Vantage Metals Limited · ASX:VAN
Vantage Metals — Belararox — Investor Presentation (January 2022)
16 slides from Vantage Metals's investor presentation, January 2022
Slide 1: Successful ASX Listing Raises $5M
Successful ASX Listing Raises $5M ASX: BRX A polymetallic Zn-Cu-Pb-Au-Ag VMS system Au Orogenic System January 2022
Slide 2: Disclaimer, Forward Looking & Competent Person Statement
Disclaimer, Forward Looking & Competent Person Statement Belararox Limited (”The Company”) does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or needs of any recipient of this document. Recipients of this document should carefull
Slide 3: Investment Highlights
Investment Highlights • Led by a proven board, management and advisory team. • Mineral explorer focused on battery and renewable energy markets. • Targeting zinc, copper, gold, silver, nickel and lead resources. • 2 Projects DRILL READY with holes planned. • 100% interests in all tenements. • Delive
Slide 4: Board
Board Mr Neil Warburton Mr Arvind Misra Ms Michelle Stokes Mr Steve Lowe Non-Executive Chairman Managing Director Non-Executive Director Independent Non-Executive Director Mr Warburton’s 40-year career in mining started as an Mr Misra is an accomplished mining engineer Ms Stokes has over 35 years of
Slide 5: Management
Management Dr Greg Partington Ms Susan Park Ms Dannika Warburton Chief Technical Consultant and acting EM Company Secretary Investor Relations Dr Gregor Partington is the Managing Ms Park has over 25 years’ experience in the Dannika is the Founder of Investability, an Director of Kenex, which is foc
Slide 6: Corporate Overview
Corporate Overview TOP 20 SHAREHOLDERS Rank Name Units % of Units CAPITAL STRUCTURE 1 MONDOROX PTY LTD 7,250 000 16.73 2 EPOCC PTY LTD 5,000.000 11.54 3 METALLUMCAPITAL PTY LTD 3,000.000 6.92 Share Price IPO $0.20 4 MICHLANGE PTY LTD <THE NF WARBURTON FAMILY A/C> 2,250.000 5.19 Shares on Issue 43,33
Slide 7: Project Portfolio
Project Portfolio BELARA PROJECT (NSW) • 100% owned. • A 643 sq. km tenement package in Central New South Wales. • Two historic zinc-copper-gold mines (Belara and Native Bee). • Shallow targets remain, drilled to 400m, located close to good infrastructure. Location of the Belara Project tenements wi
Slide 8: Project Portfolio
Project Portfolio BULLABULLING PROJECT (WA) • 100% owned. • A 48.84 sq. km tenement package 60 km west-southwest of Kalgoorlie. • The Bullabulling Project Surrounds the 3 M oz Bullabulling Gold Project and Nepean Nickel mine. • 3D geology and prospectively mapping completed and drill targets generat
Slide 9: Exploration Strategy
Exploration Strategy • Deliver a JORC 2012 Inferred Resource over the historic mines at Belara and Native Bee. • Explore the potential for extensions and repetitions of massive sulphide mineralisation using electrical geophysical techniques. • 3D geological models will be developed using Artificial
Slide 10: March Quarter Work Plan
March Quarter Work Plan • Gravity Survey - high-resolution gravity survey over the regional 5.5 km long Belara mineralised trend. • Gradient Array IP Survey – Multiple surveys over the regional 5.5 km long Belara mineralised trend and the potential porphyry signature • Resource Drilling - Commenceme
Slide 11: Belara Trend 3D Magnetic Inversion and Planned Geophysics
Belara Trend 3D Magnetic Inversion and Planned Geophysics • 3D magnetic inversion identifies potential depth and strike extensions. • Significant opportunities to test along strike and at depth. Page 11
Slide 12: Historical and Planned Drill Locations
Historical and Planned Drill Locations Historic Drill Hole Locations • 32 RC Holes (approx. 5,308 m) • 2 x DD holes (NQ3) (approx. 400 m) • Holes range from 59 to 350m deep Page 12
Slide 13: Belara Long Section – Historical, Proposed Holes
Belara Long Section – Historical, Proposed Holes • Limited drilling in vertical areas between 0- 50m, 100-150m, 200-250m and 300-400m. • Proposed drilling to infill these areas and confirm the historic drill results. • Mineralisation remains open to the south and at depth • Detailed gravity and elec
Slide 14: Short Path to 2012 JORC Resource
Short Path to 2012 JORC Resource YEAR 1 EXPLORATION AND DEVELOPMENT PLAN MONTH Feb 22 Mar 22 Apr 22 May 22 June 22 July 22 Aug 22 Sept 22 Oct 22 Nov 22 Dec 22 Jan 23 Belara – Native Bee Initial drilling Modelling and results estimation Ground Surveys. Extension drilling based upon initial geophysics
Slide 15: Sustainability
Sustainability ENVIRONMENTAL SOCIAL GOVERNANCE • Minimise ground disturbance. • Engage with local communities, • Incorporate best practice • Minimise emissions. stakeholders and suppliers to create a environmental, ethical and social • Minimise water usage. positive contribution to the region. respo
Slide 16: Contact Information
Contact Information www.belararox.com.au BRX For more information, please contact Arvind Misra MD arvind.misra@belararox.com.au 0417 934 998 Dannika Warburton dannika@investability.com.au 0401 094 261 Page 16