Pampa Camarones SpA Class B · BCS:CAMARONEX

Pampa Camarones SpA Class B — Corporate Update (March 2024)

8 slides from Pampa Camarones SpA Class B's corporate update, March 2024

  1. Slide 1: Pampa Camarones Provides Positive Preliminary Drill Results at the Ciclón-Exploradora Project

    Slide 1: Pampa Camarones Provides Positive Preliminary Drill Results at the Ciclón-Exploradora Project

    Pampa Camarones SpA Pampa Camarones Provides Positive Preliminary Santiago, March 2024 Drill Results at the Ciclón-Exploradora Project Strictly private and confidential

  2. Slide 2: Ciclón-Exploradora Drill Program Update: Highlights

    Slide 2: Ciclón-Exploradora Drill Program Update: Highlights

    Ciclón Exploradora Drill Program Update Ciclón-Exploradora Drill Program Update: Highlights Pampa Camarones is pleased to announce positive initial results from its 2,000m Scouting Drill Program, consisting of preliminary assay results and geological information from recently completed diamond drill

  3. Slide 3: San Carlos Drilling Campaign: Significant Ag-Zn High-Grade Result

    Slide 3: San Carlos Drilling Campaign: Significant Ag-Zn High-Grade Result

    Ciclón Exploradora Drill Program Update San Carlos Drilling Campaign: Significant Ag-Zn High-Grade Result Significant assay results were obtained from initial two drill-holes at the San Carlos Target, successfully intercepting intervals of manto polymetallic deposit. These results confirms the conti

  4. Slide 4: San Carlos Cross Section: New Intercepts and Proposed Drilling Target

    Slide 4: San Carlos Cross Section: New Intercepts and Proposed Drilling Target

    Ciclón Exploradora Drill Program Update San Carlos Cross Section: New Intercepts and Proposed Drilling Target Recommended •DDH-SC-07 drill-hole •+3300 •DDH-SC-09 9.4m @ 59g/t Ag + 2.9% Zn + 0.6% Pb •+3225 1.9m @ 555g/t Ag+3.0% Zn+4.9% Pb •+3150 Geophysical Target •+3075 2.0 m @ 172 g/t Ag (0.3 % Pb)

  5. Slide 5: Portezuelo Drilling Campaign: Discovery of Cu-Zn (Ag-Pb) Vein Extension

    Slide 5: Portezuelo Drilling Campaign: Discovery of Cu-Zn (Ag-Pb) Vein Extension

    Ciclón Exploradora Drill Program Update Portezuelo Drilling Campaign: Discovery of Cu-Zn (Ag-Pb) Vein Extension Preliminary geological drilling results confirms the discovery of a new mineralized copper-rich zone of ~1.3 km vein- breccia corridor related to deep IP anomalies. The deposit contains de

  6. Slide 6: Portezuelo Longitudinal Section: New Discovery Drill Holes on 1.3 Km of Vein Extension

    Slide 6: Portezuelo Longitudinal Section: New Discovery Drill Holes on 1.3 Km of Vein Extension

    Ciclón Exploradora Drill Program Update Portezuelo Longitudinal Section: New Discovery Drill Holes on 1.3 Km of Vein Extension DDH-PO-03 EXPLORADORA VEIN •+3600 DDH-PO-02 (in progress) RESOURCES DDH-PO-01 Vein •+3450 Projection ~4m @ >1.6% Cu* (+Ag) Oxides •+3300 IP- Chg >20 ~5m @ >1.5% Cu* + 3% Zn

  7. Slide 7: Portezuelo Drilling Campaign: Copper and Zinc Mineralization

    Slide 7: Portezuelo Drilling Campaign: Copper and Zinc Mineralization

    Ciclón Exploradora Drill Program Update Portezuelo Drilling Campaign: Copper and Zinc Mineralization Visible copper and zinc sulphide mineralization from DDH-PO-01, 413m below surface. Drillhole DDH-PO-02. Copper Oxides (Chrysocholla, Limonites, Brochantite) Strictly private and confidential 7

  8. Slide 8: Ciclón-Exploradora Drilling Campaign

    Slide 8: Ciclón-Exploradora Drilling Campaign

    Ciclón Exploradora Drill Program Update Ciclón-Exploradora Drilling Campaign Strictly private and confidential 8

Source: company website

More decks from Pampa Camarones SpA Class B

All 16 Pampa Camarones SpA Class B decks