ABx Group Limited · ASX:ABX
ABx — Australian Bauxite — Mining 2010 Conference
13 slides from ABx's conference presentation, Oct 28, 2010

Slide 1: ASX Announcement: CEO Presentation at Mining 2010 Conference
ASX ANNOUNCEMENT 28 October 2010 ASX : ABZ CEO Presentation at Mining 2010 Conference In accordance with the requirements of Listing Rule 3.1 we submit the attached material being presented this morning at the Mining 2010 Conference being held in Brisbane QLD. Mr Ian Levy, CEO is making the presenta

Slide 2: Australian Bauxite Limited - Better Bauxite; Mission 1
AUSTRALIAN BAUXITE LIMITED 27 October 2010 “Better Bauxite” Bauxite is the ore for aluminium and alumina ASX Code “ABZ” Level 2 Hudson House 131 Macquarie St Sydney NSW 2000 Australia Phone: +61 2 9251 7177 Ian Levy, CEO Facsimile: +61 2 9251 7500 Mob: 0407 189 122 E: corporate@australianbauxite.com

Slide 3: Mission 2 and Forward Looking Statement
Mission 2 Sell bauxite products to Australia’s large Aluminium Industry Weipa Gove Mitchell Plateau (Dormant) World’s largest alumina refineries World’s largest East Australian alumina production Bauxite Province Darling ABx 24 tenements Ranges ABx bauxite deposits Other Bauxite Projects Aluminium S

Slide 4: Company Overview - Why Invest?
Company Overview WHY INVEST? • 33 tenements 7,600 km2 in QLD, NSW & Tas 100% owned • 980 drillholes totalling 10,100 metres Drilling fast • Exploration Target 200Mt to 300Mt 200Mt is big • Bauxite Ore typically high quality Premium • No restrictions on bauxite exports Can export • Peers blocked by s

Slide 5: Corporate Structure, Management and Share Performance
Corporate Structure • Shares 99.1 million • Shareholders 640 Hudson Resources (founder) 55.6m (56.1%) escrowed to Dec 2011 State One 6.0m ( 6.1%) Management • Directors P Meers, I Levy, J Rebek, V Tan, W Huang Secretary: H Kinstlinger • Expertise Jacob Rebek – ex CRA (Rio) Chief Geologist Discovered

Slide 6: Rapidly Growing Resource Base and Market Fundamentals
Rapidly Growing Resource Base & Discoveries Binjour : high grade, concealed bauxite drilled mid 2010. New lease covers the extensions Inverell : 35 million tonnes, 5.3m thick bauxite Taralga : 5.4Mt maiden resource, 4.5m thick bauxite, finding more Tasmania : drilling in progress – bauxite being enc

Slide 7: Market Dynamics; China Bauxite Imports & Prices Growing
Market Dynamics • Aluminium demand rising strongly – the most modern metal • China is the largest producer of alumina but many Chinese refineries rely on bauxite imports from Indonesia‐Australia • Indonesia may curtail bauxite exports, so China, Russia & India need new bauxite provinces to open. Aus

Slide 8: Strategy: 3 Ways to Success; Exploration Ahead of Schedule
Strategy: 3 ways to success 1. Direct‐Shipping Bauxite “DSO” early cashflows • Near‐rail/ports: Southern NSW First? Central QLD? • Simple projects: Dig, screen, ship • Potential customers/partners identified 2. Premium‐Grade Bauxite (higher revenues) • Adds value, reduces freight 3. Major Bauxite Pr

Slide 9: Excellent bauxite results at Binjour
Excellent bauxite results at Binjour Binjour 15 AUSTRALIAN BAUXITE LIMITED Excellent bauxite results at Binjour Hole From To Metres Whole Sample m m m Al2O3avl% Rx SiO2% Avl/Sx Al2O3% SiO2% A/S Fe2O3% TiO2% LOI% BJ006 7 12 5 36.3 3.0 12.0 40.9 3.7 11.0 31.9 3.9 18.8 BJ031 11 17 6 38.5 1.8 21.4 43.5

Slide 10: Binjour Plateau Secured; Inverell Large Deposit Emerging
Binjour Plateau Secured by New Tenement New EPMA N Binjour Plateau and ABx Tenements 2 km New tenement secures entire Binjour Plateau Drilled 5% of southern target area tested discovered a thick, high quality concealed bauxite layer : surface mapping suggests that the bauxite outcrops in places EPM

Slide 11: Taralga-Goulburn Bauxite Projects; Tasmania the New Frontier
Taralga‐Goulburn Area Bauxite Projects Goulburn to Port Kembla is 145kms by rail Deposits at surface, near rail, near port Goulburn Less than 10% of targets Avl Resource Tonnes Thicknes Al203 SiO2 Avl/Sr Al203 SiO2 % A/S Fe2O3 LOI % tested to date category millions sm Rx % x ratio % ratio % % Inferr

Slide 12: Why Mine Australian Bauxite?; Work Schedule and Information Flow
Why Mine Australian Bauxite? We do it better Alumina‐Alcoa’s Rehabilitation WA A mined area at Huntly prior to rehabilitation The same mine pit after rehabilitation Bauxite at Longkou Port Shandong China 21 AUSTRALIAN BAUXITE LIMITED Photo by Clark & Marron Work Schedule and Information Flow ABx Tim

Slide 13: Southern QLD Bauxite Drilling; Current Tenement Areas
Schematic section Tel: +61 (0) 2 9251 7177 www.australianbauxite.com.au Thin Soil Bauxite Drilling Clays Sth QLD Bauxite drilled May - July 2010 Haden EPM17830 in QLD: bauxite outcrop. 23 AUSTRALIAN BAUXITE LIMITED Current Tenement Areas ABZ’s tenements control the core of the Eastern Australian Bau
Source: Internet Archive copy of abxgroup.com.au
More decks from ABx Group Limited
Technical Presentation (May 2026)20 slides · May 25, 2026
Technical Presentation (April 2026)21 slides · Apr 23, 2026
PDAC Convention 202615 slides · Mar 3, 2026
Investor Presentation (November 2025)35 slides · Nov 26, 2025
Fluorine Forum 202517 slides · Oct 23, 2025
Tasmanian Minerals, Manufacturing and Energy Council Annual Conference 202515 slides · Jul 30, 2025