Slide 1: Endesa Chile 1H 2013 results
25| 07 | 13 endesa chile 1H 2013 results
Slide 2: Highlights of 1H 2013
Endesa Chile consolidated results 1H 2013 Highlights of 1H 2013 Lower generation revenues, mainly explained by lower hydro generation in Chile as a consequence of lower water availability. Lower generation costs, mainly explained by the commissioning of Bocamina II and lower LNG prices. 10% increase
Slide 3: Results affected by the poor hydro generation in Chile
Endesa Chile consolidated results 1H 2013 Results affected by the poor hydro generation in Chile 1H 2013 1H 2012 1H 2013 Indicator Change MM ch$ MM ch$ MM US$1 Revenues 1,015,797 1,127,497 (10%) 2,122 Operational Expenses (22%) (532,591) (679,683) (1,113) Contribution margin 483,206 447,814 8% 1,009
Slide 4: EBITDA by Country
Endesa Chile consolidated results 1H 2013 EBITDA by Country Total Installed Capacity 1: 13,794 MW Total Generation 1 (TTM): 57,286 GWh Chile Argentina Chile Argentina 40% 19% 39% 27% Peru Peru 16% 12% Colombia Colombia 21% 26% EBITDA 1H13 (TTM): US$ 1,811 million Argentina 3% Chile 35% Peru 16% Ende
Slide 5: Balanced Commercial Policy
Endesa Chile consolidated results 1H 2013 Balanced Commercial Policy Physical Sales as of June 2013 Chile Colombia Peru Argentina 2% 10% 22% 19% 31% 50% 36% 54% 76% 81% 19% Regulated Unregulated Spot Physical Sales as of June 2012 Chile Colombia Peru Argentina 3% 6% 27% 17% 29% 29% 54% 68% 65% 19% 8
Slide 6: Strong Financial Position
Endesa Chile consolidated results 1H 2013 Strong Financial Position 1H 2013 2012 1H 2013 Indicator Change % Change MM Ch$ MM Ch$ MM US$ Gross Debt 2,006,465 2,069,034 (3%) (62,569) 3,956 Cash1 172,777 260,798 (51%) (88,021) 341 Net Debt 1,833,688 1,808,236 1% 25,451 3,616 Leverage 0.89 0.88 1% 0.01
Slide 7: Healthy Debt Profile and Credit Risk Ratings
Endesa Chile consolidated results 1H 2013 Healthy Debt Profile and Credit Risk Ratings Financial Debt Maturity US$ Million 2013 2014 2015 2016 2017 Balance TOTAL Chile 742 165 219 15 12 897 2,050 Argentina 186 40 14 10 - - 251 Peru 15 52 36 60 50 81 294 Colombia - 73 151 21 109 1,007 1,362 TOTAL 943
Slide 8: Free Cash Flow (US$ million)
Endesa Chile consolidated results 1H 2013 Free Cash Flow (US$ million)1 2,098 2,014 1,812 1,714 1,012 779 625 494 (235) (251) (245) (300) (298) (353) (435) (381) (499) (549) (538) (477) (413) (523) (462) EBITDA Net Financial Result CAPEX Income Tax FCF Dividends 2010 2011 2012 1H 2013 TTM 1Amounts a
Slide 9: Argentina
Endesa Chile consolidated results 1H 2013 Argentina Installed Capacity: 3,652 MW Market Share*: 12% Total Generation: 4,481 GWh EL CHOCÓN Hydro El Chocón: 1,328 MW 1,328 MW Million US$ 1H 2013 1H 2012 Change Revenues 35 51 (31% ) EBITDA 13 29 (54% ) EBITDA Margin 38.0% 56.9% (33% ) Physical Sales (G
Slide 10: Peru
Endesa Chile consolidated results 1H 2013 Peru Installed Capacity: 1,657 MW Market Share*: 23% Total Generation: 4,141 GWh EDEGEL Cuenca Río Rímac: 552 MW 45% Hydro Yanango: 43 MW 746 MW Chimay: 151 MW Ventanilla: 485 MW 55% Thermal Santa Rosa: 426 MW 911 MW Million US$ 1H 2013 1H 2012 Change Lima:
Slide 11: Chile
Endesa Chile consolidated results 1H 2013 Chile Installed Capacity1: 5,571 MW Market Share*: 30% Total Generation1: 9,109 GWh Tarapaca ENDESA CHILE Los Molles: 18 MW Rapel-Sauzal: 466 MW D. Almagro–Taltal Maule: 875 MW 62% Hydro Laja: 940 MW 3,456 MW Huasco Ralco-Pangue: 1,157 MW Los Molles Tarapaca
Slide 12: Colombia
Endesa Chile consolidated results 1H 2013 Colombia Installed Capacity: 2,914 MW Market Share*: 20% Total Generation: 6,311 GWh EMGESA Guavio: 1,213 MW Cartagena Betania: 541 MW 85% Hydro 2,470 MW Río Bogotá: 716 MW Cartagena: 208 MW 15% Thermal Bogotá Termozipa: 236 MW 444 MW Million US$ 1H 2013 1H
Slide 13: Brazil
Endesa Chile consolidated results 1H 2013 Brazil Installed Capacity: 987 MW Market Share*: 1% Total Generation: 2,216 GWh CACHOEIRA Hydro Fortaleza Cachoeira: 665 MW 665 MW Million US$ 1H 2013 1H 2012 Change Revenues 130 151 (14% ) EBITDA 90 105 (14% ) Cachoeira Rio de Janeiro EBITDA Margin 69.5% 69
Slide 14: Projects Under Construction: El Quimbo
Endesa Chile consolidated results 1H 2013 Projects Under Construction El Quimbo • Hydro power plant. • Located in the Huila Department • Utilizes stream coming from Magdalena River • 400 MW of installed capacity • Estimated load factor: 60% • River detour in March 2012. 14
Slide 15: Projects Under Construction: Salaco Chain
Endesa Chile consolidated results 1H 2013 Projects Under Construction Salaco Chain (optimization) • Repowering the minor plants to reach 221 MW power. • Located in the Bogotá River system. • Optimization works started on January 2013. • 145 MW will be added to the capacity. 15
Slide 16: Projects Under Study: Taltal
Endesa Chile consolidated results 1H 2013 Projects Under Study Taltal (Convertion) • Closure engineering work to the existing LNG power plant. Conversion to Combined Cycle. • Located in the Antofagasta region (SIC). • 125 MW will be added to the current 245 MW capacity. 16
Slide 17: Projects Under Study
Endesa Chile consolidated results 1H 2013 Projects Under Study Los Cóndores • Hydro power plant • Located in San Clemente, in the Maule Region • 150 MW of installed capacity • EIS approved. Curibamba • Hydro power plant • Located in Junín Department, utilizes streams coming from Comas and Uchubamba
Slide 18: Projects Under Study
Endesa Chile consolidated results 1H 2013 Projects Under Study Punta Alcalde • Thermal, Coal-steam power plant • Located in Huasco, in the Atacama Region (SIC) • 740 MW of installed capacity • EIS approved by the Ministers Committee on Dec 3, 2012 Neltume • Hydro power plant, run of the river • Loca
Slide 19: Projects Under Study: HidroAysén
Endesa Chile consolidated results 1H 2013 Projects Under Study HidroAysén • Hydro power plants located in Aysén Region • 2,750 MW of installed capacity • EIS approved for the generation plants (5) • One of the most efficient hydroelectric projects in the world, using renewable resources • Average lo
Slide 20: Expected Evolution for Endesa Chile Installed Capacity
Endesa Chile consolidated results 1H 2013 Expected Evolution for Endesa Chile Installed Capacity Percentage increase over installed capacity, year 2011 (13.845 MW) 19% 490 740 188 150 6% 125 400 400 3% 145 145 350 350 350 13,845 13,845 13,845 13,845 2011 2012 Under Construction On Basic Engineering
Slide 21: Conclusions
Endesa Chile consolidated results 1H 2013 Conclusions 1.- Severe drought affecting Chile 2.- Diversified portfolio 3.- Accounting effects 4.- Situation with BG 5.- Situation with Gas Atacama 21
Slide 22: Endesa Chile consolidated results 1H 2013
Endesa Chile consolidated results 1H 2013 “This document is the property of ENDESA and therefore must not be disseminated or published without ENDESA's prior written consent. The content of this document is provided for information purposes only and therefore has no contractual substance and should