Pampa Camarones SpA Class B — Corporate Update (March 2024)
8 slides from Pampa Camarones SpA Class B's corporate update, March 2024
Slide 1: Pampa Camarones Provides Positive Preliminary Drill Results at the Ciclón-Exploradora Project
Pampa Camarones SpA Pampa Camarones Provides Positive Preliminary Santiago, March 2024 Drill Results at the Ciclón-Exploradora Project Strictly private and confidential
Slide 2: Ciclón-Exploradora Drill Program Update: Highlights
Ciclón Exploradora Drill Program Update Ciclón-Exploradora Drill Program Update: Highlights Pampa Camarones is pleased to announce positive initial results from its 2,000m Scouting Drill Program, consisting of preliminary assay results and geological information from recently completed diamond drill
Slide 3: San Carlos Drilling Campaign: Significant Ag-Zn High-Grade Result
Ciclón Exploradora Drill Program Update San Carlos Drilling Campaign: Significant Ag-Zn High-Grade Result Significant assay results were obtained from initial two drill-holes at the San Carlos Target, successfully intercepting intervals of manto polymetallic deposit. These results confirms the conti
Slide 4: San Carlos Cross Section: New Intercepts and Proposed Drilling Target
Ciclón Exploradora Drill Program Update San Carlos Cross Section: New Intercepts and Proposed Drilling Target Recommended •DDH-SC-07 drill-hole •+3300 •DDH-SC-09 9.4m @ 59g/t Ag + 2.9% Zn + 0.6% Pb •+3225 1.9m @ 555g/t Ag+3.0% Zn+4.9% Pb •+3150 Geophysical Target •+3075 2.0 m @ 172 g/t Ag (0.3 % Pb)
Ciclón Exploradora Drill Program Update Portezuelo Drilling Campaign: Discovery of Cu-Zn (Ag-Pb) Vein Extension Preliminary geological drilling results confirms the discovery of a new mineralized copper-rich zone of ~1.3 km vein- breccia corridor related to deep IP anomalies. The deposit contains de
Slide 6: Portezuelo Longitudinal Section: New Discovery Drill Holes on 1.3 Km of Vein Extension
Ciclón Exploradora Drill Program Update Portezuelo Longitudinal Section: New Discovery Drill Holes on 1.3 Km of Vein Extension DDH-PO-03 EXPLORADORA VEIN •+3600 DDH-PO-02 (in progress) RESOURCES DDH-PO-01 Vein •+3450 Projection ~4m @ >1.6% Cu* (+Ag) Oxides •+3300 IP- Chg >20 ~5m @ >1.5% Cu* + 3% Zn
Slide 7: Portezuelo Drilling Campaign: Copper and Zinc Mineralization
Ciclón Exploradora Drill Program Update Portezuelo Drilling Campaign: Copper and Zinc Mineralization Visible copper and zinc sulphide mineralization from DDH-PO-01, 413m below surface. Drillhole DDH-PO-02. Copper Oxides (Chrysocholla, Limonites, Brochantite) Strictly private and confidential 7
Slide 8: Ciclón-Exploradora Drilling Campaign
Ciclón Exploradora Drill Program Update Ciclón-Exploradora Drilling Campaign Strictly private and confidential 8