Mining Americas Inc. · TSX:MAI

Mining Americas — Minera Alamos — Investor Presentation (February 2026)

21 slides from Mining Americas's investor presentation, February 2026

  1. Slide 1: Growing Gold Production in the Americas

    Growing Gold Production in the Americas TSX.V: MAI | OTCQX: MAIFF February 2026

  2. Slide 2: Forward Looking Statement & Cautionary Note

    Forward Looking Statement & Cautionary Note Cautionary Statement Regarding Forward Looking Statements This presentation contains “forward-looking information” within the meaning of applicable Canadian securities laws. Forward-looking information includes statements that use forward-looking terminolo

  3. Slide 3: Minera Alamos Overview

    Minera Alamos Overview Rapidly Growing Gold Production in the Americas Americas-Focused Portfolio Investment Highlights Junior Gold Producer with Cash Flow to Fund Growth to Intermediate Status – Cash flowing gold production with significant margins at spot prices – Pan Mine production (2026 guidanc

  4. Slide 4: Cornerstone Assets

    Cornerstone Assets Most Projects are Permitted, Past-Producing, and Low Capital Intensity Gold Pan Copperstone Cerro de Oro Rock Mine Project Project Project Location Nevada Arizona Nevada Zacatecas Status Producing Pre-Construction Development Development (internal trade-off studies) (awaiting perm

  5. Slide 5: Emerging Intermediate Gold Producer

    Emerging Intermediate Gold Producer Portfolio Highlights Production Potential (koz Au)4 Opportunity to increase production through exploration success Asset Pan Mine Copperstone Cerro de Oro Gold Rock 130-165 Updated study in- PEA PEA Stage Operating progress (permits pending) (permitted) (permitted

  6. Slide 6: Pan Operating Complex - Nevada Overview

    Pan Operating Complex - Nevada Overview Open-pit, conventional heap-leach assets Pan Mine Highlights Pan Mine Historical Results • Located East Central Nevada, ~28 km SE of Eureka, along Battle Mountain 2022 2023 2024 2025 trend; 100% owned by Minera Alamos Ore on Pad 3,030 4,593 4,333 4,649 • Open-

  7. Slide 7: Pan Operating Complex Opportunities

    Pan Operating Complex Opportunities INFRASTRUCTURE MAP Claim boundary Access roads Stable Operation with Exploration Upside Pan Resources Open pits • Mine restarted in mid-2017 by Fiore Gold, over 8 years of continuous production Leach pads (35-42 koz/year) • Successful track record of resource conv

  8. Slide 8: Gold Rock Geology & Exploration Upside

    Gold Rock Geology & Exploration Upside Highlights • Gold Rock hosts Carlin-type mineralization in folded and faulted North high walls of EZ Junior Pit 2018 Fiore Gold drillhole locations (Gold Rock Proj.) Paleozoic carbonate rocks, similar to major Nevada gold belts • Gold is structurally controlled

  9. Slide 9: Copperstone Asset Overview

    Copperstone Asset Overview Acquired in 2025 – near-term development with low capex, quick build-period Location Map Project Highlights – Arizona, USA Location & Property: – 13.8 sq mile package (surface + mineral rights) – 19 miles north of town of Quartzite – Discovered in 1968; Acq. by MAI in Feb.

  10. Slide 10: Copperstone Gold Deposit Upside and Work Plan

    Copperstone Gold Deposit Upside and Work Plan Potential to significantly expand defined resource of 300koz indicated and 197koz inferred Upside Exploration Potential Open Pit: – First order priority is the projection to surface of the lower mineral zone, with potential to be an open pit; Followed by

  11. Slide 11: Copperstone Exploration

    Copperstone Exploration Copperstone Zone South-West Target | target historic cluster of high-grade Copperstone Zone | target downdip extension to intercepts for accretion of additional resource confirm mineralization extends to depth for accretion of resources. Along strike holes can convert resourc

  12. Slide 12: Cerro de Oro Asset Overview

    Cerro de Oro Asset Overview Location Map Project Highlights – Zacatecas, Mexico Location & Property: – 5 mining concessions covering 6,500 ha – 3km from town of Melchor Ocampo – Discovered in the 1500’s Milestones: – Acquired by Minera Alamos in 2020 – Conventional Open Pit – ROM heap leach – Mine L

  13. Slide 13: Cerro de Oro Asset Overview

    Cerro de Oro Asset Overview Exploration Overview • Gold only porphyry system with associated skarn zones - At least two mineralized porphyry phases. • Mineralization associated with porphyry type A/B quartz veinlets, potassic, and skarn alteration with magnetite, pyrite, and only traces of chalcopyr

  14. Slide 14: Competitive Positioning

    Competitive Positioning Poised for re-rating to Junior/Intermediate Producer Peer valuation multiples Market Capitalization (US$B) 2026E Au Production (koz)1,2 Consensus P/NAV (ratio)3 Wesdome $2.8 Wesdome 203 Andean Precious 1.46x i-80 Gold $1.5 Galiano Gold 185 Hemlo Mining 1.45x Rio2 $1.5 Orezone

  15. Slide 15: Cap Structure & Ownership

    Cap Structure & Ownership Research Coverage Capitalization Table Allison Carson Share Price (Feb 4, 2026) C$/sh C$5.63 Rabi Nizami, P.Geo. Share Price (Feb 4, 2026) US$/sh US$4.16 Mgmt & Insiders High Common Shares O/S M 108.0 Net worth Options M 7.2 2% 7% Warrants (strike @ C$7.05/sh) M 39.9 Retail

  16. Slide 16: Execute, Explore, Grow

    Execute, Explore, Grow Re-invest in Asset Pipeline, Optimize Portfolio for Growth Mid-Tier Producer Accretive M&A Maximize Shareholder Value through Executing Growth Strategy Exploration & Discoveries Potential to Improve Grade, Shareholder Extend Mine Life Value & Market Intermediate Producer Devel

  17. Slide 17: Key Management & Board

    Key Management & Board Experienced Management Team – Mine and Company Builders Management Team Board of Directors Darren Koningen, P.Eng. Jason Kosec, B.Geo. CEO, Director Chairman, Director 30 years of engineering/ metallurgical experience, led El Castillo 15 years experience in mineral resources,

  18. Slide 18: Appendix

    Appendix TSX.V: MAI | OTCQX: MAIFF

  19. Slide 19: Reserves & Resources – Minera Alamos

    Reserves & Resources – Minera Alamos Tonnes Grade Contained Mt Au (g/t) Ag (g/t) Cu (%) Au (koz) Ag (koz) Cu (kt) Copperstone Measured 0.8 8.12 - - 196 - - Indicated 0.5 7.09 - - 104 - - Total M&I 1.2 7.74 - - 300 - - Inferred 1.0 6.30 - - 197 - - Santana Measured 6.5 0.65 - - 136 - - Indicated 3.1

  20. Slide 20: Reserves & Resources – Pan Mine and Gold Rock

    Reserves & Resources – Pan Mine and Gold Rock Tonnes Grade Contained Mt Au (g/t) Au (koz) Pan Mine Measured 0.1 0.47 1 Indicated 22.6 0.35 257 Total Resources 22.7 0.35 258 Inferred 1.1 0.34 12 Leach Pad Inventory - - 30 Gold Rock Project Measured - - - Indicated 19.0 0.66 403 Total Resources 19.0 0

  21. Slide 21: Reserves & Resources (Cont’d)

    Reserves & Resources (Cont’d) Copperstone Mineral Resources have an effective date of February 15, 2023. The Qualified Person responsible for the Mineral Resource estimate is Mr. Richard A. Schwering, P.G., SME-RM, an employee of Hard Rock Consulting, LLC. Mineral Resources that are not Mineral Rese

Minera Alamos — Investor Presentation (February 2026) on 6ix