY For personal use only RESOURCE Mining Licence + Global leading REO 70% recovery Environmental Resource 60% concentrate grade Certificate issued 20% NdPr    DEVELOPMENT STRATEGIC ESG Design programs well An enabler to an Government support a

  21. Slide 21: Guinea Bauxite Project

    For personal use only GUINEA BAUXITE PROJECT ASX: LIN 21

  22. Slide 22: Guinea Bauxite Project

    GUINEA BAUXITE PROJECT 1B TONNE of BAUXITE RESOURCES 1 Gaoual Project For personal use only 101.5MT –upgradable from 49.8% to ~59% Al 203 & 2.8% Si02 Lelouma Project 900MT ~45% Al203 & 2.1% Si02 Woula Project 19MT ~41.7% Al203 & 3.2% Si02 Simple screening and bulk handling processes Located close to

  23. Slide 23: Guinea: Increased Export Capacity

    GUINEA: INCREASED EXPORT CAPACITY Lelouma Guinea Bauxite Supply • Lindian’s bauxite projects have For personal use only Gaoual Woula a combined 1BT JORC resource • Guinea export capacity has increased by 500% from approx. 20Mt per year in 2015 to over 100Mt per year in 2021 • Guinea bauxite producti

  24. Slide 24: Gaoual

    GAOUAL Very high-grade, low silica (screening studies), close to infrastructure located approximately 60km to CBG railhead. For personal use only Resources Cut-off Grade Grade Category (Mt) (Al2O3%) (Al2O3%) (SiO2%) High Grade 83.8 45 51.2 11.0% Indicated Resources Total Resources 101.5 40 49.8 11.5

  25. Slide 25: Gaoual Marketable Product

    GAOUAL MARKETABLE PRODUCT: From screening studies, the sample specifications for marketable and saleable product, are listed below: For personal use only Marketable Product Al2O3 grade SiO2 Fe2O3 TiO2 LOI Moisture Size 85 Million Tonne 58.3 <2.8% <8% 2.6% 28% 10% 0-100mm +-2% +-0.5% +-2% +-0.5% +-2%

  26. Slide 26: Lelouma

    LELOUMA Large Resource, High grade, Low silica Mineral Resource Cut-off Criteria Tonnes (Mt) Al2O3 (%) SiO2(%) Category For personal use only Measured 155 47.9 1.8 >40% Al2O3 Indicated 743 44.4 2.1 >10% SiO2 >1m Thick Measured + Indicated 898 45.0 2.1 <1 Strip Ratio (waste: ore thickness) Inferred 2

  27. Slide 27: Woula

    WOULA Supplementary feed asset close to infrastructure Mineral Resource Cut-off Criteria Tonnes (Mt) Al2O3 (%) SiO2(%) Category For personal use only >40% Al2O3 Inferred 19 41.7 3.2 >10% SiO2 >1m Thick <1 Strip Ratio (waste: ore Total 19 41.7 3.2 thickness) Sources: 6 GlobalData | 7 www.crugroup.com

  28. Slide 28: Why Lindian?

    WHY LINDIAN? Two world class projects in commodities that are in high demand and integral to electric vehicles and global decarbonization strategy. For personal use only Kangankunde a global leading rare earth project located in the safe, mining friendly jurisdiction of Malawi Kangankunde a Tier 1 A

  29. Slide 29: Contact

    CONTACT www.lindianresources.com.au For personal use only +61 8 6557 8838 Level 24, 108 St Georges Terrace Perth WA 6000 Alistair Stephens (CEO) ajs@lindianresources.com.au

  30. Slide 30: Competent Person Statement

    KANGANKUNDE COMPETENT PERSON STATEMENT The Competent Persons’ consents for the Mineral Resource Estimate for Kangankunde1 remain in place for subsequent releases by the Company of the same information in the same form and context as originally For personal use only announced, until the consent is wi

  31. Slide 31: Appendix A: Mineral Resource

    Appendix A: Mineral Resource Table 1: Kangankunde Rare Earths Mineral Resource (at 0.5% TREO cut-off) Tonne La2O3 CeO2 Pr6O11 Nd2O3 Sm2O3 Eu2O3 Gd2O3 Tb4O7 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2 O 3 Class s (Mt) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm

  32. Slide 32: Appendix B: ASX announcements

    Appendix B: ASX announcements List of ASX Announcements released by Lindian relating to the Kangankunde Rare Earths Project For personal use only Date of Release Title 1-Aug-2022 Lindian to Acquire 100% of Globally Significant Kangankunde Rare Earths Project 5-Jan-2023 Kangankunde Delivers Outstandi

Lindian Resources — Africa Down Under Conference 2023 on 6ix